  • Timeline

    Sept 2001 - May 2003

    Engineering Manager

    Chengdu Shenyu (Group) Real Estate Corp. Ltd
    Jul 2003 - Sept 2005

    Chengdu Office Manager

    Sarnafil Building Materials System (Shanghai) Limited Corp.
    Oct 2005 - Sept 2008

    Deputy Site Manager

    Lafarge (China) Project Team
    Sept 2008 - Apr 2013

    Facade Superintendent

    Fluor (China) Engineering Corporation
    Corning LCD Glass Manufacturing Facility Project, Beijing, China
    Jul 2013 - Jan 2018

    CSA Superintendent

    Fluor (China) Engineering Corporation
    Tian REC Silicon Materials Project in Yulin City, Shaanxi Province
    Jan 2018 - Sept 2019

    Senior Project Engineer

    Texas Instruments Project Team
    Current Company
    Oct 2019 - now

    CSA

    Looking for new opportunity
  • About me

    CSA Superintendent and Project Engineer

  • Education

    • Logistics engineering college

      -
      College degree civil engineering
    • Sichuan university

      -
      Bachelor’s degree english language
  • Experience

    • Chengdu shenyu (group) real estate corp. ltd

      Sept 2001 - May 2003
      Engineering manager

      Reporting directly to Engineering Director, had been responsible for day to day management of the site. During early phase of the detailed engineering phase of the project, he and his staffs worked very closely in reviewing the drawings and giving feedback or instruction to the architectural design company, taking part in selecting the construction contractors and material suppliers, developing construction execution plan, developing detailed site procedures manuals, quality controlling and safety manuals document. Besides, his role also included managing and coordinating daily activities of contractors, managing and controlling project cost and schedule, controlling change / scope creep, ensuring that all scope changes were quickly and properly documented, managing the supervision engineers to make sure all construction documents were recorded and prepared per government requirement and handed over to Urban Construction Archives; issuing a project close out report and organizing to transfer houses to the Clients. Show less

    • Sarnafil building materials system (shanghai) limited corp.

      Jul 2003 - Sept 2005
      Chengdu office manager

      Had been responsible for developing the regional sales plan and monthly expense plan, decomposing the sales targets of the System set by company to team members, managing and guiding the team to realize tasks, reporting to regional sales director. The routine works included investigating & sourcing new project opportunities, introducing and presenting systems to potential Clients, working closely with the Architects from the major Architectural Design Institutes, providing System solutions and preparing design drawing to all Clients, reviewing and evaluating tenders, contract negotiation, holding related sales meeting, managing the installation teams on site, mentoring and training the team members periodically Show less

    • Lafarge (china) project team

      Oct 2005 - Sept 2008
      Deputy site manager

      From October of 2005 through November of 2007, had been assigned to 2nd line Project of Lafarge Dujiangyan Cement Company as a CSA Superintendent, From December of 2007 through September of 2008, he had been assigned to 2nd line Project of Lafaege Dingxiao Cement Comoany as a Deputy Site Manager.

    • Fluor (china) engineering corporation

      Sept 2008 - Apr 2013

      Had been responsible for supervising and coordinating the activities of Façade installation, which includes more than 80,000 square meter of Aluminum Sandwich Panel, Aluminum Panel and Glass Curtains, and reporting to Construction Manager. The routine job included reviewing and approving the work plans; clarifying the drawing; driving the progress; managing the changes, construction quality; ensuring that Safety Rules were applied on site; developing the punch list; supervising & coordinating the site activities and ensuring the work to be done as per the requirements of Contract and relevant Codes; Holding / attending the contractors’ tool box meeting which involved with contractors’ all workers and supervisors on every workday to make sure the safety behaviors of the personnel and work plans being under control; attending construction coordination meeting. Show less Had been supervised all the Architectural Works related to site plant Activities (CMU wall, Foamed Wall Panels, Louvers, Roof Systems, Doors and Windows, Ceiling, Finish & Decoration Works, etc.) in REACTORS AREA, especially focus on the Building 2400, 2100 (train 1), 2200 (train 2), 2300 (train 3) and reported to construction manager. Had been ensured that works were realized in accordance with drawings, standards, good practice; ensured that used materials were in accordance with the specified grade and properly processed; the routine works included providing necessary clarifications and instructions for a proper execution as per drawing, driving and controlling site works progress per master schedule or updated master schedule, issuing bad execution reports and dealing with necessary corrections, developing punch lists, updating the drawing regularly, performing architectural work assessment and acceptance before turning over to Client, ensuring safety rules being applied and attending coordination meetings regularly. Show less

      • Facade Superintendent

        Feb 2012 - Apr 2013
      • CSA Superintendent

        Jun 2010 - Jan 2012
      • Architectural Supervisor

        Sept 2008 - May 2010
    • Fluor (china) engineering corporation

      Jul 2013 - Jan 2018

      Had been working for developing the HSE Management Plan together with Client Project Management and responsible for implementing and executing the HSE Management Plan for the project construction and erection, reporting to Client Site Manager. the responsibilities included Examining and approving the work plans, Ensuring that contractor is enforcing the requirements of the safety manual, the safety rules and the safety practices, Holding / attending HSE special meeting and weekly audit, Conducting HSE training, Participating in the site weekly meeting and ManagingHSE routine affairs. etc. Show less

      • CSA Superintendent

        May 2016 - Jan 2018
      • CSA Superintendent

        Feb 2015 - Apr 2016
      • HSE Engineer

        Jul 2013 - Jan 2015
    • Texas instruments project team

      Jan 2018 - Sept 2019
      Senior project engineer

      He was acting as Senior Project Engineer and responsible for reviewing the contractor’s ITP, workmanship and relevant QA/QC procedures; reviewing CSA design drawings, answering RFIs and approving work plans & method statements; managing changes; supervising and coordinating the construction activities which includes walkable ceiling, cleanroom wall sandwich panels, ESD flooring tiles, Epoxy flooring, also supervising the installation of HVAC pipeline, HVAV equipment such as DCC, FCU FFU, AHU, MAU etc., and fire water sprinkler pipes & LSS(Life Safety System); supervising and technically directing the contractors to ensure site construction performed in accordance with design drawings, GB code and TI project specifications; ensuring that adequate information, materials, tools and construction equipment are kept to meet the needs of the assigned tasks; site HSE management was also one of his responsibilities. Show less

    • Looking for new opportunity

      Oct 2019 - now
      Csa
  • Licenses & Certifications

    • Certified constructor of china (building)

    • Certified csa engineer

    • Project management professional (pmp)

      Pmi
      Sept 2018
    • National registered supervisory engineer ( building construction, mechanical &electrical installation)

      Ccc
      Dec 2010