Soji George  (PMI-PMP®)- Const.Site Superintendent

Soji George (PMI-PMP®)- Const.Site Superintendent

Quality Control Inspector

Followers of Soji George  (PMI-PMP®)- Const.Site Superintendent274 followers
location of Soji George  (PMI-PMP®)- Const.Site SuperintendentAbu Dhabi Emirate, United Arab Emirates

Connect with Soji George (PMI-PMP®)- Const.Site Superintendent to Send Message

Connect

Connect with Soji George (PMI-PMP®)- Const.Site Superintendent to Send Message

Connect
  • Timeline

  • About me

    Mechanical Engineer with more than 23 years of professional work experience with EPC contactors in the oil and gas production and Offshore fabrication Facilities with various sectors.

  • Education

    • K V G College of Engineering, SULLIA

      -
      Mechanical Engineering Mechanical Engineering
  • Experience

    • Rolins Engineering Constructions

      Sept 2001 - Feb 2004
      Quality Control Inspector

      • Details of work Done for Various Projects• Fabrication and Inspection of Mumbai North Water Injection (MNW) Offshore Living Quarter with Heli Deck at Larsen & Toubro Manufacturing Yard surat.• Fabrication and Inspection of HV Offshore Living Quarter with Helideck at Larsen & Toubro Manufacturing Yard surat.• Re vamping of sulphur unit For Piping and structural works at Reliance Petro chemical Refinery, Jamnagar Gujarat.

    • Savita Constructions Private Limited

      Apr 2004 - Feb 2005
      Quality Control Engineer

      • Details of work Done for Various Projects. • Expansion of the Caster unit at ESSAR Steel Plant, Hazira, Surat.The job includes the Fabrication, Laying, Testing and Inspection of U/G and A/G pipeline (CS, SS).

    • Gulf Oil & Gas LLC

      Mar 2005 - Jun 2008
      QA/QC ENGINEER

      Details of work Done for Various Projects.• Floor plate & Annular plate Replacement of Crude Oil Storage Tank No: 443S001 (100 Meter Dia & 1.1 Million Barrel Storage Capacity) At Zirku Island, Zadco-AbuDhabi.• Crude Oil Piping Modification for Parallel Operation Mode at Zadco-UAD Oil Field, Abu Dhabi. The job includes Fabrication, Inspection, Erection & Testing of pipeline.• Refurbishment of Marine Jetty Terminal & Sulphur Handling Jetty Terminal at Takreer Ruwais Refinery- Abu Dhabi. The work comprising the replacement of fender units, various piping Including Insulation and heat tracing, Structural steel refurbishment.• Access Platforms, Protection Sheds at various plant locations and Refurbishment of Riser support arrangement at LNG and LPG tank farm In ADGAS Refinery Plant at Das Island.• Re routing of pipeline (CS, SS, GRE) at Takreer Refinery- Abu Dhabi. Show less

    • Larsen & Toubro

      Aug 2008 - Apr 2012
      Sr.QC Supervisor(CSWIP3.1)

      Details for Projects: • Fabrication & Inspection of Offshore Jacket & Deck for ADMA-OPCO (Umm Lulu & Nasr Field).• Fabrication & Inspection of 8 Leg –Jacket (12000 MT), Piles & Piping (Riser Lines) for the project of ONGC MNP and MHSRP-RS15 Project Fabrication & Inspection of Oil Rig (FD- VII RIG Project). • Fabrication & Inspection of Offshore Jacket, Flare, Bridge & Piping for the Project of Maersk Oil Qatar (MOQ-14 Project).Overview of Experience:03 years of experience in the Fabrication, Inspection and testing of Offshore Facilities like Jackets, Top side decks & Deck piping of the various projects for Clients ADMA-OPCO (Abu Dhabi Marine operating Company), MAERSK Oil Qatar &ONGC. Show less

    • Saipem Taqa Al-Rushaid Fabricators Co. Ltd.

      Jun 2012 - Jun 2023
      Sr. Lead Quality Control Mechanical / Welding Supervisor (Aramco approved)

      Details for Projects: • Fabrication of Aramco Offshore Facilities like Jacket, Deck, Piping & Subsea pipeline for Aramco LTA-I/II & WASIT Projects.Overview of Experience: Exclusive 11 years of experience in the Fabrication, Installation, Inspection and testing of Offshore Facilities like Jackets, Top side deck, Deck piping, Subsea pipeline, SSVS etc. for the various LTA projects of Saudi Aramco.

    • Aramco

      Jul 2023 - now
      Construction Site Superintendent (Mechanical/ Structural/Piping)- Zulf Increment Oil Project

      Details for Projects:• Fabrication of Zuluf Increment Facilities for Package 4&5 of ZulfAH East &West Oil Facilities.• Fabrication, Transportation and Installation of 24 Oil production platform well head decks, 05 Tie-In platform decks and associated Subsea pipelines.Overview of Experience:Client-side rep and seconded to Saudi Aramco as a key part for project management team (SAPMT)my main duties included, but not limited to, overseeing the Fabrication Yards & various construction site of Saudi Aramco main contractors NPCC at Abu -Dhabi with the addition of their Sub-contractor organizations in the fabrication & construction of Offshore Facilities for Saudi Aramco in Kingdom Oil & Gas programs. Show less

  • Licenses & Certifications

    • ASNT LEVEL-II in RT,PT, MT

      ASNT
    • ASNT Central Certification Program Level II - Magnetic Particle Testing (ACCP-MT)

      GAIT India
    • ASNT NDT Level II Certification - Liquid Penetrant Testing (PT) (ASNT-NDT2-PT)

      GAIT India
    • CSWIP 3.1 WELDING INSPECTOR

      CSWIP Regulations
    • ASNT NDT Level III Certification - Radiographic Testing (ASNT-NDT3-RT)

      GAIT India
    • ISO 9001 Lead Auditor - Quality Certification

      IRCLASS Systems and Solutions Pvt. Ltd
      Aug 2019
    • Project Management Professional (PMP)

      Project Management Institute (PMI)
      Nov 2024