Phillip Jackson

Phillip Jackson

Automotive parts sales and management

Followers of Phillip Jackson1000 followers
location of Phillip JacksonIreland

Connect with Phillip Jackson to Send Message

Connect

Connect with Phillip Jackson to Send Message

Connect
  • Timeline

  • About me

    Production and QA Manager - Concrete Technologist - Institute of Concrete Technology (ICT UK)

  • Education

    • Institute of Concrete Technology London UK

      2018 - 2018
      Certificate in Concrete Technology and Construction Principles Concrete Technology - ICT London Accredited Concrete Technologist

      Activities and Societies: • Properties of fresh concrete • Properties of concrete at early ages • Properties of hardened concrete • Cement and cementitious extenders • Mixing water and chemical admixtures • Concrete mix design • Concrete production • Transporting • Placing and compaction • Protection and curing • Formwork • Reinforcement • Joints • Defects, blemishes and repairs • Mix design and mixes for specialised applications • Sand-cement mixes • Off-shutter and architectural finishes • Temperature and concrete Completed Concrete Technology through Institute of Concrete Technology London and passed with Credit.

    • Concrete Institute

      2016 - 2016
      SCT30 - Concrete Technology Concrete Technology Certificate

      Activities and Societies: Concrete technology Concrete Technology certificate

    • Action Training

      2015 - 2015
      1st Aid 1st Aid Certificate

      Activities and Societies: 1st Aid certificate 1st Aid certificate for legislative appointment

    • Concrete institute of south africa

      2014 - 2014
      Cert Concrete practice - Technology
    • Action training academy

      2013 - 2013
      Cert Health and safety
    • Training academy

      2010 - 2010
      Cert Health and safety Cert

      I completed two certificates in health and safety.Workplace safety for managersIncident and accident investigation

    • Hoerskool Roodepoort

      1996 - 2000
      Matric
  • Experience

    • AutoZone South Africa

      Jan 2001 - Jan 2006
      Automotive parts sales and management

      My duties included the full management function which consisted of, administrating of all resources, stock control, staff management and logistic planning. I was responsible for the startup and development of this branch.

    • Fab-k

      Jan 2006 - Jan 2007
      Site Manager - Mining Construction

      Company closed downMy main task involved the general overseeing of all current projects within the mining industry, mostly Anglo Platinum. Which included concrete construction, steel construction and fiber glass. This included managing all site staff and general logistics regarding construction, major lifts and compliance with all health and safety regulations at any given time. Ensuring that suitable and competent staff is employed. Full project managing function when required. Daily diary management and process flow including reports. Show less

    • Jackson Technical Trading

      Jan 2007 - Jan 2009
      Business Owner

      I registered a closed corporation within the technical manufacturing and production fields. I acted as the general manager, performing all buying and technical queries. I also acted as a welder and fitter for the business. We did minor home renovations and any maintenance, whether privately owned homes or industrial. In this case I performed the full site manager and safety functions.

    • Cemcrete

      Jan 2009 - Jan 2012
      Factory Manager - Specialized Cement and paint manufacturing

      Responsible for all manufacturing activity, plant maintenance, facilities maintenance, quality control, housekeeping, security, safety and workplace discipline in the facility under my control to comply with company policies at all time. Also assist in the planning and execution of project related matters when needed. I reported directly to the General Manager and Managing Director on a regular basis, as the factory I ran is not at head office. I was trusted to run my own diary and plan my day to maximize production. My staff consisted of 20 people, which included operators, supervisors, forklift drivers and general laborers. Show less

    • Metier Mixed Concrete (Pty) Ltd

      May 2012 - Feb 2016

      • Conducting monthly stock-take of all raw materials and reporting on variances• Ensuring effective utilization of personnel, development of personnel through internal training and identifying additional training needs• Ensuring that all employees conform to safety and environmental rules and regulations• Ensuring that delivered raw materials conform to quality and quantity specifications laid down by the company• Ensuring that all batched products conform to technical specifications• Ensuring that disciplinary and grievance procedures are followed• Ensuring that suppliers meet necessary order requirements• Ensuring that Sub-Contractors or own-drivers meet the necessary delivery requirements, including liaison with customers, appearance and upholding of company image• Compiling yearly budget and controlling it monthly and reporting on variances• Ensuring sound relationships between customers and the company• Ensuring a sound knowledge of new developments and future planning in his/her area of responsibility• Ensuring that company assets are being maintained in accordance with a planned maintenance schedule and that maintenance is carried out timeously, in conjunction with Maintenance Department• Checking all customer sites prior to delivery to ensure safe and efficient access for trucks• Checking all sites with pumping requirements to ensure planning is done correctly and liaising with the Pump Division• Employment of production staff in conjunction with Operations Manager and Human Resources Department Show less Company requested that I relocate back to JHB due to growth of their operations and the workload that was put on current plants. I was tasked with evaluating and helping/fixing current plant to set correct standard etc.After this I was tasked with the construction, together with sub-contractors, of a new plant and manage this process from earthworks right up to a fully operational plant concrete. Including staff appointments, setting up admin systems and all aspects needed for an operational plant. The plant is currently operational. Show less

      • Plant Manager - Readymix Concrete

        May 2012 - Feb 2016
      • Plants Manager - Readymix Concrete

        May 2012 - Feb 2016
    • Holcim

      Mar 2016 - Sept 2016
      Operations Manager Ready Mix

      Left after a short time here due to unforeseen retrenchment within Lafarge.My responsibilities included but was not limited to plant control for various sites, staff management, safety management, quality management, customer relations and achieving monthly budget set out. I was responsible for all aspects of functioning of all facilities and staff under my control.• Conducting monthly stock-take of all raw materials and reporting on variances• Ensuring effective utilization of personnel, development of personnel through internal training and identifying additional training needs• Ensuring that all employees conform to safety and environmental rules and regulations• Ensuring that delivered raw materials conform to quality and quantity specifications laid down by the company• Ensuring that all batched products conform to technical specifications• Ensuring that disciplinary and grievance procedures are followed• Ensuring that suppliers meet necessary order requirements• Ensuring that Sub-Contractors or own-drivers meet the necessary delivery requirements, including liaison with customers, appearance and upholding of company image• Compiling yearly budget and controlling it on a monthly basis and reporting on variances• Ensuring sound relationships between customers and the company• Ensuring a sound knowledge of new developments and future planning in his/her area of responsibility• Ensuring that company assets are being maintained in accordance with a planned maintenance schedule and that maintenance is carried out timeously, in conjunction with Maintenance Department• Checking all customer sites prior to delivery to ensure safe and efficient access for trucks• Checking all sites with pumping requirements to ensure planning is done correctly and liaising with the Pump Division• Employment of production staff in conjunction with Human Resources Department Show less

    • BergMix

      Nov 2016 - Dec 2021
      Technical Manager

      Full Concrete Technology FunctionTechnical and Quality controlNew mix design and mix design changesTrial mix planning and control and roll out planningQuality control - Technical and plantResearch and development Concrete and PlantTraining and staff developmentPlant audits and standards managementTechnical plant related problems solvingOversee full Concrete Production/Operations at various plants as neededPrecast ConcreteEstablishing of Precast division from scratchIncluding but not limited to planning, production, equipment installations and modificationsFull HR function - Hiring of staff, management and disciplinary processesConcrete mix design and quality control Show less

    • Stresslite Precast

      Jan 2022 - now
      Production and QA Manager

      My daily functions include but is by no means limited to:Monitor Concrete Quality and Performance daily to ensure minimum requirements are met at all timesMonitor Concrete Mix Designs to ensure all requirements are met and advise Structural Design Engineer on any potential changes to Concrete DesignFull Quality Management functionChecking all products meet requirements prior to concrete pour and meets all specifications as set out in construction drawingsChecking of all products post pour to ensure they meet all requirements and advise on any remedial work requiredPlanning, in conjunction with the projects manager, site activity and all related logistics involved in site installations and teamsAdministrative record keeping of all ongoing project requirements and production progressEnsure factory works are done as effecient and cost effective as possible in conjuction with factory manager/foremenEnsure health and safety standards are maintained within items that fall in my area of responsibilityEnsure effecient and on time loading of trucks Show less

  • Licenses & Certifications

    • Concrete Technology

      Institute of Concrete Technology London UK
      May 2018
    • Concrete Technology - SCT30

      Concrete institute south africa
      Aug 2016
    • Disciplinary Process and chairing of company hearings

      Labournet HR Solutions
      Jun 2015
    • Concrete Practice - SCT20

      Concrete institute south africa
      Mar 2013
    • Committee Member KZN Region

      Concrete Society of Southern Africa NPC
      Jan 2019
  • Honors & Awards

    • Awarded to Phillip Jackson
      Committee Member KZN Region Concrete Society of Southern Africa January 1, 2019 Serving on the KZN branch committee for the Concrete Society of Southern Africa
    • Awarded to Phillip Jackson
      Plant of the Year 2015 Metier Mixed Concrete Dec 2015 Achieved overall best results and achieved plant of the year with the facility and team under my control.
    • Awarded to Phillip Jackson
      Chairman - Health and Safety Committee - Jun 2015 Health and Safety Committe Chairman
    • Awarded to Phillip Jackson
      Plant Audits 2014 - Dec 2014 The new plant I assisted in setting up from ground to operational plant went operational in September 2014 and scored good in yearly audits. The plant was not considdered for awards as it was not operational for a full year.
    • Awarded to Phillip Jackson
      Plant of the year 2013 - Dec 2013 The plant I managed during the year of 2013 was again awarded plant of the year in 2013.
    • Awarded to Phillip Jackson
      Best plants of the year 2012 - Dec 2012 I achieved overall best plant of the year first and second place consecutively with the two busy readymix plants under my control at that time.
    • Awarded to Phillip Jackson
      IronMan Triathlon Finisher IronMan South Africa 2007 Completed IronMan Triathlon in 2007.