Mohammed Abdul Malik

Mohammed Abdul Malik

Site Engineer

Followers of Mohammed Abdul Malik292 followers
location of Mohammed Abdul MalikDubai, United Arab Emirates

Connect with Mohammed Abdul Malik to Send Message

Connect

Connect with Mohammed Abdul Malik to Send Message

Connect
  • Timeline

  • About me

    Civil Engineer

  • Education

    • Jawaharlal Nehru Technological University, Hyderabad

      2010 - 2014
      Bachelor's degree Civil Engineering A

      Activities and Societies: Co-ordinator Organiser Class Representative. Civil Engineering

    • Vikas Junior College.

      2008 - 2010
      Board of Secondary Education Mathematics, Physics and Chemistry. A

      Activities and Societies: Nothing Diploma.

    • Central Board of Secondary Education

      1995 - 2007
      Schooling Schooling A

      Activities and Societies: Football, Running 400m, Kabaddi, Disc Throw, Pyramids. Pursued Primary Education

  • Experience

    • Prajay Engineers Syndicate Ltd

      Nov 2011 - Jan 2013
      Site Engineer

      • Monitoring the overall project developments• Inspection of the construction as per the Drawings• Supervise all civil works such as back filling and excavation• Preparing of daily reports as per the progress.• Supervise construction of concrete structure work.

    • Pride India Builders

      Jan 2013 - Nov 2014
      Site Engineer

      Monitoring the site work, check for the work as per the Approved drawing,Approved material and Approved Working Procedure.

    • Saudi Railway Company

      Dec 2014 - Jan 2016
      Quantity Surveyor

      Assessed interim payment certificate of the contractor.Monitoring cash flow.Site inspection of installed materials. Re – computing and re – measuring of construction material in tender drawing and shop drawing using MS EXCEL and AUTOCAD.Making deliberation of re – measurement and re – computation of tender drawing and shop drawing with the contractor

    • Belhasa International CO LLC.

      Dec 2016 - Oct 2020

      ProjectsHampton Hotel (B+G+6+GYM+ROOF) and Residential Building (B+G+6+ROOF+UPPERROOF)Resposibilities:1. Coordinating with Surveyor for the Levels.2. Excavation, Back Filling, Shuttering, Steel Reinforcement, Concrete Casting.3. Layout for the Blockwork as per Drawing and Raise inspection to the consultant for approval.4. Cutting and Chasing work in coordination with MEP for their Services.5. Preparation for plaster and Plastering (Internal and External) after arranging the Required MEP Clearance.6. Plaster Finishes as per required finishes like Tile, Paint and Wall Paper.7. Flooring.8. Joinery Installation works.9. Coordination with all the Sub Contractors for the execution of work as per the approved Drawing.10. Assisting the Sub Contractor to follow Shop Drawings in coordination with the IFC and ID Drawings.11. Coordinate with Installation of Curtain Walls in the Elevation and arrange the required as Cradle and Scaffolding.12. Coordinating with Sub Contractor for the Water Tank Works (GRP).13. Placing order of material required as per site Progress.14. Raising Inspections to the Consultant and getting approval, raising RFI, CVI for the Discripensis and follow SI.15. Checking Detailed work of Elevation, Interior Finishes and External Finishes.16. Ensuring complete Site Safety. Show less Construction of Hampton by Hilton Hotel Dubai Airport. (2B+G+12+GYM+ROOF+UPPER ROOF).Responsibilities:1. Concreting, slab casting and follow-up for concrete with the plant.2. Layout for the Blockwork as per Drawing and Raise inspection to the consultant for approval.3. Cutting and Chasing work in coordination with MEP for their Services.4. Preparation for plaster and Plastering (Internal and External) after arranging the Required MEP Clearance.5. Plaster Finishes as per required finishes like Tile, Paint and Wall Paper.6. Flooring.7. Joinery Installation works.8. Coordination with all the Sub Contractors for the execution of work as per the approved Drawing.9. Assisting the Sub Contractor to follow Shop Drawings in coordination with the IFC and ID Drawings.10. Coordinate with Installation of Curtain Walls in the Elevation and arrange the required as Cradle and Scaffolding.11. Coordinating with Sub Contractor for the Water Tank Works (GRP).12. Placing order of material required as per site Progress.13. Raising Inspections to the Consultant and getting approval, raising RFI, CVI for the Discripensis and follow SI.14. Checking Detailed work of Elevation, Interior Finishes and External Finishes.15. Ensuring complete Site Safety. Show less

      • Site Engineer

        Dec 2018 - Oct 2020
      • Site Engineer

        Aug 2018 - Aug 2020
      • Site Engineer

        Dec 2016 - Aug 2019
    • Al Shirawi Contracting Company

      Nov 2020 - Feb 2023
      Site Civil Engineer

      ProjectsThe Address Harbor Point Dubai Creek (2B+G+M+P1,P2,P3+55 and 65).Responsibilities: ( Screed and Waterproofing Works)1. Preparation of Screed Casting as per the Required thickness for Finishes.2. Coordination with Main Contractor for the Clearance of areas.3. Execution and Casting of Screed ( Bonded and Unbonded ).4. Follow up and arrange manpower as per required in different levels.5. Arrange tools and material required along with Machinery.6. Preparation for waterproofing in wet areas.7. Casting of Screed as per the Required Slope in Wet areas. Show less

    • AFAQ ENGINEERING FOR BUILDING CONTRACTING.

      Mar 2023 - now
      Project Engineer
  • Licenses & Certifications

    • STAAD PRO

      Flash Infratech
    • Construction Management

      ConsoftTechnology
      May 2014
    • AUTOCADD

      Canter Cadd
    • Primavera

      Ecc
  • Volunteer Experience

    • Co-ordinator

      Issued by S.V.Institute of Engineering and Technology
      S.V.Institute of Engineering and TechnologyAssociated with Mohammed Abdul Malik