George Fawzy

George fawzy

bookmark on deepenrich
location of George FawzyEgypt
Phone number of George Fawzy+91 xxxx xxxxx
Followers of George Fawzy10000 followers
  • Timeline

    Dec 2004 - Aug 2006

    CNC engineer "Wire & Milling M/C".

    SIROMISR
    Jun 2006 - Nov 2007

    Mechanical Design Engineer

    ESPI
    Dec 2007 - Jul 2008

    Shift Engineer

    Sun international port Ghalib
    Aug 2008 - Aug 2010

    Maintenance Engineer (the same place - management company changed)

    InterContinental Hotels Group
    Aug 2010 - Jul 2012

    Assistant Chief Engineer - Acting Chief Engineer

    Carols Hotels and Resorts
    Jul 2012 - Jul 2013

    Assistant Chief Engineer - Acting Chief Engineer

    Amer Group
    Jun 2013 - Jun 2013

    Engineering Manager

    Pharonic Village
    Jun 2013 - Dec 2017

    Estate Manager

    NCBIS - New Cairo British International School
    Jan 2018 - Dec 2019

    Assistant Chief Engineer

    Marriott Hotels
    Dec 2019 - Jun 2020

    DOE

    TGMR (Tolip ElGalala Majestic Resort)
    Jul 2020 - Jul 2021

    Chief Engineer

    Tolip North Coast
    Jul 2021 - Jul 2022

    Chief Engineer

    Tolip Golden Plaza
    Jun 2022 - Mar 2023

    Chief Engineer

    TP Hotel
    Current Company
    Nov 2022 - now

    Director of Engineering

    Misr International Hospital - مستشفى مصر الدولي
  • About me

    Chief Engineer at TP - Hurghada

  • Education

    • Masri amricy

      -
    • Faculty of engineering helwan university

      1998 - 2004
      Bachelor’s degree mechanical engineering accepted

      Activities and Societies: Project: Design & Manufacturing of plastic mold for Thread and nut. * General training in EL NASR Automotive "1.5 month" 2003 * Academic study in first 6 chapters in "Injection Mould Design" R.G.W.PYE * Injection simulation "for check the best location for gate& air trap& weld line * Design & creating CD contain all the project group work

    • Ismaiel el kabany

      1995 - 1997
      91.75% adult high school/secondary diploma program
  • Experience

    • Siromisr

      Dec 2004 - Aug 2006
      Cnc engineer "wire & milling m/c".

      * Prepare CAD file in 3D* Prepare CAM file in Txt format* transfer the file into the machine* Setup the W.P as per the file setting * Make the machine maintenance* mold making & repairing

    • Espi

      Jun 2006 - Nov 2007
      Mechanical design engineer

      "Mould making, jigs, medical lines, spare parts" • Design a plastic mold "Simple molds"• Design sheet metal dies "Cutting Dies"• Spare parts Design• Medical lines Requirement Design• Reverse Engineering • Using CAD-CAM-CAE systems " Unigraphics NX4.0"• Create company Introduction presentation• Case Study for projects "design view"

    • Sun international port ghalib

      Dec 2007 - Jul 2008
      Shift engineer

      • Shift Followup• Created all the follow-up check lists • Follow up all the utilities consumption .• Work with all electromechanical & architecture drawing.• Work with the Ken Fix Program.• Working with hygiene consultant “Crystal Co.”

    • Intercontinental hotels group

      Aug 2008 - Aug 2010
      Maintenance engineer (the same place - management company changed)

      "The Palace Hotel" As a Maintenance Engineer During me work I get a lot of experience in a lot of fields & shared in a lot of projects ….• Prepare a preventive Maintenance Plan for a very complicated site, according To IHG standard.• Created all the maintenance check lists “daily checks – weekly –monthly-3 monthly - …. etc” check lists for all site equipments , follow up the PM Implementation.• Follow up all the utilities consumption – according to IHG Standard –on daily basis-.• Prepare & Work with water quality book according to IHG requirements.• Create escape plane –room door escape plan- for the hotel.• Work with all electromechanical & architecture drawing.• Work with the Ken Fix Program.• Work with saving cost programs “water – electricity ….”.• Work with the electric earth protection in the rooms & equipments. • Working with hygiene consultant “Crystal Co.”• Working with water Quality consultant “House Man Co.”• Working according to FLS requirements. Show less

    • Carols hotels and resorts

      Aug 2010 - Jul 2012
      Assistant chief engineer - acting chief engineer

      As a assistant chief Engineer "acting chief Engineer " During my work I passed with the department through the following projects & targets ….• Prepare total renew / maintenance plan for all the hotel to get the engineering systems matching with the Hotels standard and cover a lot of construction problems o Fire alarm / Fighting systemo Air condition system “Chiller – AHUs – Split Units - Hoods ”o Kitchen Equipments o Electric Distribution system “ Medium – Transformers – Earthing - …”o Sewage system “sewage plant – sewage man halls ”o Domestic Water system o Hot water system “Hot water Boiler – Electric heaters – calorifiers ”o Swimming Pools “pumps – filters – heat exchangers ”• Engineering Filling System o Total Engineering Filling System Creation  Water quality log books / Leganila disinfection protocol filing  Elevators –kitchen equipments – data and service visits As built drawings – catalogs  Travel life environmental file Fax in /out - …..etc o Prepare & implement total maintenance checklists Daily Checklist / Log books “ Pluming –Electric - Air Condition – Equipment ” Preventive Maintenance Checklists • Work with saving cost programs “Water – Electricity – etc…”• Working with external auditors o Hygiene consultant “Crystal Co.”o Environment Consultant “Travel Life ”• Go in deep in all of the Hotel Projects during the low season periods• Managing the Engineering Department o Putting Safety ”Human/Assets” in the first priority o Keeping Guest Satisfaction on Department Goal o Keep Assets Efficiency .o Manage External Companies Issues o Manage Engineering Team  Putting the aim to have loyal Staff  Deal with the Last Period in Egypt with Stable Engineering Department Show less

    • Amer group

      Jul 2012 - Jul 2013
      Assistant chief engineer - acting chief engineer

      As a assistant chief Engineer – MechanicalDuring my work I passed with the department through the following projects & targets ….• Recover a lot of the construction problems .o Emergency lighting installationo Master key plan design & installation .o Total snagging for the entire site. o Install new sensors for electric saving in building corridors .• Engineering Filling System  Water quality log books  As built drawings – catalogs  Daily Checklist / Log books “ Pluming –Electric - Air Condition – Equipment ” Preventive Maintenance Checklists • Work with saving cost programs in Electricity for public area• Go in deep in all of the Hotel Projects during the low season periods o Total electric maintenance for street lightingo Handrails renewing in all the site.• Engineering Department operationo Managing the operation tasks through the supervisors & technician o Modifications calculations o Putting Safety ”Human/Assets” in the first priority o Keeping Guest Satisfaction on Department Goal o Daily report preparation .o Keep Assets Efficiency .o Manage External Companies Issues o Manage Engineering Team  Putting the aim to have loyal Staff  Deal with the Last Period in Egypt with Stable Engineering Department Show less

    • Pharonic village

      Jun 2013 - Jun 2013
      Engineering manager

      Responsible for all the engineering Activities , due to the time Spam i have only created a report all the Pharaonic village engineering notes , moved to next step ,

    • Ncbis - new cairo british international school

      Jun 2013 - Dec 2017
      Estate manager

       Long Term plan for place renovation considering the utilities-electro mechanic-Construction school condition. Plane the internal projects consider the available resources (Time ,Manpower ,Cost), Arrange and follow-up the big projects with consultants & contractors , Some Of Achievement (Pool Renovation ,Roofs Isolation, parking Renovation, change the painting into antibacterial - boaster pumps system Upgrading –install pressure relief valve for water system and pressure tank repair – hardscape renovation adding floor drainage – install rain drainage line -Power Factor installation – Connect LPG to boiler – UPSs installation for emergency systems – Main Generator Renovation Maintenance – Small Generator Renovation and server room Power Supply Separation – Upgrade landscape/field design and irrigation network – Separate school service & back area - Design and implementation of porta cabin for engineering W/S area- install pool injection system - over 100 other projects) Planned /studded Projects (Escape Routes review , Fire Fighting network separation– Earthling review , ) implementation started through consultant. Prepare internal escape rote planes for each space in the place My duties during normal operation. Initialize and operate Helpdesk system for the department.• Include all electronic forms .• Include all paper system “closed loop system”. Setup logging system for all technician & supervisors. Preventive Maintenance and Repair for Electro mechanic Systems(Generators,boiler, pumps, pool system, HVAC package & Split units, UPS , Transformer , Medium tension Switches , Booster pumps renew and system upgrade into inverter and pressure sensor , pool dosing system installation , electric panels ). Preventive Maintenance and Repair for (building spaces , building painting , tilling , etc , roofs isolation ). Prepare and implement Organization chart for the department. School cleaning and porting. Ken-fix Program for school spaces Show less

    • Marriott hotels

      Jan 2018 - Dec 2019
      Assistant chief engineer

       Responsible for the Assistant C Engineer Responsibility include not only  Engineering operation ,• managing engineering team and give required supportive data help them doing them work / tasks / projects • all Engineering systems , Transcendent (adding assets / documents / Rounds / Activities / GITB2018-2019) follow up all work types • GXP guest experience platform (create reports / take required actions / auto dispatch / dispatch roles )• Utility follow up and data analysis ( MESH system / reports) and saving actions .• work with Marriott MGS & standard • Required engineering calculations for HVAC using HAP software.• PM maintenance follow up• "OOO/S" rooms repair procedures • engineering system standard (water / PMs / )• manage team activities, engineering enhancement projects• internal projects (over 70 Project -all Engineering systems ) , • technical specs for the small projects .• project progress planning . Management • Create local staff evaluation system (MS excel and upgraded into MS access) to increase productivity.• Utility saving plan –getting good results-.• Guest problems analysis and action plan , and follow-up, enhancement .• Team training program,-implemented internally -• Mechanical systems maintenance enhancement action plan .• Technical comparisons for projects .• Auto Cad files preparation and modification.• Technical Specs and Drawing for modifications and tasks of work projects Show less

    • Tgmr (tolip elgalala majestic resort)

      Dec 2019 - Jun 2020
      Doe
    • Tolip north coast

      Jul 2020 - Jul 2021
      Chief engineer
    • Tolip golden plaza

      Jul 2021 - Jul 2022
      Chief engineer
    • Tp hotel

      Jun 2022 - Mar 2023
      Chief engineer

      Responsible for Engineering operation for the hotel and attached hospital include handling requests, maintenance and repair issues , and all engineering tasks and improvement projects ,Guided with safety and Engineering standards

    • Misr international hospital - مستشفى مصر الدولي

      Nov 2022 - now
      Director of engineering
  • Licenses & Certifications

    • Beclorios degree

      Helwan university
      Sept 1998