Ahmed Waheed

Ahmed Waheed

Section Site Engineer

Followers of Ahmed Waheed876 followers
location of Ahmed WaheedCairo, Egypt

Connect with Ahmed Waheed to Send Message

Connect

Connect with Ahmed Waheed to Send Message

Connect
  • Timeline

  • About me

    Architect Manager at DMG | Mountain View

  • Education

    • Helwan University Cairo

      2000 - 2005
      Bachelor of Architecture (B.Arch.) Architectural Engineering Good

      Activities and Societies: Playing Football & drawing Try to be clever & talented person & be popular

  • Experience

    • Consolidated Contractors International Company

      Jun 2005 - Jan 2007
      Section Site Engineer

      The design of Fairmont Heliopolis & Towers, Cairo comprises a unique mix of contemporary art and authentic decor that echoes modern Cairo along with the distinct Egyptian heritage. From the unequalled spacious guest rooms to the state-of-the-art conference facilities. This is a new luxury component of the Heliopolis Hotel in Heliopolis; Cairo, Egypt The project land area is 10,000 square meter and 40,000 square meters built up area. The building includes 300 rooms with 835 lavish guest rooms and suites, 15 superlative dining options, 69 thousand square feet of banquet space, unrivalled range of recreational facilities that incorporates squash, tennis, and beach-volley courts, fully-equipped health club, 3 swimming pools, kids pool and play ground, beauty salon, and convenient shopping choices, and a garden atrium of 3,000sqm in a contemporary style, Fairmont Heliopolis & Towers portray a destination on its own. Located in a quiet leafy suburb area Only 5 KM from Cairo International Airport and 18 KM from the famous Egyptian Museum, Khan El Khalili, Cairo Opera House, Project value: 50 million Euros. Responsibilities Included but not limited to: Responding to the site technical demands.  Resolve outstanding progress, coordination, technical issues.  Implement the required modifications as necessary to meet the Client’s objective.  Co-operate with other management in project to establish progress and direction of the project by achieving goals, reaching targets, solving problems, mitigating risks.  Execute all finishing work activities at site.  Ensure the works is carried out as per specification and the latest shop drawing.  Monitoring and controlling all activities on site.  Perform inspection as work progress and try to get approval from consultant.   Coordinate the different trades (Structure, Architecture and Electro Mechanicals), to achieve to finalize the progress work in a good way without any demolish. Show less

    • TAV Construction

      Feb 2007 - Nov 2008
      Section Site Engineer

      Terminal 3 is designed for a terminal capacity of 11 million passengers per year. With the completion, terminal TB3 has doubled the capacity of the current facilities of the airport to a staggering 22 million annual passengers. The project comprises the design and construction of a three-level central main building of total built-up area of 164,000 m2 to the latest technologies of security, safety and operational systems, with fifteen swing gate facilities serving international and domestic flights ; airside area with taxiways serving the terminal building; landside bridges/ flyovers serving the traffic to/ from the terminal building and surface car park; automated baggage handling, screening and sorting system and ancillary buildings including apron control tower, power plant, HVAC equipment building, electrical substation, water reservoir and pumping stations. Halls, For Provision of anew central main building spacious enough to accommodate all passengers and facilitate arrival and departure procedures and improve the passenger facilities to a higher level of functioning comfort, convenience and spaciousness, (Price US$ 450 million). Responsibilities Included but not limited to: Responding to the site technical demands.  Resolve outstanding progress, coordination, technical issues.  Implement the required modifications as necessary to meet the Client’s objective.  Co-operate with other management in project to establish progress and direction of the project by achieving goals, reaching targets, solving problems, mitigating risks.  Execute all finishing work activities at site. Ensure the works is carried out as per specification and the latest shop drawing.  Monitoring and controlling all activities on site.  Perform inspection as work progress and try to get approval from consultant.   Co-ordinate the different trades (Structure, Architecture and Electro Mechanicals), to achieve to finalize the progress work in a good way without any demolish Show less

    • Gemmo S.p.A.

      Dec 2008 - Dec 2009
      Facility Site Engineer

      Terminal 3 is designed for a terminal capacity of 11 million passengers per year. With the completion, terminal TB3 has doubled the capacity of the current facilities of the airport to a staggering 22 million annual passengers, making it one of the largest in Africa. The project comprises the design and construction of a three-level central main building of total built-up area of 164,000 m2 to the latest technologies of security, safety and operational systems, with fifteen swing gate facilities serving international and domestic flights including the A380 wide body aircrafts; airside area with taxiways serving the terminal building; landside bridges/ flyovers serving the traffic to/ from the terminal building and surface car park; automated baggage handling, screening and sorting system and ancillary buildings including apron control tower, power plant, HVAC equipment building, electrical substation, water reservoir and pumping stations. Halls are 320x150 m, for processing all arriving, departing passengers and a basement housing facilities including stores, workshops, M&E area baggage handling, etc. Provision of anew central main building spacious enough to accommodate all passengers and facilitate arrival and departure procedures and at the same time improve the passenger facilities to a higher level of functioning comfort, convenience and spaciousness. Also provision of enough gates to cope with present and future peak hour traffic demands (aircraft and passengers), (Price US$ 450 million). Responsibilities Included but not limited to: Responding to the site technical demands.  Resolve outstanding progress, coordination, technical issues.  Implement the required modifications as necessary to meet the Client’s objective  Co-operate with other management in project to establish progress and direction of the project by achieving goals, reaching targets, solving problems, mitigating risks. Show less

    • Consolidated Contractors International Company

      Dec 2009 - Jun 2013

      Designed by the well-known architect; Michael Graves; The Saint Regis Hotel Project is a high end, multiuse development targeting the touristic, business & residential sectors. The project is 195,000 Sq.m, located in Cairo’s heart of attraction area, and facing the Nile River. The three high rise towers, ‘41-stories’ each, consist of the most luxurious 5+ star hotel in town, serviced apartments, fully equipped with all services and facilities. The project includes the state-of-art 8 multi cuisine restaurants, twenty conference & meeting rooms and 3300 m² Ball Room, Spa and swimming pools. Main Contractor: Consolidated Contractor Company ‘CCC’, Owner: Qatari Diar. Project value: 650 million USD. Responsibilities Included but not limited to:  Follow Design Project by implement modification and change schemes as necessary to meet the Client’s objective.  Co-operate with other management in project to establish progress and direction of the project by achieving goals, reaching targets, solving problems, mitigating risks.  Follow the planning and time schedule of the project to monitor the work progress at site.  Responding to the site technical demands.  Supervise shop-drawing reviewing and submission.  Coordination between the various project trades.  Resolve outstanding progress, coordination, technical and design issues.  Resolve any technical conflicts for sub-contractors regard shop drawing or material submittals. Show less In a country which is considered the gateway between Middle East and Africa, Mushaireb is situated at the convergence of the Blue and White Nile rivers in Khartoum with Area 206,000 square meters m2. Its proximity to the presidential palace, business district and Khartoum International Airport makes the development a highly sought-after destination for business, tourism and high-end living. Mushaireb is a mixed use development that integrates residential units, and retail space, plus a provision for 5-star hotel and a commercial space. Combined together, all elements complement each other and provide an exceptional lifestyle destination. The development combines contemporary and Islamic architecture within a secure urban landscape. The importance of an ethnic architectural theme imbibing local traditions and practice to craft an exclusive character for Mushaireb results in a unique landmark in Sudan and it will act as a magnet for both local and international clients . Responsibilities Included but not limited to: Responding to the site technical demands.  Supervise shop-drawing reviewing and submission.  Coordination between the various project trades.  Resolve outstanding progress, coordination, technical and design issues.  Follow Design Project by implement modification and change schemes as necessary to meet the Client’s objective.  Co-operate with other management in project to establish progress and direction of the project by achieving goals, reaching targets, solving problems, mitigating risks Show less

      • Sr.Architectural Engineer

        Jan 2011 - Jun 2013
      • Sr.Architectural Engineer

        Dec 2009 - Dec 2010
    • Limak Group of Companies

      Jun 2013 - Mar 2016
      Sr.Architectural Engineer

      Cairo International Airport terminal building 2 is undergoing a major renovation effort to double its capacity to 7.5 million passengers per year. With a built-up area of 170,000 m2 the project comprises the renovation of the existing Terminal Building 2, the construction of new buildings which includes a new departure hall, and a new airside pier, doubling the existing total built-up area of TB 2. The renovation program will also include a major upgrading and extension of the airside and landside pavements, involving more than 300,000 m2 pavement constructions. The new terminal building size is based on IATA level of service B. The design peak hour capacity will be 3150 (2 way) international passengers. Responsibilities Included but not limited to: Responding to the site technical demands. Supervise shop-drawing reviewing and submission.  Coordination between the various project trades.  Resolve outstanding progress, coordination, technical and design issues. Follow Design Project by implement modification and change schemes as necessary to meet the Client’s objective. Co-operate with other management in project to establish progress and direction of the project by achieving goals, reaching targets, solving problems, mitigating risk Show less

    • Consolidated Contractors International Company

      Apr 2016 - Jul 2019
      Senior Architect Engineer

      City Centre Almaza will become one of the key favored destinations for shopping and entertainment in Heliopolis, Almaza, with a gross leasable area of 103,000m² across more than 270 stores. Being developed with an investment of EGP4bn ($509m), City Centre Almaza will be the largest chain of malls in the Middle East and the meaning diamond in Arabic.Located on the north eastern quadrant of the junction between the Cairo-Suez Road and Nasr Road in Heliopolis, the mall offers easy accessibility in an affluent primary catchment area. The mall will feature 23 restaurants, 18 food courts and nine cafes. A Carrefour hypermarket spread across 13,040m² will be a key feature of the mall. .A 1,700m²space will be dedicated to leisure and entertainment. An open-air plaza concept named Restaurant Courtyard will incorporate dining areas and water features. A 16 multi-screen VOX cinema at the mall will host movies in 2D, 3D, 4DX and extra-large screen formats. A special entertainment area, called Little Explorers, for kids aged between two and seven, will enable the development of physical and cognitive skills, The mall will also include building services such as substation and energy centre, along with parking spaces for 4,000 vehicles. Responsibilities Included but not limited to: Follow Design Project by implement modification and change schemes as necessary to meet the Client’s objective.  Co-operate with other management in project to establish progress and direction of the project by achieving goals, reaching targets, solving problems, mitigating risks.  Follow the planning and time schedule of the project to monitor the work progress at site.  Responding to the site technical demands.  Supervise shop-drawing reviewing and submission.  Coordination between the various project trades.  Resolve outstanding progress, coordination, technical and design issues.  Resolve any technical conflicts for sub-contractors regard shop drawing or material submittals Show less

    • DMG | Mountain View

      Aug 2019 - now
      Architect Manager

      Mountain View I City New Cairo, Egypt:located at the center of New Cairo near to the American University in Cairo, the compound improve the quality of life to meet the needs of its residents by providing Yoga Classes, Play Areas, Restaurants, cafes, Pet Park, Walkways, Outdoor sports & activities, Courts for different sports, The compound is divided upon seven main types with unique architectural themes and designed to please all people needs, so it provide several designs & shapes beginning with Grand Villa, I Apartment, I Villa, Mountain View Villa, Palace, Town Houses & Twin Homes.Mountain View Hyde Park New Cairo, Egypt:Where the community is designed across 200 acre at the heart of New Cairo near to American University in Cairo & is divided upon six main types with unique architectural themes and designed to please all people according to their needs, so it provide them with several designs & shapes beginning with Apartment, I Villa, Mountain View Villa, Penthouse, Town Houses &Twin Homes.Mountain View Chill-out Park 6th of October, Egypt:Designed by American style architecture, Located in the heart of 6th of October City Minutes away from Mehwar and Ring Road & spread on 908,000 m2 area & is divided upon seven main types with unique architectural themes and designed to please all people according to their needs, so it provide them with several designs & shapes beginning with C Villa, I Villa, Mountain View Villa, Palace, Penthouse, Town Houses & Twin Homes.Responsibilities Included but not limited to: Co-operate with management in project to establish progress by achieving target , solving problems & mitigate risks , Responding to site technical demands , Supervise shop-drawing reviewing and submission & Coordinate between the various project trades , Resolve any technical design issues & any technical conflicts for sub-contractors regard shop drawing Show less

  • Licenses & Certifications

    • Project Management Professional (PMP)

      Project Management Institute
      Jan 2017
    • Associate Member

      Syndicate of Sub-Engineers in Cairo
      Sept 2005