Ponciano Julian

Ponciano Julian

Mechanical Engineer

Followers of Ponciano Julian2000 followers
location of Ponciano JulianNational Capital Region, Philippines

Connect with Ponciano Julian to Send Message

Connect

Connect with Ponciano Julian to Send Message

Connect
  • Timeline

  • About me

    Sr. Project Engineer Shell Oil Nigeria

  • Education

    • University of the East

      1979 - 1986
      Bachelor of Science in Mechanical Engineering ENGINEERING 5th year course

      Mga Aktibidad at Samahan:PSME - Philippine Society of Mechanical Engineering University of the East alumni ASME - American Society of Mechanical Engineers Bachelor of Science in Mechanical EngineeringUniversity of the East (1979-1986)Claro M. Recto,ManilaPhilippinesDiesel MechanicsTechnological Institute of the Philippines (1978-1979)G.Puyat,QuiapoManila,Philippines

    • Technological Institute of the Philippines

      1978 - 1979
      Diesel Mechanic Internal combustion Engine
  • Experience

    • Mannesmann arabia Ltd. Saudi Arabia

      Jan 1991 - Jan 1992
      Mechanical Engineer

      PROJECT: I • ARAMCO Pump station east – west pipeline pump station 1 – 4 Project EPC-Mannesmann – Germany (Contractor MABSA Mannesmann).• Monitor all related rotating equipment erections i.e., Turbines, generators, gear boxes pumps, and skid mounted accessories, etc. ensure that equipment installation procedures are met according to specification duly agreed by the owner and contractor i.e., equipment orientation, elevation, levelling, grouting, pipe strain, shaft deflection shaft alignment, etc. until the final handover to the client.• Assist in the development and update of department standards and procedures.• Cross checks isometrics and PEFS: checks isometrics and PEFS:• Perform plant and piping design activities as a member of taskforce under guidance provided by the leader and cooperate with multi-discipline designers• Review the documentation relevant to the systems and ensures the system area constructed in accordance with prescribed information – drawings specification and vendor information.• Assist in review and quality control of mechanical engineering design work by design contractors Mas kaunti

    • Mitsui Engineering & Shipbuilding Co. Ltd.,/Snamprogetti/CCIC - JV

      Jan 1992 - May 1993
      Piping Engineer

      PROJECT: I • Petrokemya Olefins EPC MESAR / MITSUI- Japan (Contractor CCIC)PROJECT: II• IBN ZAHR MTBE II EPC Snamprogetti- Italy (Contractor CCIC)• Responsible for fabrication and installation / erection of all piping works ranging ½” – 100” dia. On a reactor line.• Supervise installation of deluge system piping works and underground firefighting lines.• Prepare punch list for finished work prior to hand over to by contractor by paying special attention to all equipment’s including Quality checks.• Coordinates and monitors the hydro test and reports on the completion of hydro tests. Mas kaunti

    • Mitsubishi Kakoki Kaisha Ltd /Chiyoda/CCIC- JV

      May 1993 - Jan 1994
      Piping Engineer

      PROJECT: I • Das Island LNG 3rd Project EPC, EPC Chiyoda/Mitsubishi (Contractor CCIC)• Coordinates with the client senior piping engineer during construction activities.• Cross checks isometrics and PEFS:• Direct Involved and participate in development of as-built drawings / documentation.• Responsible for the fabrication and installation of plant refinery piping.• Coordinate with project consultant to ensure all components are per the drawing & report deficiencies on the pre hydro punch list.• Attending/generating punch points as a part of mechanical completion activities. Confirm there are no category A punch list items. Mas kaunti

    • Technip/Becthel /Pritchard/CCIC- JV

      Jan 1994 - Jan 1996
      Piping Engineer / Hydro testing

      PROJECT: I • Sulfur Recovery Plant Train – 3 EPC, Bechtel / Technip / Pritchard (Contractor CCIC)• New Plant Piping Erection In-Charge for Utility and Installation of all piping work raging ½” to Large bore.• Supervise/Manage and monitoring the performance of contractors in related with the work activities for offsite/inside battery limit.• Issue field decisions to rectify constructions conflict field suiting design error or material modification, and responsible for the pre punch and final punch out of the piping system prior to testing and pre commissioning.• Test Package Preparation as per project procedure.• Supervise the preparation on testing, of pipes in the field. Mas kaunti

    • Mitsubishi Kakoki Kaisha Ltd (6331)

      Jan 1996 - Jan 1997
      Piping Engineer / Testing Engineer

      PROJECT: I • NOF MAS Chemical industries, DI Peroxide – Industrial City, Jakarta, EPC- Mitsubishi (MKK) LTD. Contractor-MitsubishiPROJECT: II• Carbon Black Expansion Project-Celigon / Merak,EPC – Mitsubishi (MKK) LTD. Contractor Mitsubishi• Coordination with the Client/Vendor for the smooth execution of construction activities and conduct safety, operability and maintain ability audits.• Execution engineer in charge for refinery shut down works of piping fabrication, erection, modification, Tie in, Punching, Testing, and Commissioning. Mas kaunti

    • Technip Snamprogetti Kellog Brown & Root and Japan gas Corp.

      Jan 1998 - Jan 2002
      Lead Piping Engineer / Testing Engineer

      PROJECT: • NLNG Expansion project – Train 1-2 & 3 – Bonny Island Water cooled Type.• 12” & 18” x 8km GRP water feed lines supply to Train 1-2-3 & Residential area.• 40” x 3km GRVE CWS –CWR and 4Km AOC / COC Lines. EPC – TSKJ JV. (Contractor Technip / Snamprogetti /KBR/ Japan gas corp.)• In-charge for utility and installation of underground piping, such as GRP-GRVE CWS/CWR, AOC, COC, Demin water, FW. HTF lines.• Conduct equipment installation inspection per the ITP’s.• Issued field decision to rectify design error, Punching, monitoring testing and documentation based on existing international piping codes and standards. (ASME/ANSI B31.1, B31.3, B31.4, B31.8 & B16.5 16.34.)• With Knowledge of material selection, corrosion control, GRE, non-metallic piping specification, and full appreciation of international codes / piping classes for piping valves. Mas kaunti

    • 4. NIGERIAN LIQUEFIED NATURAL GAS, (NLNG) NIGERIA

      May 2003 - Jan 2006
      PROJECT INTERFACE ENGINEER / PIPELINE ENGINEER

      PROJECT: I• GTS - Gas Transmission Pipeline (GTS -2) Consist of 40” dia. x 90 km. Upstream EGGS- Eastern gas gathering system. (Contractor-shell (SPDC)• Slug catcher area / receiver downstream (Contractor-Aker Kvaerner (AKZ-Nigeria Ltd.)• Gas transmission Pipeline (GTS-5) Consist of 24” dia. x 59Km. Amenam /Kpono gas line bonny island export receiver. Contractor –Total / Elf Petroleum. • Assigned as 3rd Party Project interface for all GTS Pipeline• Responsible for establishing and maintaining working relationship with the project managers of the third-party gas suppliers to train 4 & 5. (SHELL, NAOC AGIP, TOTAL)Sr. Piping / Pipeline Engineer – (Gas Supply Project)Nov-2002 to May-2003 PROJECT: II• GTS- Gas Transmission Pipeline (GTS -3) Consist of 32” dia x 258 km & Crossover / Slug Catcher Onshore / Offshore gas gathering system. OGGS to RPA (Contractor-shell (SPDC)• GTS- Gas Transmission Pipeline (GTS -4) Consist of 24” dia loop line x 50 km. Upstream and Pig launcher Receiver. (Contractor-Total elf Petroleum)• Feed to 36” dia x 81 km NODE to Bonny River Receiving Facilities (Contractor – Nigerian AGIP (NAOC-ENI).• NLNG Expansion Project – Train 3, Water cooled Type, EPC-TSKJ (Contractor –TSKJ JV. (Technip / Snamprogetti / KBR / Japan gas corp.) Mas kaunti

    • Shell

      Jan 2006 - now
      Construction Project Installation Engineer

      1.SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) NIGERIASenior Project Engineer – GUIOP (Gbaran Ubie Integrated Oil and Gas Project)Oct-2016 to PresentPHASE I: FLB/EPF/CPF – Central Processing Facility (CPF) with 1000 MMscf/d gas handling capacity (expandable to 1400MMscfd); 120 Mbd gross liquid handling capacity, 180 MMscf/d Ag compression capacity plus 90 MB condensate tank. AG collection from Gbaran, Kolo Creek, Etelebou and Zarama fields Connect to CPF, including +/-60 MMscf/d of XHP AG that bypasses the compression facilities2. SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) NIGERIA PHASE 2A (Infill): Gbaran, Koroama, Epu. Develop 1.3 trillion scf non associated gas. CPF – Field logistic base, Early production facility and Central Processing Facility (CPF) • Gbaran-Ubie Infill Phase 2A Capacity 175,000 Barrels of oil per day and 864 million standard cubic feet of gas per day (MMscf/d) and 26,000 barrels condensate per day.3. Shell Petroleum Development Company of Nigeria Ltd. Mechanical Piping Engineer – (Cawthorne Channel Further Oil Development Projects. Awoba Flow Station)June-2007 to Dec-2012PROJECT:• Change out of existing gas engine driven reciprocating crude oil pumps, to electric motor driven centrifugal pumps in Caw channel 1,2,3, Awoba stations with associate delectric upgrade works.• Upgrade of 5 flow stations (Cawthorne Channel 1,2,3, Awoba & Krakama flow. Mas kaunti