    General Manager Power Plant & HOD E & I of Steel & Power

  • Education

    • Govt. Polytechnic UttarKashi UK

      1980 - 1983
      Diploma in electrical Engg. Electrical Engineering

      UttarKashi is in Uttarakhand India

    • Govt. Polytechnic Uttarkashi

      1980 - 1983
      Diploma Electrical

      I was topper of my college

  • Experience

    • M/s Vikram Cement Khor

      Apr 1990 - Dec 1991
      Assistant engineer Electrical

      Errection & commissioning of 1.0 MTA cement plant Unit -IIIinvolvement from mining to clinkerisation.

    • M/s JP Rewa cement Rewa MP

      Jan 1992 - Apr 2003
      DY. Chief Engineer Electrical

      I was involved during this tenure like Main plant , Cement mill section , 70 MW DG based power plant & electrical repairing shop. I have done many major modification to increase availability of plant operation & stream lined the electrical system. Rewarded for the same many times. I was a part of team to commissioned JP ghoorpur grinding unit with record time of 6 Months. Commissioned 1950's germen make old heavy engg. workshop CNC machines. Electrical & Instruments Rennovation done after major circuitory modifications. Show less

    • M/s Sanghi Cement Bhuj

      Jul 2003 - Sept 2004
      Dy. Manager Electrical

      I was commissioned 9x2.5 MW HHI DG sets apart from 4x11.25 MW DG based power plant maintenance.

    • M/s Rama News Print & Papers Ltd

      Oct 2004 - Jul 2007
      Manager Electrical power plant

      Responsible for operation and Maintenance of 1x19MW,1x13MW coal based Power plant and additional responsibility of 25 MW STG BHEL make for project planning, execution,negotiation,equipment's selection,comparative statements,commissioning and testing.Document preparation for ISO implementation. Energy saving and spares planning etc.

    • M/s Wartsila India

      Jul 2007 - Jan 2016
      Head Electrical

      1. Sr. Manager Electrical (Head Electrical) and looking after 3X30 MW, Co-Generation power plant including CHP, AHP and Wagon tippler.2.•Sr. Manager Electrical (Head Electrical) and looking after 2X80 MW, 1x10MW, 1x 6MW CPP including 220KV/33KV/11KV/6.6KV, 14 ways with transfer bus switchyard having full import and export contract with GRID. 3.• Manager electrical (Head Electrical) responsible for 3X30 MW Co-Generation thermal power plant including 132KV/33KV switchyard along with 5KM 33KV line Show less

    • M/s Sky Alloys & Power Ltd.

      Jul 2016 - Jul 2017
      General Manager Power Plant

      1. Responsible for operation & Maintenance of 1X15 MW coal based power plant including 1x 70 TPH AFBC & 2x12 TPH WHRB boilers. • 2 • CBD steam loss achieved almost zero tone. (25 T steam vented per day).3. Operation and maintenance System put in place.4. Achieved zero break downs in switch yard by coating anti provar (Z-906 stanvac). This was due to heavy dust of ferrous based from SID plant.5. Prepared list of annual shut down and completed following jobs which were leading to power plant trip.6. Motors TB were flashing due to internal space of TB was less. Modified.7. Due to unavailability of schematic drawings, fault finding was difficult. Scheme checked and key circuits made visible to everybody.8. Trends and loops implemented of equipment's & incorporated in DCS for better operation and trip analysis.9. Team culture developed for housekeeping; break down analysis, enhancement of personnel and equipment safety. Show less

    • M/s Raipur Power & Steel Ltd Rasmada Durg CG

      Jul 2017 - now
      General Manager Power Plant

      1. Responsible for operation and maintenance of 1x15 MW coal based power plant including 3x10TPH WHRB boilers. 2. 1x27 MW BTG up coming project.3. Achieved highest feeding @ dolachar 70% : coal 30% on continuous basis against boiler design for @ coal 70% : 30% dolachar . ( Design GCV of coal 3500 & dolachar GCV 1800) but we used coal GCV @ 3000 & dolachar @ 1400 Kcal/Kg successfully for 65 days continuous operation.4. Consumed 2000 tonnes char with 65% mag & GCV 1000-1200 Kg cal/kg. This char mag materials was separated from dolachar. We screened the lying char material with help of screen in size of ( -ve) 3.0 mm. The ratio of feeding @ coal 60: Dolachar 20: Char 20 (feeded char separately and mag part collected with help of 1000 Gauss magnet pullies) in two stages final mag% in bunker feeded 25. Bed drain Mag% controlled in the range of 8 - 10%. This materials was lying overs the years. No body wants to feed in boiler. Remaining 8000 tonnes materials feeding is in under progress. Show less