
Tiem Do
Civil Engineer

Connect with Tiem Do to Send Message
Connect
Connect with Tiem Do to Send Message
ConnectTimeline
About me
Project Manager -18 year experiences
Education

Hanoi University of Mining and Geology
2000 - 2005Universal Degree Specialized in geotechnical engineering Good
Hanoi College of Construction
1997 - 1999College Degree Specialized in civil and industrial construction Good
Experience

OBAYASHI CORPORATION
Mar 2005 - Mar 2006Civil EngineerFROM MARCH 2005 TO MARCH 2006:* Company: OBAYASHI COPORATION*Address: 2nd Floor, Peco Building, 44 Sai Dong Street, Ha Noi City*Project: Thanh Tri Bridge Project - Package 2 *Position: Civil Engineer. *Duties and Responsibilities:- Detail design drawing checking.- Drilling, rebar cage, sonic pipe installation and casting concrete of bored pile.- Rebar and formwork installation and casting concrete for I girder.- Stressing cable for I girder.- Site clearing.- Backfill borrows material.- Soft ground treatment by Plastic Board Drain driving.- Filling for Embankment and structures on the road surface as sub-grade layers, sub-base layers, Asphalt paving.- Control site manpower and subcontractors at site as requested.- Make daily report to Construction Manager/ Project Manager. Show less

TOA Corporation
Apr 2006 - Nov 2008Chief EngineerFROM APRIL 2006 TO NOVEMBER 2008: * Company: TOA CORPORATION * Address: Plot D1, Hiep Phuoc Industry Zone, Nha Be District, HCM City.* Project: Sai Gon Premier Container Terminal Project.* Position: Chief Engineer.* Duties and Responsibilities:- Assisting Project Manager and Superiors in the role of civil engineering sector.- Monitoring and checking detail design drawing, shop drawing.- Monitoring and checking the method statement of Sheet Pile, PHC pile driving, CDM; Rebar, Formwork, Concrete of Wharf structure.- Prepare monthly schedule, 3 months schedule to ensure site works according to master schedule.- Directs and manages all activities of site works.- Coordinate with subcontractors, suppliers, consultants during company business.- Handing technical issues raised from project works.- Provide and update project report to Project Manager.- Check construction site to ensure all activity with the best quality by most saving cost and safety and on time. Show less

BYUCKSAN ENGINEERING CONSTRUCTION CO., LTD
Nov 2008 - May 2010Construction ManagerFROM NOVEMBER 2008 TO MAY 2010:* Company: BYUCKSAN ENGINEERING CONSTRUCTION CO., LTD* Address: Lot 5, Round about A12 of Infrastructure Project, District 2, HCM City.* Project: Imperia Project (High-rise Building). * Position: Construction Manager.* Duties and Responsibilities:- Supervise and coordinate overall project - Prepare implementation programed to cover design- Manage works carried out by subcontractors - Ensure projects are completed to quality standards, on time and within budget - Ensures all engineers and personnel who report to me will be held accountable for the Cost, Quality, Delivery, Safety, Environment performance in their respective areas - To follow and polish up Company Total Management System - Liaison with government authorities and agencies to secure all approvals required for the implementation of the projects- To have good relationships with Client and Consultant to keep a project in progress Show less

Kajima Vietnam Co., Ltd
Jun 2010 - Jan 2024FROM JUNE 2010 TO JANUARARY/2024.* Company: KAJIMA VIETNAM Co., LTD.* Address: 14th Floor, AB Tower, 76 Le Lai, District 1, HCM City.* Projects:• Consulate General of Japan Project, District 3, HCM City.• House Foods Project, Amata Industry Zone, Dong Nai province.• Lixil Global Vietnams Factory Project, Long Duc Industry Zone, Dong Nai province., • Sankyu Project, Nhon Trach 3 Industry Zone, Dong Nai province.• Nippon Chemiphar Project, VSIP1, Binh Duong province.• Vina & Japan Shirogane Logistics Project, Phu My 3, Ba Ria Vung Tau Province.• Panasonic Life Solutions Vietnam Power BU Factory Project, VSIP2A, Binh Duong province.* Position: Project Manager.* Duties and Responsibilities:1. Project Planning and Organization.• Develop a comprehensive project plan, including defining project goals, objectives, and deliverables.• Collaborate with architects, structures, MEP, and stakeholders to establish the project scope and design.• Plan, organize and manage all aspects of the project from inception to completion and develop detailed project plans to track progress and make adjustments as necessary.• Use appropriate verification techniques to manage changes in project scope, schedule and cost.• Setting deadlines for the different phases of project.• Ensure that designs submitted by the designer meet requirements.• Ensure that tender documents are prepared, and tenders are called timely.• Collaborate with designer (architectures, structures, MEP) to ensure the application plans in line with project needs and regulatory requirements, including land planning, architectural design, FF design, and environmental assessment.• Coordinate with authorities’ departments to submit application documents, and track approval progress to ensure timely project approval.2. Budgeting and Cost Management.• Create and manage the project budget, estimate costs, allocate resources, and track expenditures. Show less • Collaborate with contractors, suppliers, and vendors to obtain cost estimates contracts. tender documents are prepared, and called • Monitor and report the project's financial status.• Implement financial control within budget.3. Stakeholder Management.• Act as a point of contact and communicate project status to all participants.• Cultivate and maintain relationships with clients, architects, engineers, subcontractors, and suppliers.• Facilitate regular meetings and discussions to align project objectives and address concerns.4. Risk Assessment and Mitigation.• Conduct comprehensive risk assessments to identify potential project risks and challenges.• Implement risk mitigation strategies and contingency plans to safeguard the project’s progress.• Establish a process for managing project issues and changes.• Implement and manage changes as necessary to meet project outputs.5. Quality Control and Assurance.• Establish robust quality control processes and procedures to ensure adherence to project specifications.• Conduct regular inspections and quality audits to monitor construction activities and materials.• Ensure that project deliverables meet predetermined quality standards.6. Team Leadership and Management.• Identify and allocate necessary resources (people, equipment, materials) effectively. • Hire, train, and supervise project personnel, ensuring they have the necessary skills and resources.• Motivate and inspire the team to achieve project goals and maintain productivity.7. Documentation and Reporting.• Maintain comprehensive project documentation, including contracts, permits, and progress reports• Generate regular progress reports and provide updates to stakeholders.8. Project completion & feedback.• Evaluate project performance, identify and document lessons learned.• Conduct post-project evaluation and identify project success and failure factors. Show less
Project Manager
Jun 2010 - Jan 2024Project Manager
Jun 2010 - Jan 2024
Licenses & Certifications

English Certificate
Science Technology Union for Informatics Application-UIA
Certificate of Experient in Kajima Vietnam
Kajima Vietnam Co., LtdJan 2024
Certificate of Training in Fire Prevention and Fighting
Fire and Rescue Police DepartmentFeb 2023
Certificate of Professional Training in Construction Investment Project Management
State Inspection Agency for Construction Quality - Center for Developing Construction Management and Inspection TechnologyMay 2017
Certificate of Occupational Hygiene and Safety for Labor Protection
Department of Labor, War Invalids and Social AffairsMar 2013
University Diploma
Ministry of Education and TrainingDec 2005
Languages
- enEnglish
- viVietnamese
Recommendations

Airam garcía
Socio responsable del Departamento TributarioSanta Cruz de Tenerife, Canary Islands, Spain
Khairul farhana ramli
Senior Engineering Executive at Hosiden Electronics (M) Sdn BhdBandar Baru Bangi, Selangor, Malaysia
Aditi verma
Finance Analyst- Accounts Receivable, JLL IndiaDelhi, India
Stefan wyss
Raiffeisenbank Zürcher OberlandZurich, Switzerland
Al khan abdul gani
Technopreneur, Co-Founder and Director at Lekir Tech (M) Sdn Bhd, CTO at ResQ, Creative Sandbox Sdn ...Cyberjaya, Selangor, Malaysia
Elvis rocha
Consultor TécnicoOsasco, São Paulo, Brazil
Natalie etheridge
Care workerBlackpool, England, United Kingdom
Jesper kronborg jensen
Chief Business Developer of Digital Gas & System Development Products, Energinet System OperationsDenmark
Malcolm mcmorran
Co Founder, Chief Technology Officer at Hooligan DevelopmentCity of Johannesburg, Gauteng, South Africa
Paul-andré durando
IT Project Manager at @Quicksign |Paris, Île-de-France, France
Vonell quiogue
Integrated Control and Safety Systems Engineer | FS Eng (TÜV Rheinland)Macquarie Park, New South Wales, Australia
Diego alejandro hernandez
Compressed Air | Efficient air stations design | industry 4.0 | Nitrogen Generation | Air sales per...Bogotá D.C. Metropolitan Area
Gabrielle shah
Research Coordinator at San Diego Eye BankGoleta, California, United States
Sydney driggs
Personal Trainer/Regional Operations AdministratorGreater Minneapolis-St. Paul Area
Chris patterson, mba, cebs
Senior Pension Advisor/Manager Pension ServicesHalifax, Nova Scotia, Canada
Vikash maurya
Engineering Manager at Bharti AirtelDelhi, India
Nathalie fransen
Directiesecretaris HLTsamen ,Verbinder 🤝, continu verbeteren 🌱Noordwijk-Binnen, South Holland, Netherlands
Arthur dolan
UX Designer @ Ocado | Product Design BscLondon, England, United Kingdom
Chris gele
Cyber Training Development Engineer at SAICLittle Rock, Arkansas, United States
Heman sabharwal
Partner at Price Waterhouse Chartered Accountants LLPGurgaon, Haryana, India
...