Vinay Kumar Singh

Vinay Kumar Singh

Project Manager

Followers of Vinay Kumar Singh488 followers
location of Vinay Kumar SinghUttar Pradesh, India

Connect with Vinay Kumar Singh to Send Message

Connect

Connect with Vinay Kumar Singh to Send Message

Connect
  • Timeline

  • About me

    Team Leader Cum Sr. Highway Engineer

  • Education

    • Kalinga University, Raipur

      2016 - 2019
      Master of Technology - MTech Transportation and Highway Engineering First Division
    • Ramaiah Institute Of Technology

      1986 - 1990
      Bachelor of Engineering - BE Civil Engineering First Division
    • Kamla Nehru Institute of Technology, Sultanpur

      2011 - 2013
      Master of Technology - M. Tech Geotech Engineering First Class

      First class with Distinction

  • Experience

    • Maheshwari Company

      Jan 2003 - Apr 2004
      Project Manager

      Construction for Strengthening, Widening and Up-gradation including O & M of 2/4-lane road with paved Shoulder from Mohammadpur to Doharighat (56.258kms) in Uttar Pradesh – World Bank Aided.,SH-66,SH-34, SH-73 (UPSRP-17)Length: 56.258Km; lane: 2/4; Flexible Pavement, Project Cost: 40 Crores; FIDIC Condition

    • Larsen & Toubro

      Apr 2004 - May 2007
      RE/ACM

      Up-gradation of Road from Jaunpur to Mohammadpur including Major maintenance (O&M) of Jaunpur City Portion (existing single lane to 4 Lane) (45.2 km + Bypass new construction) in the state of U.P - World Bank Aided, (UPSRP-03), SH-66A, Client-UPPWD. Length: 45.2 Km; Lane:2/4; Flexible Pavement, Project Cost -100Crores;FIDIC Condition

    • NCC Limited

      Jun 2007 - Dec 2008
      Project Manager

      Construction of Strengthening & Widening of 4 Laning of NH – 28 (Section of EW Corridor) from Ayodhya to Gorakhpur, Km 164.00 to Km 208.00 (44 Kms), Flexible/Rigid Pavement, World Bank Funded. Package No. 5 Cost of Project 266 Crores; Length: 44Km; lane:4; Mode: FIDIC Condition

    • UPHAM INTERNATIONAL CORPORATION

      Jan 2009 - Dec 2010
      Highway Engineer/Acting Team Leader/HDE

      Consultancy Services as Independent Engineer Services for Construction Supervision of Greenfield 4/6-Laning, From 0+000 to 32+270 Part of East-West Corridor(Green Field Work), BOT (Annuity Basis)Client: NHAI, BOT Basis; Length: 32 KM; Flexible Pavement, Lane: 4/6; Project Cost: 600 Crores, in UP 01.01.2010 & Maintenance of existing NH-28 (Two-Lane) in Gorakhpur City via Nausad, Rustampurdhala, and Kushmi arera

    • Soma Enterprise Ltd.

      Jan 2011 - Jan 2013

      Preparation of Detailed Project Report & Design for four lane of Jabalpur-Rewa section on NH-7 from Km 242.300 to Km 465.500 (Including Katani Bypass) in state of Madhya Pradesh on DBFOT(Toll) Basis (PPP) under NHDP-IV, Rigid/Flexible pavement, Project Cost- 1980 Cr. Construction of Six Laning of Varanasi-Aurangabad Section of NH-2 from Km 786.000 to Km 978.400 (SOMA-ISOLUX) in state of UP & Bihar, NH-2, DBFOT(Toll) Basis, Rigid/Flexible pavement, Client: NHAI; Length: 192.400 KM; Lane:6;Cost – 2850 Crores.

      • Project Manager

        Feb 2012 - Jan 2013
      • Project Manager

        Jan 2011 - Jan 2012
    • Bloom Companies, LLC

      Feb 2013 - Jun 2020

      Consultancy Services for Authority’s Engineer for Construction of Access Controlled Nagpur- Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) in state of Maharashtra on EPC mode for Package-11, Project Length-30Km (Village Dhotre to Village Derde Korhale), Rigid Pavement, Project Cost-1312 Cr. Consultancy services for Authority’s Engineer for Construction Supervision of Jalandhar –Amritsar Section of NH-1 from Km 387.100 to Km 407.100 in the State of Punjab (the “EPC”) Length: 20KM Lane: SIX Lane, Client : NHAI, Flexible Pavement, TPC:523 Crores Independent Engineer services for Two Laning of Purnea - Khagaria Section of NH-31 from Km. 270.000 to Km. 410.000 in the State of Bihar under NHDP – III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity Basis Client: NHAI, Length: 140 Km; Flexible Pavement, Project Cost: 664 Crores

      • Team Leader

        Dec 2018 - Jun 2020
      • Team Leader

        Apr 2014 - Dec 2018
      • Team Leader

        Feb 2013 - Mar 2014
    • Intercontinental Consultants and Technocrats Pvt. Ltd.

      Jun 2020 - Mar 2022
      Deputy Team Leader

      Consultancy Services for Authority’s Engineer for supervision of Package-I to Package-III of Bundelkhand Expressway in the state of Uttar Pradesh on EPC basis

    • THEME ENGINEERING SERVICES PRIVATE LIMITED

      Mar 2022 - now
      Team Leader Cum Sr. Highway Engineer
  • Licenses & Certifications

    • Safety during Construction and Zero Accident Certificate

      Larsen And Toubro Limited, Powai
      Jan 2005
    • Excellent in working as Team Leader

      National Highway Authority Of IndiaÊ(Nhai)
      Jan 2018
    • Advance training in safety during design and construction

      National Highway Authority Of IndiaÊ(Nhai)
      Jan 2018