Mohamed Hamza

Mohamed Hamza

Highway Engineer

Followers of Mohamed Hamza1000 followers
location of Mohamed HamzaCairo, Egypt

Connect with Mohamed Hamza to Send Message

Connect

Connect with Mohamed Hamza to Send Message

Connect
  • Timeline

  • About me

    Project Control Engineer | SAP ERP Key User | PMP prep | CAFT | IPMA

  • Education

    • El Shorouk Academy

      2013 - 2018
      بكالوريوس الهندسة Construction Engineering
  • Experience

    • Egyptian Armed Forces Engineering Authority - الهيئة الهندسية للقوات المسلحة المصرية

      Dec 2018 - Jan 2020
      Highway Engineer

      Projects :-30th June Road-Quarry Road-Glala City for MarpelTasks : -Supervision on the earthwork-Supervision on Survey works-Quality control and Quality assurance

    • El Kady

      Jan 2020 - Jan 2021
      Infrastructure Engineer

      Projects :-2600mm Steel pipes (Supply fresh water to the 5th Settlement)-(1200/1600)mm Steel pipes (Supply Fresh water along El- Moshir Axis)-1500mm Concrete pipes (A sewer system in 1th Settlement)Tasks : -Supervision on the earth works-Supervision on the welding and pipe fitting works-Quality control on pipe fitting -Supervision on Survey works

    • Samco-National Construction Company

      Feb 2021 - Sept 2024

      Projects :Dawly Sahly Bridge above El-Salam CanalQena Suspended Bridge Point 90 TunnelRehab Malls (Saja mall complex/ Mall A/ Mall B/ Mall C/ Mall D1/ Mall D2/ Mall E/ Mall F/ Saja mall extension / Flying Restaurant 1/ Parking of Flying Restaurant 1/ Rich Cut Mall) (-Ring Road extension-Saja 3 Mall-Wafaa we Aml MallTasks :-control and monitor project total expenditure including verifying and checking of invoices and claims-Perform and manage project financial activity monitoring and purchase requests creation and follow up-Prepare monthly movement report for the monitoring of the project activities on a daily basis promptly to the project manager and management-Perform project costing related reporting to the team and management’s review Show less Projects :Dawly Sahly Bridge above El-Salam CanalDawly Sahly intersection with Sedi Abd El-RahmanRehab Malls (Saja mall complex/ Mall A/ Mall B/ Mall C/ Mall D1/ Mall D2/ Mall E/ Mall F/ Saja mall extension / Flying Restaurant 1/ Parking of Flying Restaurant 1/ Rich Cut Mall)-Ring Road extensionTasks :-control and monitor project total expenditure including verifying and checking of invoices and claims-Perform and manage project financial activity monitoring and purchase requests creation and follow up-Prepare monthly movement report for the monitoring of the project activities on a daily basis promptly to the project manager and management-Perform project costing related reporting to the team and management’s review Show less Projects :-El-Rehab Malls (Saja mall complex - Saja mall extension - Malls (A /B /C /D1 /D2 /E /F)-Masjed El-Rehab (El Aly El Azem)-El-Lotus Malls (1 /2 /3)-5th Settlement Malls (Midor /Saja 3)-Saja Mall 2-Flying Restaurants (1 /2)-El Helmya Building-Roxy MallTasks :-Shop drawing of the different elements of the building (Foundations / Tie Beams / Columns / Slabs / Beams / Tanks / Raft / Rafts with drop)-Quantity Survey of the Project elements -Writing & Editing the B.O.Q Show less

      • Senior Cost Control Engineer

        Jan 2023 - Sept 2024
      • Cost Control Engineer

        Jan 2022 - Jan 2023
      • Technical Office Engineer

        Feb 2021 - Jan 2022
    • Kharafi National

      Aug 2024 - now
      Project Control Engineer

      Projects: -- Rehabilitation & Expansion of El-Robeiki Industrial Wastewater Plant A rehabilitation area with more than 30 tanks for sedimentation disinfection filtration and treatment - NEW DELTA 6 220/66/22 KV (2*175+3*40) MVA GIS Substation at Alexandria and West Zone Adjudication An electric power plant consists of [200kv GIS building | 66KV GIS building | 175MVA Transformer building | 40MVA Transformer building with different secondary building like Fire fighting room Control building and oil tank all connected with duct banks and trenches] - NEW DELTA NDRPS2 220/66/11 KV GIS Substation Adjudication(Rawafee Rashed 2 Substation) An electric power plant consists of [66kv GIS building | 22KV GIS building with different secondary building like Fire fighting room Control building and oil tank all connected with duct banks and trenches]Tasks :-control and monitor project total expenditure including verifying and checking of invoices and claims-Perform and manage project financial activity monitoring and purchase requests creation and follow up-Prepare monthly movement report for the monitoring of the project activities on a daily basis promptly to the project manager and management-Perform project costing related reporting to the team and management’s review Show less

  • Licenses & Certifications