Dhruv Choudhary

Dhruv Choudhary

Project Intern

Followers of Dhruv Choudhary1000 followers
location of Dhruv ChoudharyDelhi, India

Connect with Dhruv Choudhary to Send Message

Connect

Connect with Dhruv Choudhary to Send Message

Connect
  • Timeline

  • About me

    Author | Sr. Engineer at L&T | MAHSR | DTU’23

  • Education

    • Shaheed Rajpal DAV Public School - India

      -
      95%
    • Delhi Technological University (Formerly DCE)

      2019 - 2023
      Bachelor of Technology - BTech Civil Engineering 7.77
  • Experience

    • National Highways Authority of India

      Jun 2021 - Jul 2021
      Project Intern

      Project: NH-248 Approach, worth 2000 cr. ● Assisted in designing an Elevated Structure of 1.2 km span and 28 meters width using Spine and Wings method.● Scope of NH248-A is spanning for 30 km given to an Infrastructure company; a six-lane access-controlled corridor with atotal elevated section of 7 km, 750 meter light vehicle underpass and a 24-lane toll plaza.● Identified 20+ gaps in Casting Yard and got those fixed within a week; Analyzed safety manual and ensured safety at site. Show less

    • Crossing Hurdles

      Jan 2022 - Aug 2022
      Community Manager

      Ed-tech startup focused on Career Coaching with 8+ top rated courses on Udemy. Operated as Community Manager for 80 students, encouraged them to make progress in the course, Managed to increaseparticipation in Peer Practice Sessions conducted weekly. Assisted in planning the Flow of course and worked closely with the founder in organizing Activities to encourage participation.

    • Larsen & Toubro

      Jul 2023 - now

      Responsible for SBS Span erection using Underslung Erection Method GSS designed by MCRP. Span varies 35-45m of 14.5m wide Segments. Erection done using CEM, 100% sliding of segments with a fixed feeding location. MAHSR C4-Section 1 Erection Engineer TraineeTrained in executing activities of Full Span Box Girder Launcher Safely and managed efficient Time Cycle of 3 Spans/Day. Coordinate overall operations from Casting to Erection of Girders. Handled 550T capacity Bridge Gantries, 1100T Girder Transporters, 1100T Straddle Carriers in PCY. I/T - Girders Transportation and Erection using Tandem lifting. SBS Span Erection using USLG for High Speed Rail Corridor.

      • Senior Engineer

        Jul 2024 - now
      • Graduate Engineering Trainee

        Jul 2023 - Jul 2024
  • Licenses & Certifications