Alaa Hady

Alaa Hady

RTN Site Engineer

Followers of Alaa Hady8 followers
location of Alaa HadyEgypt

Connect with Alaa Hady to Send Message

Connect

Connect with Alaa Hady to Send Message

Connect
  • Timeline

  • About me

    Senior Supervisor at Ericsson

  • Education

    • Faculty of Electronic Engineering , FEE Menouf

      2005 - 2010
      BSC Electrical, Electronics and Communications Engineering

      Activities and Societies: Member of Student Union of menofia university • Graduated From Faculty of Electronic Engineering 2010.• Studied Electrical, Communications and Electronics Engineering.• Graduation Project Grade: Excellent.• General Grade: Very Good 75.4%.also there are more courses that were studied in faculty of electronic engineering :GSMGPRSCDMAUMTSCCNADigital CommunicationsSatelliteRadarSonarMaths

  • Experience

    • Alkan CIT

      Jul 2010 - Sept 2010
      RTN Site Engineer

      Alkan CIT RTN Site Engineer /Etisalat Account • Working on Transmission project, Etisalat Account.• Trained on Huawei RTN Equipment with Dish Size 0.3 and 0.6m, also Configuration 1+0 and 1+1.

    • AFRO Group

      Sept 2010 - May 2012

      Afro-Egypt Modernization Engineer , Senior Commissioner (BTS, MW) /VFE Account • Working on Modernization project, VFE Account.• Dealing with all Ericsson Cabinets 2000, 3000 and 6000.• Swap from 2000 and 3000 to 6000 family.• Battery test for all kinds of E// Power Cabinets. (6500, Indoor 6200, Outdoor 6200, SSC02 , PBC 02 ,PBC 05)• Defining and trouble-shooting External Alarms.• Trouble-shooting and closing 2G & 3G Trouble Tickets.• Clearing and trouble-shooting all E// KPI.• Calculated the loads of Power in the site in order to change the Main AC Panel.• Upgraded RBS 6601 from W10 and W11 to W13 and W14.• Implemented Acceptance Process as per VFE Standard.• Perform Multi Band Integration for RBS 6000 with capacity of 24 TRX in one radio shelf.• Made Expansion for 1800 at RBS 6000.• Performed Installation and commissioning for E// TN 2P, 6P and 20P. Show less Afro-Egypt Roll-out Site Engineer /VFE Account • Working on Rollout project, VFE Account.• Installed 2G and 3G E// Cabinets (RBS 2206 V1, 2, RBS 3418, RBS 3518, RBS 3206, PBC 6500, PBC 02, TRM9206, TN 2P, 6P and 20P).• Integrate 900 (Site), 1800 (Co) and 2100 (3G) with integration team.• Use following Tools (Element Manager, OMT49, Mini Link Craft 2.15, WFTP, HyperTerminal).• Made Expansion for 1800 at RBS 6000.• Finished Acceptance Process as per VFE Standard.• Clearing and trouble-shooting all E// KPI. Show less

      • BTS Engineer

        Sept 2011 - May 2012
      • Microwave and Transmission Engineer

        Apr 2011 - Sept 2011
      • Roll-out Site Engineer

        Sept 2010 - Apr 2011
    • SIAE MICROELETTRONICA

      May 2012 - Apr 2013
      Site Engineer, Acceptance Controller and Project Coordinator

      SIAE , Site Engineer, Acceptance Controller, Coordinator / VFE Account (Pharotel Company).• Perform Indoor and outdoor HW Installations.• RSL Fine Tuning, Alignment, Commissioning.• Links Size 0.3, 0.6 and 1.2m, also configuration (1+0) and (1+1).• Swap from Ericsson and Huawei Links to SIAE Links.• Equipment (ALC +2E , ALC +2 , Modular , ALC+ , ALC+ Nodal )• SIAE TX Racks & DDU Installation.

    • Ericsson

      Apr 2013 - Aug 2016

      Hayat Communications, Senior Supervisor & Acceptance Controller/ Zain Bahrin• Worked as Senior Supervisor at B/M Projects :• TDD LTE Project.• Swap from Huawei Wimax to TDD LTE E///.• Make installation, commissioning, integration.• Finish all Acceptances as per Zain and Ericsson Standard.• Clear KPI alarms if found.• Use programs ( Element Manager , Filezilla , MOSHELL , WSFTP , Hyper Terminal , Putty , OMT )• Perform indoor and outdoor installation.• Perform all Civil actions needed ( Antenna , Feeder , Brackets , Earth System )• Use Site Master for measuring VSWR Limits for new sites.• Deal with Ericsson equipment (DUS41 01 , DUS41 02 , DUW31 , DUW30 , DUG 20 01 , DUW41 01 , RUS02 B0, RUS02 B1 , RUS02 B3, RUS02 B8 , RRU22 18 ).• Install Power units (SPD: Supply power distribution).• Deal with Huawei Equipment (DCDU, BBU3900, RRU38 04).• Perform installation as per SID “Site Installation Document” and update SID on SH “Site Handler “.• Prepare and submit all safety related documents as per company safety standard.• Manage safe workplace environment without risk to health• Perform dismantling process for old swapped equipment. Show less SKY Services Group, Senior Supervisor & Acceptance Controller / VFE Account• Worked as Senior Supervisor at B/M Projects :• Modernization (Swap from 2000 & 3000 to 6000 Families).• Roll-Out (2000 & 6000 Ericsson Families).• IP-RAN.• 2G Expansion.• HSPA.• NEW 3G.• 3G Expansions, 2nd Carrier, 3rd Carrier, E1 Expansion.• U900 (UMTS900).• TRM (2P, 6P, 20P with release 3, 4 and 5).• MBC “Multi Band Conversion to Dual Band Conversion “.• Multi Band Ret on all E// 3G Cabinets (3418 , 3518 , 6601 )• Very experienced with Ericsson Tools (SRS “Smart Rollout Support “SL, “Smart Laptop”, SID “Site Installation Document”). Show less

      • Senior Supervisor

        May 2016 - Aug 2016
      • Senior Supervisor & Acceptance Controller

        Apr 2013 - Apr 2016
  • Licenses & Certifications

    • First Aid and CPR Course

      Partner Success
      May 2014