Muhammad Sufian Bustamam

Muhammad Sufian Bustamam

Senior Instrumentation & Automation Engineer

Followers of Muhammad Sufian Bustamam380 followers
location of Muhammad Sufian BustamamSingapore

Connect with Muhammad Sufian Bustamam to Send Message

Connect

Connect with Muhammad Sufian Bustamam to Send Message

Connect
  • Timeline

  • About me

    Electrical and Software Engineer

  • Education

    • California State University-Sacramento

      2009 - 2014
      Bachelor of Science (BS) Electrical and Electronics Engineering

      Activities and Societies: Competitive Robotics- Built robots to battle other constructed robots in a competitive robots within an arena. Lunabotics- Participated in a NASA sponsored competition to build a Lunar Resource Excavator. Competitive robotics, Lunabotics. Graduated with 3.5 GPA

  • Experience

    • US Navy

      Jan 2005 - Jan 2009
      Senior Instrumentation & Automation Engineer

      Directed 70+ member propulsion plant team on the aircraft carrier USS Kitty Hawk. Managed day-to-day operations andmaintenance of propulsion automation systems. Managed preventative maintenance programs and all environmentalcompliances at the facility including 1200 PSI steam generation boilers, feed pumps, electrical generators and ship fuelsystems.Accomplishments• Promoted to Senior Propulsion Plant Engineer in 2007, and earned #1 ranking in 2007 and #2 ranking in 2006.• Improved operational efficiencies in responding to changes in ship speed, electrical load and aircraft launch demands,• Improved ship’s boiler plant efficiency 50% through large-scale parts replacement and testing, reducing reaction from oneminute to 30 seconds.• Managed overhaul of ship’s emergency backup systems in record time of 3 days. Show less

    • Tesco Controls, Inc.

      Jun 2014 - Jun 2019
      Project Engineer/ Electrical Distribution & Controls Engineer

      Project Engineer Tesco Controls, Inc., Sacramento 6/2014 – July 2019Tesco Controls: full-service systems control integrator and original equipment manufacturer (OEM) with locations in 6 states.Primary Engineer on over 50 projects that involved water, wastewater or industrial electrical and control systems testing,startup and commissioning. Design and manage full project lifecycle of control centers, automated control panels for utilityinfrastructure, telecommunication hub centers & automated processing centers on projects ranging up to $600K. Selectinstrumentation for water and wastewater projects. Conduct electrical inspections and perform loop instrumentation toensure correct operation. Inspect and troubleshoot electrical machinery, rotating machinery, chemical metering systems,large valves and general water/wastewater process equipment. Manage testing and startup plans in projects involvingpump stations, treatment plants and wastewater treatment plants, equipment and processes. Manage design change andidentify problems and solutions to meet ISO safety standards and procedures. Show less

    • CDK Global

      Dec 2021 - now
      Software Engineer
  • Licenses & Certifications

    • E.I.T. (Fundamentals of Engineering)

      National Council of Examiners for Engineering and Surveying
      Jan 2014
      View certificate certificate
  • Honors & Awards

    • Awarded to Muhammad Sufian Bustamam
      Third Place - Future Four Entrepreneurs Contest California State University Program for Entrepreneurship Apr 2014 Worked as part of a four-person interdisciplinary team of business and engineering students to deliver an abstract, 5-page summary and 10 minute presentation to a panel of judges composed of government officials and business executives. The results were based on the necessity of the product and its innovation. The presentation detailed the overwhelming need, functionality and comprehensive business strategy of a wearable device, which monitors the risk levels posed to firefighters during fire… Show more Worked as part of a four-person interdisciplinary team of business and engineering students to deliver an abstract, 5-page summary and 10 minute presentation to a panel of judges composed of government officials and business executives. The results were based on the necessity of the product and its innovation. The presentation detailed the overwhelming need, functionality and comprehensive business strategy of a wearable device, which monitors the risk levels posed to firefighters during fire suppression operations Show less
    • Awarded to Muhammad Sufian Bustamam
      Second Place - I2P Early-Stage Biotechnology Commercialization Challenge California State University Program for Education and Research in Biotechnology Symposium Jan 2014 Worked as part of a four-person interdisciplinary team of business and engineering students to deliver an abstract, 5-page summary and 10 minute presentation to a panel of judges composed of chief executives and administrators from several biotechnology firms. Both the summary and the presentation detailed the overwhelming need, functionality and comprehensive business strategy of a wearable device, which monitors the risk levels posed to firefighters during fire suppression operations.