Abdul Munaem Mousa    PMP®, PMI-RMP®, P3O®

Abdul Munaem Mousa PMP®, PMI-RMP®, P3O®

Site Engineer

Followers of Abdul Munaem Mousa    PMP®, PMI-RMP®, P3O®124 followers
location of Abdul Munaem Mousa    PMP®, PMI-RMP®, P3O®Saudi Arabia

Connect with Abdul Munaem Mousa PMP®, PMI-RMP®, P3O® to Send Message

Connect

Connect with Abdul Munaem Mousa PMP®, PMI-RMP®, P3O® to Send Message

Connect
  • Timeline

  • About me

    Senior Infrastructure Manager

  • Education

    • Damascus University

      1995 - 2000
      Bachelor of Science (B.S.) Civil Engineering good

      Accredited by Germany

    • Damascus University

      2001 - 2002
      Higher Studies Diploma Transportation and Highway Engineering
  • Experience

    • Ministry of Education- SYRIA

      Jan 2001 - Sept 2006
      Site Engineer

      • Managing, developing, and maintaining construction onsite• Conducting on-site investigations and analyzing data• Assessing potential risks• Estimating of the required material for each item of the BOQ• Coaching team• Scheduling all activity in accordance with material delivery and manpower• Reporting the project status to the PM.

    • Al Osais Contracting Co.

      Sept 2006 - Jul 2012
      Project Manager

      King Saud St developmentProject description:The project was construction of 3.3 km long Road with service roads,skew parking & sidewalks which considered as one of the main roadsin Dammam including earth works, storm network, irrigation, normaland decorative lighting poles, hard scape and land scape, roadfurniture, traffic signals & signages,Work done in the project:• Main& service Roads, total length 13.2 km• Interlock pavers for medians and sidewalks, total area 80,000m2• keystone, total length 32 km• Storm water network using GRP pipes, total length 2600 m• Irrigation network using UPVC pipe, total length 3300 m• Lighting network using 8 & 14 m high poles, total number 292poles.• Palm tree planting. Total No 295 tree• Traffic signal installation, total No 2.• Digital sign boards for Ads, total No 6.• Gantry sign board, total No 2• Traffic sign boards, total No 36. Show less

    • Capitalstone Holding

      Jul 2012 - Dec 2016
      Infrastructure Manager/ PMC

      • Review all submittals by the contractor.• Lead the construction supervision activities for the specific project. • Establish a construction management plan to ensure all contracts are administered to a common standard and practice. • Initiate and respond to contract correspondence to and from Client, and contractual correspondence with the Contractor. • Arrange, chair and record meetings. • Establish procedures for inspection approvals, testing, commissioning in accordance with the requirements of the contract. • Review the contractor’s HSE and quality plans and ensure that the safety procedures are followed at site. • Monitor and verify the Contractors progress during construction and regularly assesses output. • Ensure the contractor liaises with service and other authorities in a timely manner so as not to affect the progress of the works by attending meetings, monitoring agreed programs and regular follow-up. • Certify interim and finalize payments after full review and consultation with the responsible team members. • Prepare substantial completion reports including any outstanding requirements. • Issue taking-over and defects liability certificates as required under the contract. Show less

    • Jawdat Contracting Company

      Jan 2017 - May 2018
      Project Manager/ Infrastructure

      The project was a land development includes construction of a roadnetwork with all utilities (sewer, storm, water, electricity, telephone,landscape) on a virgin land of an area 1.7 square km.Work done in the project:• Road network, total length 22 km• Concrete box culvert 2mX2mX1.2 km long• Sewer network using VCP & GRP pipes Diameter from 200 mmto 800 mm, total length 31 km.• Storm water network using GRP pipes Diameter from 300 mm to1800 mm, total length 17.5 km• Potable water network using HDPE, Diameter from 20 mm to600 mm total length 23.5 km• Ductile iron pipe diameter 300-500 mm, total length 5.3 km.• Irrigation network using HDPE pipe, total length 7.7 km• Electrical network of total length 26.5 km• Telephone ducts total length 22 km• Lighting network using 8,10 & 16 m high poles, total number 145poles.• Palm tree planting. Total No 285 tree. Show less

    • Egis

      Sept 2019 - Apr 2022
      Senior Infrastructure Engineer/ PMC

      • In charge of program of (Roads, Bridges, and tunnels) related to Makkah Municipality.• Providing advice to senior management with regards to troubled & late projects.• Reporting the projects status to Makkah municipality PMO. • Enhancing & developing the work procedures.• Follow up with the projects Dashboard, suggesting the required action to be taken.• Tracking projects status and KPIs on PMWEB dashboard.• Proposing corrective and preventive actions to help address troubled projects.• Provide technical advice for any issue related to the program. Show less

    • Diya Al Tomoh Contacting Companyy

      Mar 2022 - now
      Project Manager

      • Construction of A-5 Bridge in Jabal Omar.• The Bridge is 95 m long and consists of 3 spans. (pretension)• Construction of technical gallery including all dry and wet utilities under the bridge.• Construction of all road and earth works related to the bridge.• Maintenance of Maskota Tunnel in Makkah including all crack repair, painting and all required works.• Maintaining quality & safety.

  • Licenses & Certifications

    • PMI Risk Management Professional (PMI-RMP)®

      Project Management Institute
      Apr 2021
      View certificate certificate
    • P3O® Certifications

      AXELOS Global Best Practice
    • Project Management Professional (PMP)

      Project Management Institute
      Aug 2020