    Feb 2000 - Jan 2002

    Assistant project inspector

    Philippines Department of Public Works and Highways
    Feb 2002 - Jan 2013

    Civil Engineer

    R's Builders
    Mar 2013 - Jun 2016

    Interface Engineer

    Dorsch International Consultants GmbH
    Jul 2016 - Jan 2017

    MEP Planning Engineer

    Balfour Kilpatrick Gulf LLC (Balfour Beatty Group)
    Jan 2017 - Jun 2018

    Project Engineer

    Arabtec Construction LLC
    Nov 2019 - May 2020

    Construction Coordinator

    VHR Global Technical/ALEMCO
    Sept 2020 - Dec 2021

    Interface Engineer

    ALEMCO
    Current Company
    Jun 2023 - now

    Interface Engineer

    Bechtel Corporation
  • About me

    EPM - Bechtel

  • Education

    • West negros university

      2005 - 2008
      Bachelor of science in nursing
    • Silliman university

      1993 - 1998
      Bachelor of science (b.s.) civil engineering
  • Experience

    • Philippines department of public works and highways

      Feb 2000 - Jan 2002
      Assistant project inspector

      Check all works implemented in accordance to the approved plans and specificationsPreparation of Daily Inspection reportInspection and receiving materials delivery at siteReport to QC Manager of any non-conformance of work for immediate corrective and prevented actionsArea preparation and requests for inspection in accordance to Project Quality Plan.

    • R's builders

      Feb 2002 - Jan 2013
      Civil engineer

      Direct construction, operations, and maintenance activities at project site.Inspect project sites to monitor progress and ensure conformance to design specifications and safety or sanitation standards.Analyze survey reports, maps, drawings, blueprints, aerial photography, and other topographical or geologic data to plan projects. Estimate quantities and cost of materials, equipment, or labor to determine project feasibility.Prepare or present public reports, such as bid proposals, deeds Provide technical advice regarding design, construction, or program modifications and structural repairs to industrial and managerial personnel. Show less

    • Dorsch international consultants gmbh

      Mar 2013 - Jun 2016
      Interface engineer

      Consultant team on the new Lusail Development project in Doha, Qatar–worth 45 Billion US Dollars, 38 sq. km comprising hospitals, schools, social housing, stadiums, district cooling plants, potable water reservoir, substations, and metro rail system, as well as retail outlets & offices. Also includes a major new road network with underpass tunnels and underground parking facilities.. Act as liaison with client, consultants, contractors/sub-contractors, and coordinating with other requirements of the project.. Maintaining the coordination and flow of communication between all concerned parties, until completion of project, including identifying any problems which may cause delay to the project.. Identifying interface-related clashes between contractors to prevent delay occurring.. Preparing, arranging and participating in site coordination meetings, issuing progress reports including any photographic documentation. . Regular site visits to review progress and ensure standards are being adhered to. . Overall responsibility for ensuring close liaison, coordination and interface arrangements between consultants and contractors. . Approval and sign off of all variation orders, RFIs and change orders.. Familiarity with all aspects of interface practices, methodology and procedures;. Ability to apply these to complex projects; ability to lead, motivate and provide guidance to a multi- disciplinary project team, setting performance standards. Coordination of all infrastructure utilities (Potable water, Foul sewer, Storm water, Irrigation, Telecom, SSD, ELV, District cooling, gas, Roads, Pneumatic waste). Attending workshops to resolve issues with stakeholders.. Checking utilities for mismatches and missing connection. Show less

    • Balfour kilpatrick gulf llc (balfour beatty group)

      Jul 2016 - Jan 2017
      Mep planning engineer
    • Arabtec construction llc

      Jan 2017 - Jun 2018
      Project engineer

      COORDINATION for the Abu Dhabi Midfield Terminal Building Proj. Abu Dhabi Airport

    • Vhr global technical/alemco

      Nov 2019 - May 2020
      Construction coordinator

      -Responsible for reviewing inspection reports for compliance-Liaise with subcontractors and provide assistance in closing all Code 3 MEP WIRs-Preparing and arranging workshops / coordination meetings with subcontractors for the resolution of closing WIR-Ensure that all inspection reports are accurate and that all attached documents are in its current status.-Prepare snagging code 2 report documentation.-Working together with Facilities Management in closing CIR documents-Prepare Daily report for progress monitoring.-MEP WIR Closeout Show less

    • Alemco

      Sept 2020 - Dec 2021
      Interface engineer

      • Responsible for the overall Tie in Point pipe connection of the Sea World Project• Reports directly to the Senior Construction Manager in a timely manner whenever required• Coordinate with stakeholders on all ALSS pipes connection services onsite discrepancies• Ensure coordination of interfaces among the MEP contractors associated TP-9 SeaWorld Project• Communicate early warnings related to interface issues and performs other responsibilities associated with this position as may be appropriate• Prepares and Update Interface Register• Identified more than 3000 underground ALSS interface points plus ongoing identification of above ground tie in point connections.• Anticipate and identify all potential interface subjects that will require close supervision and resolution.• Monitor and follow up Schedule of Materials Delivery as per procurement schedules and sequencing.• Manage Crane Logistics Schedule Operation and ensure On-time lifts of materials and other equipment to ensure effective transportation of materials and safety for all personnel on site.• Created and update detailed log of material transportation operations, including information about type of material, movement locations and additional data requested by Senior Construction Manager. Show less

    • Bechtel corporation

      Jun 2023 - now
      Interface engineer

      - Review contractors’ interface documents including but not limited to EIR, ICF, IMP, IDM.- Attend design interface meetings and weekly progress meetings.- Ensure the contractor’s adherence to client's interface and stakeholder managementrequirements. - Following up on the resolution process of the projects’ interfaces.- Coordinating between the respective D&B contractors, to identify the interface design leaders(IDLs) and the respective interface design partners (IDPs1) and assuring all the interface agreements are documented in ICF.- Monitor contractor’s performance against their coordinated interface process.- Perform quality and content reviews of the ICFs.- Maintain and update Projects Master Interface matrices and registers.- Responsible in Permits Application preparation and submission. Show less

  • Licenses & Certifications

    • Authorized managing officer

      Contractors association board
    • Certificate of professional accreditation

      Saudi council of engineers
      Jun 2023
    • Certified lean six sigma black belt

      Imc institute
      Nov 2023
    • Iso 9001:2015 lead auditor training course based on quality management system

      Imc institute
      Nov 2023
    • Certified board licensed civil engineer

      Professional regulation commission
    • Certified lean six sigma yellow belt

      Imc institute
    • Certified lean six sigma green belt

      Imc institute