CH M KRISHNA

CH M KRISHNA

GRADUATE APPRENTICE

Followers of CH M KRISHNA48 followers
location of CH M KRISHNAIndia

Connect with CH M KRISHNA to Send Message

Connect

Connect with CH M KRISHNA to Send Message

Connect
  • Timeline

  • About me

    SR.ENGG at UB ENGG. LTD

  • Education

    • INTERMEDIATE

      2002 - 2004
      SRI CHAITANYA JR. COLLEGE
    • LEAD WELL PUBLIC SCHOOL

      1992 - 2002
      SSC
    • Jobs in Tamil Nadu India

      2004 - 2008
      Bachelor of Engineering (B.E.) Mechanical Engineering FIRST CLASS
    • 청강아카데미학원

      2004 - 2008
      B.E Mechanical engineering

      SSC SKPVVH English medium high school

  • Experience

    • BHEL HYD

      Feb 2009 - Mar 2010
      GRADUATE APPRENTICE

      Worked as a Graduate Apprentice Trainee in BHEL HyderabadPosition: Trainee EngineerAREA: STG main AssemblyPROJECTS: STEAM TURBINES Main Assembly capacity involving from 18MW to 125MWROLE: 1. As a supervisor in the area of 110-125MW steam turbines.2. Following up the machine shop for the manufacture and repair of parts e.g. keys.3. Dispatching of steam turbine spare parts and sub-assemblies.4. Looking after the alignment and reporting it to Q.C and followed repairs to be carried out.5. Preparation of fair records and documentations details required for the project.6. Also having the knowledge in the assembly of Dash 2 and 3 type steam turbines. Show less

    • Vasavi Power Services Pvt Ltd

      Oct 2010 - Oct 2012
      MECH.ENGG

      Working as a Mechanical Engineer in VASAVI POWER SERVICE PVT, LTDPosition: EngineerClient: BHARAT HEAVY ELECTRICALS LIMITEDCUSTOMER: UPRVNLPROJECT: 2X250 MW POWER PROJECT (STEAM TURBINE)ROLE:1. Equipment alignment checks for Turbine, Generator2. Planning of Erection schedules3. Preparation of site Protocols for Erected Equipment’s4. Clearance checks for inside things such as BRGs, Labyrinth rings etc..5. Springs loaded deck catenary alignments.6. Erection of STG Two units of 250MW power plant done successfully.7. Works like placement of H.P.T, I.P.T and L.P.T box up works. 8. Rough alignments, CRO checks and also Final Alignments.9. Turbine Generator alignment check, Catenary and correction works Show less

    • UB ENGG. LTD

      May 2012 - now
      SR.ENGG

      1. Equipment alignment checks for 660MW Turbine, Generator and Auxiliaries2. Planning of Erection schedules3. Preparation of site Protocols and Billing for Erected Equipment’s4. Clearance Visual checks for internals such as BRGs, Labyrinth rings etc..5 . Pumps alignment and verticality checks 6. Structure erection for the TG buildings.7. EOT Crane Girder Erection, Rail Erection and Alignment, Rail joints Welding.

    • UB Group

      Jun 2012 - now
      SR.ENGG

      SR.Engg Turbine Generator and Rotary Parts for the Erection......................

  • Licenses & Certifications

    • ASNT CETIFIED LEVEL II PROFFESSIONAL(UT,MPT,RT,VT,PT)

      ASNT
      Nov 2013