M Zameer Shaikh

M zameer shaikh

bookmark on deepenrich
location of M Zameer ShaikhHo Chi Minh City Metropolitan Area
Phone number of M Zameer Shaikh+91 xxxx xxxxx
Followers of M Zameer Shaikh2000 followers
  • Timeline

    Dec 2003 - Jun 2007

    Site Manager

    Various organisations across india
    Jul 2007 - Nov 2007

    Project Manager

    Vasavi Power Services Pvt Ltd
    Dec 2007 - May 2009

    Deputy Manager(Mechanical package incharge)

    Al-Tawleed energy & Power Co LLC, ( a Tata- Saudi jv) KSA
    Nov 2009 - Oct 2011

    Deputy construction manager

    Vasavi Power Services Pvt Ltd
    Nov 2011 - Jun 2013

    Site Manager

    TPSC (INDIA)
    Jul 2013 - Jun 2015

    Site Manager

    D&Y Allied Engineering Pte. Ltd, Singapore
    Jul 2015 - Sept 2018

    Construction Manager (Equator Engineering sdn.bhd. - subsidiary of JEL group)

    Jurong Engineering Limited
    1220MW CCPP, Pengerang Co-gen, Petronas, RAPID, Johor, Malaysia
    Oct 2018 - Nov 2020

    Senior Technical Consultant

    Pöyry Energy Ltd
    Dec 2020 - Mar 2021

    Sabbatical

    Confidential
    Apr 2021 - Jan 2023

    Senior Technical Consultant

    Freelance
    Jun 2023 - Sept 2023

    Site Manager

    Powerrich Engineering
    Current Company
    Oct 2023 - now

    Construction Manager

    Fichtner Consulting Engineers Ltd
  • About me

    Construction Manager @ Fichtner GmbH l Power | Site Management | Project Management | Construction | CCPP | CCGT | Thermal | Hydro

  • Education

    • Anjuman polytechnic nagpur

      -
      Diploma in engineering a
    • Nagpur university

      -
      Bachelor's degree mechanical engineering a
    • National power training institute, nagpur (under ministry of power, govt. of india)

      2002 - 2003
      Thermal power plant engineering thermal power plant engineering

      PDC-TPPE, Thermal Power Plant 2002-2003 Grade: 1st • Power Plant Familiarization Scheme Tracing of 210 MW Thermal Power Station, Khaperkheda Stage -1 and 2 Thermal Power Station Operation • On Job Operation of the 210MW unit • On Job Maintenance of the 210MW unit • Simulator Training for 210 MW Computer Based Training (DCS based system) Electrical Protection System • Control and Instrumentation… Show more PDC-TPPE, Thermal Power Plant 2002-2003 Grade: 1st • Power Plant Familiarization Scheme Tracing of 210 MW Thermal Power Station, Khaperkheda Stage -1 and 2 Thermal Power Station Operation • On Job Operation of the 210MW unit • On Job Maintenance of the 210MW unit • Simulator Training for 210 MW Computer Based Training (DCS based system) Electrical Protection System • Control and Instrumentation Power Plant Commissioning and Chemistry. Show less

  • Experience

    • Various organisations across india

      Dec 2003 - Jun 2007
      Site manager

      During this period, i worked in power sector with various organisation for Capital,annual overhaul,Residual life assessment,reverse engineering,trouble-shooting of steam turbine,gas turbine,generator(Ranging between 1MW to 500MW),HRSG, coal fired boilers, various pumps and rotary equipments.

    • Vasavi power services pvt ltd

      Jul 2007 - Nov 2007
      Project manager

      Valathur Gas turbine power plant extension consist of 92.5mw (Siemens Gas turbine) CCPP in addition to existing 97.5mw (GE Frame 6FA Gas turbine) CCPP Tamilnadu Generation and Distribution Corporation Limited (TANGEDCO)

    • Al-tawleed energy & power co llc, ( a tata- saudi jv) ksa

      Dec 2007 - May 2009
      Deputy manager(mechanical package incharge)

      3x Light Crude oil fired boilers (Ansaldo)3x Back-pressure steam turbines/each of about 397 MW gross output ( Siemens)Besides the Power and Water plant, the IWPP plant will include the following facilities:Electrical Special Facilities, which is a 380 kV switchgear sub-station connecting the plant to the main grid network. The 380 kV switchgear is to be developed, financed, built and then transferred to SEC that will operate the facility during the term of the Project.· Storage facilities for water;· Storage facilities for liquid fuels;· Seawater Intake and Outfall structures;· Disposal facility for ashes collected from the electrical precipitator; and· Fuel special facilities Multi Stage Flash (“MSF”) Desalination Technology· 12 units of MSF Distillers, each of 74,000 m³/day gross output. ( Largest desalination plant at the time of making) Show less

    • Vasavi power services pvt ltd

      Nov 2009 - Oct 2011
      Deputy construction manager

      2X750MW CCPP comprises of 4x250MW GE frame 9FA Gas turbine generator set and 2x250MW KWU steam turbine generator.I was project lead for Mechanical package in power and water block.

    • Tpsc (india)

      Nov 2011 - Jun 2013
      Site manager

      Lead - Mechanical ProjectsResponsible for Erection, commisoning, trial operation of 2X660MW Supercritical steam turbine generator, its auxillieries

    • D&y allied engineering pte. ltd, singapore

      Jul 2013 - Jun 2015
      Site manager

      Worked as Site Manager for Erection, Testing and Commissioning of Tuaspring 411MW, 1x Single shaft Combined cycle power plant, Singapore

    • Jurong engineering limited

      Jul 2015 - Sept 2018

      Overall Mechanical Construction Manager for Erection of Siemens 1220MW Combined cycle power plant comprises of4 x HRSG (Manufacturer - NEM)4 x Siemens SGT5-8000H Gas Turbine4 x Gas Turbine Generator (SGen5-2000H)1 x HP Turbine (SST5-6000H) + Generator (SGen5-100A)1 x IP/LP (SST5-4000) + Generator (SGen5-1200A)and Balance of Plant Equipment Steam, Water and Gas cycle. TUASPRING 411 mw 1x Single Shaft CCPP.

      • Construction Manager (Equator Engineering sdn.bhd. - subsidiary of JEL group)

        Dec 2015 - Sept 2018
      • Site Manager

        Jul 2015 - Nov 2015
    • Pöyry energy ltd

      Oct 2018 - Nov 2020
      Senior technical consultant

      Track 4A 1440MW CCGT @ Southern Power Generation Sdn Bhd, Johor, Malaysia.2x 720MW (Total 1440 MW)GT - GE 9HA.02 Gas turbines, ST - D652, Generator - Gigatop mounted on single shaft.2x 3 pressure HRSG with Once Through technology.working as Owners Engineer, worked closely with Project manager. Attending all the Site technical and progress meetings.Studies the contract documents and applicable standards or specifications prior to execution of any jobs. Supervise & responsible for implementations and monitoring of all mechanical related works at site as per approved drawings. Co-ordinate with EPC and internal project team reviews followed by an approval and review by the owner on the work schedule, documents & drawings. Review status reports, modify schedules and plans as required and inform Project manager about the progress on regular basis. Coordinates and monitor progress of Erection and Installation as per P&ID, Isometric Drawings and advise on field modifications for As-built drawings. approving Method statements and procedures. conducting FAT, field inspections, pressure tests, chemical cleaning, Steam blowing, Turn Over Package inspections and giving approvals.Acceptance of project final documentation of HRSG, Steam turbine, Gas turbine, ST-GT piping, BOP equipment, BOP piping. Show less

    • Confidential

      Dec 2020 - Mar 2021
      Sabbatical
    • Freelance

      Apr 2021 - Jan 2023
      Senior technical consultant
    • Powerrich engineering

      Jun 2023 - Sept 2023
      Site manager

      Capital Overhauling, Annual Overhauling, Retro-fits, Installation services.

    • Fichtner consulting engineers ltd

      Oct 2023 - now
      Construction manager

      Nhon Trach 3&4 CCPP