Alexander Karlsson

Alexander Karlsson

Summer Internship

Followers of Alexander Karlsson515 followers
location of Alexander KarlssonStrömstad, Västra Götaland County, Sweden

Connect with Alexander Karlsson to Send Message

Connect

Connect with Alexander Karlsson to Send Message

Connect
  • Timeline

  • About me

    Chief Executive Officer på Vilokan Recycling Tech

  • Education

    • Lunds Tekniska Högskola

      2008 - 2013
      Master of Science (M.Sc.) Mechanical Engineering with Production Management and Logistics

      Activities and Societies: Maskinsektionen

  • Experience

    • Aker Solutions

      Jan 2011 - Jan 2011
      Summer Internship

      Internship at the Mechanical Discipline for a new platform project

    • Aker Solutions

      Jun 2012 - Aug 2012
      Deputy Package Responsible Engineer

      Deputy Package Responsible Engineer for two mechanical equipment packages for the Ekofisk 2/4Z Topside project

    • Aker Solutions

      Jan 2013 - Jun 2013
      Master's Thesis

      "Procurement documentation in the offshore Oil and Gas Industry - A case study on factors contributing to delays in documentation"

    • Aker Solutions

      Sept 2013 - Mar 2016

      Package Responsible Engineer // Improvement Projects || Statoil Johan CastbergDiscipline Coordinator for an improvement project at JC. Main scope to optimize how Aker and Client present requirements to Suppliers of topside equipment.Co-author of 3 Technical Notes towards Client regarding rotating equipment:- Water Injection Pump Technology and System- Seawater and Fire Water Pump Technology- Vertical vs. Horizontal PumpsAssisting the pump responsible engineer with input for inquiries and evaluations. Show less Package Responsible Engineer (PRE) || Statoil Visund V&MWorking as a Package Responsible Engineer (PRE) for Visund Statoil V&M at the mechanical procurement department.Three main procurement packages: - Chlorination package - New kitchen ramp (Pneumatic Sliding Doors, Utility Station, Flexi barriers) - Electrical Submersible Pump (ESP)The chlorination skid included work tasks such as: - Preparing a Study report for client - Establishing Technical Requisition and Functional Specification - Review and evaluate vendor offer - Estimates of hours for execution phase and weight estimates for contract norms- Follow-on and clarifications towards vendor before PONew kitchen ramp and ESP: - Clarifications regarding detailed design- Follow-on activities towards vendors - Review and evaluate vendor documentation - Preparing job cards/work packages for offshore mechanicsIn all packages the PRE is responsible for coordinating the internal procurement team and communication with external vendors. Show less

      • Mechanical Engineer

        Mar 2014 - Mar 2016
      • Mechanical Engineer

        Sept 2013 - Mar 2014
    • Vilokan Recycling Tech AB

      Mar 2016 - now
      • Chief Executive Officer

        Aug 2022 - now
      • Project Manager

        Mar 2016 - Aug 2022
    • EPCON Evaporation Technology AS

      Jul 2022 - now
      Board Member

      EPCON Evaporation Technology AS is a leading supplier of MVR Evaporation and Heat pump technologies. EPCON is a part of the Vilokan Group.

  • Licenses & Certifications