Zoobia Mahmood

Zoobia Mahmood

Intern

Followers of Zoobia Mahmood359 followers
location of Zoobia MahmoodPakistan

Connect with Zoobia Mahmood to Send Message

Connect

Connect with Zoobia Mahmood to Send Message

Connect
  • Timeline

  • About me

    Manager at K-Electric

  • Education

    • Khatoon-e-Pakistan Government Degree College for Women

      2005 - 2007
      Intermidiate Pre-Engineering
    • Khatoon-e-Pakistan Government Girls Secondary School

      2003 - 2005
      Matriculation Science (SSC)
    • NED University of Engineering and Technology

      2019 - 2019
      Diploma Project Management A
    • NED University of Engineering and Technology

      2007 - 2011
      Bachelor of Engineering - BE Electrical Engineering (EE)
  • Experience

    • Pakistan International Airlines

      Jun 2010 - Jul 2010
      Intern

      Has successfully completed internship program with PIA engineering at Aircraft Maintenance Hangers/Backup Shops.

    • Siemens

      Jan 2011 - Oct 2011
      Final Year Project

      Worked on the final year project, during under graduation, sponsored by the company bearing the title of Efficient and Flexible Controlling of Heliostat (Plane Mirror) for Solar Thermal Generation using LDR as light sensing device.Solar energy can be converted into thermal energy to run steam turbine in a solarthermal power plant. This task is performed by efficient convergence of solar radiationsutilizing accurate positioning of concave mirrors.The position of sun is changing continuously, so the concave mirrors have to maintain aconstant focal point at which the boiler is installed.The concave mirrors are moved using controller interfaced stepper motor in order toconcentrate the sun energy at its maximum level.In order to detect the correct position of the sun image processing is utilized. It is a flexible and accurate method to locate sun and generate signals to reposition the mirrors with respect to the position of the sun.A simulation of the process will be designed using SimPowerSystem. Show less

    • K-Electric

      May 2012 - Aug 2016

      Strategize and implement different methodologies to reduce line losses (Theft inspection, monitoring of abandoned schemes, maintain hook connection details, timely distribution and recovery of bills with payments respectively, segregation and alignment of unmapped/wrongly mapped consumers).Timely replacement of faulty consumer meters and clear the backlog of consumer complaints for which meter replacement is needed.To clear backlog of Check meter not installed/faulty on PMTs/SS in addition to fault rectification of Check meter.Replacement of consumer’s old/faulty energy meters in the areas where conversion of bare conductor to insulated ABC (Aerial Bundle Conductor) and HVDS have already been done, in order to achieve fruit result in loss reduction and revenue generation.Built quarterly budgets for each assigned projects utilizing the past trends.Ensured that each project was being delivered in a timely manner while being under budget. Preparation of daily report to observe departmental improvements under specific SOPs. Ensured adequate on hand quantity of the materials and developed a system which indicated when materials were below the threshold limitations, so an order could be sent out in a timely manner. Team leader and department ambassador for the certification of ISO 9001-2008.Developed and implemented SOPs and monitor compliance against information quality policies among employees and third-party vendors.Monitor compliance of all safety procedures according to the developed SOPs among filed staff and third party vendor.Maintained listing of vehicles (department-wide) to ensure proper maintenance is being performed and ensure timely inspection by corresponding department so that vehicles are in operation and perform to expectation.Understanding company’s strategy and positioning and transferring it to clients. Individual client dealing, responding to queries and providing solutions.Maintaining data on SAP EDM. Show less

      • Assistant Manager

        May 2013 - Aug 2016
      • Engineering Trainee

        May 2012 - May 2013
    • K-Electric

      Dec 2018 - now

      •Devise technical training programs according to organizational requirements.•Produce training schedules and classroom agenda.•Determine course content according to objectives.•Prepare training material (presentations, worksheets etc.)•Execute training sessions and practical demonstration in groups or individually.•Keep and report data on completed topics absences, issues etc.•Observe and evaluate results of training programs.

      • Manager

        Oct 2024 - now
      • Deputy Manager

        Jul 2021 - Sept 2024
      • Assistant Manager

        May 2019 - Jun 2021
      • Technical Trainer (Freelance)

        Dec 2018 - Apr 2019
  • Licenses & Certifications

    • NEDIAR Project Exhibition

      NED University of Engineering and Technology
    • South Asia Region Women Engineering's Leadership Program WePower-SAR100

      Asian Institute of Technology
      May 2025
    • Project Management Professional (PMP)

      NED University of Engineering and Technology
      May 2019
    • Registered Electrical Engineer

      Pakistan Engineering Council
      Dec 2012
    • South Asia Region Women Engineer's Leadership Program

      Asian Institute of Technology
      May 2025
  • Honors & Awards

    • Awarded to Zoobia Mahmood
      Highest Achiever K-Electric March 1, 2016 Highest Achiever Award in Operational Excellence Program