Mohd Zaki Jupri

Mohd Zaki Jupri

Application Engineer

Followers of Mohd Zaki Jupri877 followers
location of Mohd Zaki JupriSelangor, Malaysia

Connect with Mohd Zaki Jupri to Send Message

Connect

Connect with Mohd Zaki Jupri to Send Message

Connect
  • Timeline

  • About me

    Instrument Control Engineer at Petronas GTS PD&T

  • Education

    • MRSM Terendak

      1998 - 2002
      Bachelor Degree in Chemical Engineering

      Activities and Societies: Member (Sport & Recreation) of Badan Wakil Pelajar

    • Universiti Putra Malaysia

      2004 - 2008
      Bachelor of Engineering (B.Eng.) Chemical Engineering Second Class Upper

      Activities and Societies: Chemical Engineering Student Society, Handball, Soccer Grabbed valuable knowledges mainly on theoretical knowledge in instrumentation, thermodynamics, material and heat balance.

  • Experience

    • Cryogas Exergy Sdn Bhd

      Oct 2009 - May 2011
      Application Engineer

      Authorized Distributor for Richards Industries

    • Bumiwangsa Sdn Bhd

      May 2011 - Jan 2014
      Instrument / Project Engineer

      1.Preparation of various deliverables to client such as GA drawing, schematic drawing, Bill of Material, termination/wiring diagram, shop fabrication drawing, Loop diagram, I/O List, ISA datasheets, ITP, VDML, Project Schedule, FAT/SAT Procedure, Operation & Maintenance Manual, e-SPIR/SAP, Material Requisition Order, Progress Report, sizing calculation, instrument air/gas consumption calculation.2.Follow-up with sub-vendors/suppliers for enquiries, panel enclosure fabrication, technical support.3.Liaise with consultant/client/end user during FAT and commissioning engineer/technician through all phases of the project.4.Perform testing and inspection witnessed by client / inspector in accordance with Inspection and Test Plan.5.Provide advice solution and guidance on the technical issue faced by the customer / client whether they are related to the design philosophy, motor & pump faulty and in term of operational wise. 6.Monitor project execution at workshop, technical support, and delivery/receiving of goods, testing & calibration.7.Estimate fitting, hoses, tubing length, cable length, cable gland, junction boxes, terminal block, and accessories.8.Involve in HAZOP, HAZID & SIL study/implementation for Wellhead Control Panel design.9.Conformance to ISO Quality system, codes, standards, procedures and norms.10.Assist Operation Manager/General Manager conducting Wellhead Control Panel Training to various customers at BWPPE fabrication shop & outside location.11.Involved in modification works of high pressure hydraulic pump orientation. Show less

    • Muhibbah Engineering (M) BHD.

      Feb 2014 - now
      Electrical & Instrumentation Engineer

      RGT1 MINIMUM SEND-OUT CAPABILITY IMPROVEMENT PROJECT:CLIENT : PETRONAS GAS BERHAD (PGB)Job Duties: 1. Preparation and conduct Review Meeting of Job Method Statement (JMS), Job Hazard Analysis (JHA) and Process Hazard Analysis (PHA) with client before execute the works.2. Coordinate with Inter-Discipline and Sub-Contractor for any issue relating to the works.3. Monitor and follow up closely with other departments for any items that may lead to project delay; i.e. pending materials, technical issue, commercial issue and others.4. Detail Electrical and Instrumentation Activities indicate below:a) New RGT Export Compressor Packages. • Dismantle existing cable ladder cover and installation of new cable ladder/tray at from UP area to BOG Skid. • Modification work for installation of cable ladder supports and installation of secondary cable way. • Installation of new UCP and LCP Panel at CCR Room and BOG area. • E&I Pre-commissioning activities involved cable test (IR Test, HIPOT, Megger), Panel/DB/JB InstallationCheck, Instrument Loop Test, Instrument Leak Test and Motor Solo Run.b) N2 Capacity Enhancement Package • Cable ladder/tray installation from UP area to N2 Skid area. • Perform Busbar Tie-in for LV MCC, perform additional graphics, installed additional hardware and software modules and conducted loop check of existing JB to marshaling cabinet (PMCS/SIS/FGS) during Shutdown period. • Dismantling existing 5kVaA UPS and Battery Bank and installation of new 10kVA UPS and Battery Bank inside MCC Room. • E&I Pre-commissioning activities involved cable test (IR Test, HIPOT, Megger), Panel/DB/JB Installation Check, Instrument Loop Test, Instrument Leak Test and Motor Solo Run. Show less

    • Petronas GTS PD&T

      Nov 2018 - now
      Instrument Control Engineer

      1. Perform SIL study (identification and verification) for safety functions in terms of a SIL in conformity with IEC61508/61511 and PTS 14.12.10.2. Carry out alarm rationalization study to ensure alarm are engineered properly, consistency and to eliminate duplicate alarms

  • Licenses & Certifications

    • Instrument and Control Level 2 & Level 3 Course

      Industrial Training Institute Pasir Gudang
      Jun 2013
    • ISO 14001 & 18001 Environmental & Safety Internal Auditor Programmed

      Time Circle
      Sept 2012
    • ISO 9001:2008 Integral Quality Audit Training Programmed

      HRM Consultant Sdn Bhd
      Feb 2012
    • Industrial Instrumentation and Process Control Course

      Comfori
      Jun 2011
    • IOSH Managing Safely Training

      KBA Training Centre Pte Ltd
      Sept 2013
    • Hook Up, Construction and Commisioning for Offshore Oil and Gas Projects

      Dream Catchers
    • Authorized Entrant & Standby Person (AESP) Training

      NIOSH Certification Sdn Bhd (NCSB)
      Sept 2015