
Md. Anwarul Islam
Research Assistant Intern

Connect with Md. Anwarul Islam to Send Message
Connect
Connect with Md. Anwarul Islam to Send Message
ConnectTimeline
About me
Environmental Management Officer (EMO) | Tokyu-Max Joint Venture | Dhaka Mass Rapid Transit Development Project (MRT Line 1, CP 01)
Education

Khulna Public College
2010 - 2012Higher Secondary Certificate (HSC) Science GroupMorning Shift I Section: A
.webp)
Patuakhali Science and Technology University (PSTU)
2014 - 2018Bachelor of Science (B.Sc.) in Disaster ManagementFaculty of Disaster Management
Experience

Department of Geography and Environmental Studies, University of Rajshahi
Nov 2017 - Apr 2018Research Assistant InternProject Name: Determination of Economic Security and Social Capital for Climate Change Adaptation to Cyclone Risk at Household Level in Coastal Region of Bangladesh DeltaProject Funding: DECCMA project, Institute of Water and Flood Management (IWFM), Bangladesh University of Engineering and Technology (BUET)Implementing Lead Organisation: Department of Emergency Management, Patuakhali Science and Technology UniversityDuration of the Project: 01 November 2017 to 30 April 2018Workstation: Dacope Upazila, Khulna, BangladeshKey Performance Indicator:• Field survey for stakeholders assessment• Key Informant Interview (KII)• Household Questionnaire Survey (HQS)• Focus Group Discussion (FGD)• Electronic data collection from the site• Infrastructure development site visit and inspection eg. Cyclone shelter, river embankment, water treatment plant, etc.• Secondary data collection• Data entry and scientific analysis• Report writing• Presentation Show less

MAX Group
Jan 2020 - Dec 2021Contract Management Department of Max Infrastructure LimitedKey Responsibilities• Managed and monitored to fulfill all the project`s EHS compliances and contractual requirements.• Implemented Environmental requirements as per contract specifications in the Rooppur Nuclear Power Plant and other projects.• Risk management by analyzing, implementing, and monitoring all the required insurances as per project contractual agreement. e.g. Erection and Operational All Risk, Plant & Machinery, Third Party & Employers Liability, Worker's Compensation, Marine & Cargo, Fire, Public & Product Liability, Medical Insurance, etc. Show less Kushiara Power Company Limited (KPCL)Project: 163 MW Gas-Fired Combined Cycle Power PlantPhase: OperationalKey Responsibilities:• Implemented Environmental and Social Action Plan (ESAP) according to ADB and IDCOL contractual requirements.• Delivered quarterly Environmental and Social Monitoring Plan (ESMP) report to IDCOL as per KPCL-IDCOL contractual clause.• Monitored different parameters of wastewater, surface, and groundwater, stack emission, and noise level as per ADB common term agreement, IFC, and ECR standards.• Implemented an Environmental Emergency Contingency Plan (EECP) in terms of occupational health and safety risk management.• Prepared presentations and reports for senior management and other stakeholders,, summarizing EHS performance and highlighting areas of concern.• Liaised with and handle delegates of the DoE, DIFE, and BFSCD for periodical inspection and license renewal of the company.• Evaluated the effectiveness of the mock drills and training programs and implemented improvements as necessary.• Conducted internal EHS training, toolbox meetings, safety committee meetings, and induction training programs.• Conducted Hazard Identification and Risk Assessment (HIRA) and enforce preventive measures.• Coordinated with waste management vendors to ensure proper handling and disposal of hazardous and non-hazardous waste materials. Show less Max Power Limited (MPL)Project: 78.5 MW Gas-Fired Simple Cycle Power PlantPhase: OperationalKey Responsibilities:• Implemented monthly environmental monitoring of air quality, wastewater, stack emission, and noise according to IFC and ECR standards.• Submitted weekly and monthly reports according to site monitoring and assessment in terms of environmental, social, and occupational aspects.• Monitored compliance with environmental regulations e.g., hazardous waste management, and spill prevention.• Conducted regular fire drills to test the readiness of the firefighting equipment and emergency response procedures.• Formulated weekly and monthly Environment, Health, and Safety reports.• Conducted regular toolbox meetings and training programs.• Hazard Identification and Risk Assessment (HIRA) with rectification.• Managed hazards by maintaining and following the Permit to Work (PTW) procedure, ensuring all work was conducted in accordance with established safety protocols. Show less
Executive, Contract Management
Jun 2021 - Dec 2021Environment, Health and Safety Officer
Apr 2020 - May 2021Trainee Environment, Health and Safety Officer
Jan 2020 - Mar 2020

Samsung C&T Corporation
Jan 2022 - Mar 2023EHS ProfessionalProject: Bangladesh Meghnaghat 718 MW Combined Cycle Power PlantEPC Contractor: Samsung C&TPhase: ConstructionKey Responsibilities- Environmental monitoring and management- Hazard Identification and Risk Assessment with rectification.- Monitoring, observation & inspection of the construction site according to the established Environment, Health, and Safety policy of Samsung C&T Corporation.- Implementing onsite radiation safety procedure during Radiography Test (RT).- Daily Toolbox meeting with subcontractors- Responsible for implementing an emergency response plan for confined space sandblasting work.- Permit To Work (PTW) issuance, inspection, and monitoring.- Responsible for implementing an emergency response plan for GT lube oil flushing work.- HSE documentation as per Samsung C&T Corporation standard. Show less

Tokyu-Max Joint Venture
Apr 2023 - nowEnvironmental Management OfficerProject: Construction of Civil Works of Soil Improvement and Land Development at Depot for MRT Line 1EPC Contractor: Tokyu-Max Joint VenturePhase: ConstructionKey Responsibilities:- Executing the Environmental Protection Plan according to the contract specifications.- Drafted and implementing the Contractor's Environmental Management Plan (CEMP).- Coordinating the monthly internal and quarterly external environmental monitoring.- Drafted and implementing the Vector Control Plan.- Monitoring and recommending to the concern team to improve and maintain the labor provisions as per the project contract specifications.- Drafted weekly and monthly presentation regarding environmental activities of the CP 01.- Rectification and official submission of the Consultant Field Inspection Report.- Prepared environmental part of monthly progress report and monthly environmental report.- Conducted Dilapidation survey- Conducted SCP and trial PVD noise and vibration measurement and data analysis.- Drafted environmental part of Method statement for Construction of embankment, Sand Compaction Pile (SCP), Pre Fabricated Vertical Drain (PVD), Excavation etc. Show less
Licenses & Certifications

Introduction to the World Bank Environmental and Social Framework
The World Bank GroupFeb 2025- View certificate

ISO 14001:2015 - Environmental Management Systems (EMS)
AlisonFeb 2021 - View certificate

Environmental Management Studies
AlisonApr 2021 - View certificate
.webp)
Green Investments: Renewable Energy
Asian Development Bank (ADB)Jul 2021 - View certificate

Global Environmental Management
DTU - Technical University of DenmarkApr 2021 - View certificate

Sustainability and Climate Change
AlisonApr 2021 - View certificate
.webp)
Achieving Sustainable Development Goals on Water and Sanitation
Asian Development Bank (ADB)Jul 2021 - View certificate

Environmental Safety
Saint Petersburg State UniversityMar 2021 - View certificate
.webp)
Municipal Solid Waste Management in Developing Countries
EPFL (École polytechnique fédérale de Lausanne)Apr 2021 
Basic First Aid with CPR
Samsung C&T CorporationJul 2022
Languages
- enEnglish
- beBengali
- hiHindi
Recommendations

Pavan kumar
UX DesignerKarnataka, India
Helena junicke
Associate Professor and Co-FounderKongens Lyngby, Region Hovedstaden, Danmark
Joycelina fadjar
Lifelong Learner | PMO | Human Capital | Trainer | Ex-Recruiter | Sales by Nature | Designer at Hear...Jakarta Metropolitan Area
Divya s
Development Manager | Certified Scrum MasterBengaluru, Karnataka, India
Christopher backianathan
Principal Engineer at Tenneco automotive Inc , MonroeNepean, Ontario, Canada
Trinette cossa
Claims DirectorClover, South Carolina, United States
Amir jessar
EntrepreneurJakarta, Jakarta, Indonesia
Felton p. gwaltney ii, cqm
QA/QC Manager at SkanskaAtlanta, Georgia, United States
Andile mavuso
Plant Foreman at Pan African Resources PLCMpumalanga, South Africa
Courtney sidereal
Stay-at-Home-ParentTarrytown, New York, United States
Jose rodriguez-villalobos
Senior Portfolio Manager, Senior Vice President - Private Wealth Management at UBS Financial Service...Boston, Massachusetts, United States
Patricia pieter
Founder of Center for Indonesia-China StudiesJakarta Raya, Indonesia
Ahsen bilal qaimkhani
Air Traffic Control Officer | EngineerPakistan
Orestis alpos
Building secure and scalable distributed systems and cryptography. PhD graduate, engineer and resear...Switzerland
David amoêdo
Project Manager | Hitachi RailLisbon Metropolitan Area
Tyhulu pinyana
Senior Manager - Regional Design & Development at Toyota SA MotorsDurban, KwaZulu-Natal, South Africa
Ambili t
Oracle Analytics Ambassador | Oracle Ace Pro | Analytics Principal Consultant at Rittman Mead, A Pyt...Reading, England, United Kingdom
Melanie kustamin
Data analyst | Data scientist | Chinese SpeakerKecamatan Medan Kota, North Sumatra, Indonesia
Hiya bhasin
IB Learner | Public Speaker | Community ServerGurugram, Haryana, India
Charity tay
Assistant Vice President - Operations at Fiera CapitalSingapore
...