Osama Helal

Osama Helal

Operation Engineer

Followers of Osama Helal2000 followers
location of Osama HelalUnited Arab Emirates

Connect with Osama Helal to Send Message

Connect

Connect with Osama Helal to Send Message

Connect
  • Timeline

  • About me

    Senior Operation engineer - Layyah Power Station

  • Education

    • Mansoura University - Egypt

      2004 - 2009
      Faculty of Engineering
  • Experience

    • RidgeWood Egypt

      Feb 2010 - Nov 2010
      Operation Engineer

      •Responsible for operating and following Maintenance activities at one of Ridgewood Egypt desalination (RO) units with neat capacity 400 m³ per day.

    • Taweelah Asia Power Company (TAPCO)

      Apr 2011 - Apr 2014
      Field Engineer
    • Sharjah Electricity, Water and Gas Authority (SEWA)

      May 2014 - now

      - Following combined cycle commissioning activities on shift basis.- Lead the communication between the new CCGT and the existing plant- Ensure the smooth operation handover between Consortium team and Owner operation team.- Leading the communication between CCGT and LDC, to ensure the complete understanding of the commissioning POD between all involved stakeholders.- Leading the process of creating and developing the new plant check lists, isolation packets and reading sheets.- Handling emergency during commissioning phase, ensuring the safety of the plant and the national grid as well. Show less -Layyah CCGT 1026MW Mitsubishi Hitachi M701F.-Following hot commissioning activates for the two M701F GTs including but not limited to, Spin blow test, first firing, dummy synchro, …. -Leading the communication between LDC and the CCGT during plant commissioning.-Following operations of the gas turbines during the reliability test run -Leading the technical coordination between project commissioning teams.-Issuing all PTWs related to the project.-Facilitating all technical and site challenges during commissioning in accordance with consortium commissioning team.-Leading the weekly commissioning meeting between Owner consultant and Consortium representatives. Show less -Layyah CCGT 1026MW Mitsubishi Hitachi M701F EPC Project.- Responsible for all process engineering deliverables, reviewing all related documents including but not limited to P&IDs, PFDs, system calculation notes, system functional descriptions, operation philosophies… providing documents approval or rejection for modification to comply with contract and process requirements.- Following project technical packages progress through the DMS “Document management system”, lead the technical communication between Owner and Consortium- attend project meetings, following up project technical progress reports.- Participate in HAZOP study workshops for GT and BOP “balance of plant”.- Responsible for managing project terminal points with existing plant, leading PTW process.- Provide engineering technical support, troubleshoot problems and develop suitable solutions for safe and reliable plant operation.- Following plant mechanical construction activities raising NCR if required.- Responsible for managing plant layout, lead site visits with Consortium to avoid any deviation from the approved plant layout. - Attend ECC “erection completion certificate” meeting and site visits as well.- Attended the following FATs:1- Run out test for GT11 shaft at Mitsubishi Takasago- Japan 2- HRSG (6 drums) Hydrostatic Test at ULP South Korea. 3- HP valve hydro test at Hitachi- Japan.4- Unit auxiliary transformer at Siemens- Italy.5- Firefighting pump “online due to pandemic”.6- Deaerator hydro test online due to pandemic Show less • Certified as “Senior authorized Person” - Responsible for following full plant operation “ power generation and water desalination” as per approved procedures, reported to “shift manager”- Authorized to issue, cancel and suspend full plant mechanical and electrical permits to work (PTWs)- Authorized to carry out electrical switching and isolations on low voltage and high voltage bus-bars and equipment’s including (6.6 kv, 11 kv, 33 kv & 132 kV ) • Carryout routine Testing and Scheduled Changeover of Duty/Standby Equipments.• Assist Maintenance in their daily PM and CM activities to ensure the completion of these activities and reschedule the pending jobs • Supervise all isolations before any maintenance or repair work is carried out on equipment’s as per SEWA safety rules before issuing the (PTW).• Supervise the equipments normalization after PTWs cancellation • Handling plant emergencies• Responsible for plant daily & monthly reports Show less

      • Senior Operation engineer

        May 2022 - now
      • Lead Commissioning Engineer

        Dec 2021 - May 2022
      • Process Engineer

        May 2019 - Dec 2021
      • Shift Charge Engineer

        Jun 2017 - May 2019
      • Assistant Shift Charge Engineer

        May 2014 - Jun 2017
  • Licenses & Certifications