Kevin Mills

Kevin Mills

Followers of Kevin Mills184 followers
location of Kevin MillsYorba Linda, California, United States

Connect with Kevin Mills to Send Message

Connect

Connect with Kevin Mills to Send Message

Connect
  • Timeline

  • About me

    Put 45 years of industrial experience to work for you

  • Education

    • North Ridgeville High School

      -
    • University of Alabama

      1975 - 1979
      B.S; M.B.A Mechanical Engineering

      Activities and Societies: Swim Team

    • The University of Alabama

      -
      Bachelor of Science - BS Mechanical Engineering 3.6 / 4.0

      Activities and Societies: Swimming

  • Experience

    • Southern Company Services

      Feb 1980 - May 1994

      Reviewed advanced and conventional coal plant air emission control technologies and determined economics in response to expected mercury and toxic metal control legislation. Assisted in program development and evaluated OEM proposals for the Wilsonville Hot Gas Clean-up Coal Gasification Facility. Developed a proprietary compact particulate, NOx reduction, SO2 oxidation, and acids condensation process. Successfully started-up a proprietary salt-splitting pilot process. Managed the EPRI Plant Scholz Fabric Filter Pilot Plant. Conducted the pilot scale Low Temperature Heat Recovery project (heat pipes). Played a lead role in diagnosing and economically correcting power plant draft, coal pulverization systems, cooling towers and electrostatic precipitator deficiencies. Participated in the commissioning of the Vogtle 2 cooling system. Show less Diagnosed failed and inadequate coal and nuclear steam and cooling cycle heat exchanger components, developed specifications, qualified bidders and evaluated quotes, determined balance of plant effects, selected, commissioned and tested replacement equipment. Determined power plant performance and economic effects for replacement coal pulverizers. Accurately modeled the steam cycles thermal performance and life cycle economics with each retrofit. Worked with steam turbine OEM's to evaluate extraction flow changes as a result of heat exchanger retrofits. Assisted in evaluating steam cycle metallurgy (condenser to boiler to turbine), turbine blade erosion, boiler feed pump flow anomalies. Determined numerous draft system performance shortfall root cause and determined corrective actions required. Show less Developed scope, cost estimates, schedules, and determined operating conditions for major fossil plant retrofits; Organized design teams, monitored engineering from conceptual, installation, and start-up of multiple projects simultaneously ranging to $30,000,000. Total responsibility at one time was approximately $100,000,000. Technical lead on availability improvement program on 5,000MW of supercritical pulverized coal plants which successfully utilized the fixed five year O&M budget in improving the fleet availability from below 50% to over 80% within four years.Mills Engineering & ConstructionExpert Witness in Activated Metals v. Progressive Industries (root cause analysis of catalyst grindingcircuit explosion) and the Tilden Mines v. Hamon (root cause analysis of WESP accelerated corrosion.)Developed, constructed and sold over two million dollars of residential and commercial real estate. Show less

      • Senior Research Engineer

        Nov 1986 - May 1994
      • Specification Engineer

        Jun 1985 - Nov 1986
      • Production Services Engineer

        Feb 1980 - Jun 1985
    • Southern Environmental, Inc

      May 1994 - Oct 1996
      Chief Engineer

      In charge of equipment design, cost estimates and proposals submittals. Developed proposalautomation system which assists Sales Managers in sizing ESP's, developing proposals and designspecifications, schedule, and a line item cost estimate which was turned over to the designers andproject managers in a consistent manner. Proposed ESP engineering and project management systemswhich would decrease the man-hour requirements, reduce errors and increase profitability. Played a keyrole in obtaining $60M worth of contracts. Show less

    • Environmental Elements Corporation

      Oct 1996 - Aug 1998
      Director, New Product Development

      Director, Technology Development and CommercializationDesigned proof of concept tests targeting methods of improving the electrostatic precipitator, fabricfilter, and scrubber performance. Demonstrated an advanced pilot ESP at a paper mill and reportedresults. Offered technical assistance for the non-standard precipitator proposals (i.e.; WESP's, highcarbon ash ESP, rebuilding non-standard EEC ESP's, designing specialized discharge electrodes whererequired). Developed draft business plan for markets created by Title III regulations. Inspected,diagnosed, and proposed solutions to industrial customers with EPS's operating below requiredperformance. Show less

    • Wolverine Industrial, Inc

      Sept 1998 - Feb 2001
      President

      Executed an exclusive reseller agreement with Progressive Industries, LTD., for their patentedMicroSizerTM technology to the North America Power & Paper Industry. Wolverine Industrial, Inc.concentrated on the processing of solid fossil fuels (milling and combustion).

    • Innovative Energy Global, Inc

      Mar 2001 - May 2009
      Chief Technology Officer

      Developed a proprietary fast pyrolysis process. Worked with Technip and Weitz to design and constructa 13 tph process demonstration unit (PDU). Worked with Hazen Research to commission the PDU. Ledthe development of the start-up and operational controls art and process de-bottlenecking. Developedthe business plans and pro-forma. Developed the patent applications for the process, identified over tenpoints of intellectual property, worked with the patent attorneys to review patentability and file patents.This work was begun under the name Biomass Investment Group which was sold to Innovative EnergyGlobal August, 2007. Show less

    • Integrated Green

      May 2009 - Oct 2012
      President

      Developed a proprietary biomass gasification and syngas clean-up systems for integration with smallcombustion turbines, and a related syngas to liquids process. Developed an integrated system fordeveloping customized Front End Engineering Design documents (scope, cost, schedule, andperformance) for these processes. This allows for consistent project procurement, detailed engineering,fabrication, erection, and commissioning.

    • Technip

      Oct 2011 - Feb 2025
      Project Manager

      Renewable Energy and Petro-Chem Projects. Specializing in Client Charter definition, front end project development and asset management; revenue agreements, fuel and feedstock hedging strategies, finance and project structure, siting and need approvals, project delivery plans, competitive analysis, technology commercialization, technical and commercial risk mitigation planning of project term, creating methods to exceed investor hurdle values, root cause analysis, capital budgeting, asset management, and availability improvement. Show less

    • Self-employed

      Dec 2024 - now
      Competitve Analyst

      Helping the process industry increase profits

  • Licenses & Certifications

    • Professional Engineer (PE)

      Alabama Board of Licensure for Professional Engineers and Land Surveyors