
Muhammad Gamal
Site Architect

Connect with Muhammad Gamal to Send Message
Connect
Connect with Muhammad Gamal to Send Message
ConnectTimeline
About me
Construction Manager, Architect, Project Management, Sources Analyst, Interior Designer,
Education

Faculty of Engineering, Alexandria University
2000 - 2004Bachelor's degree Science of ArchitectureBachelor(BSc/BA), GPA Good, Excellence grade for graduation project.
Experience

Project Department – Egyptian Armed Forces
Jul 2005 - Dec 2006Site ArchitectBorg El Arab Olympic StadiumCommissioned in the Mediterranean Sea Resort.The largest stadium in the country and second largest in Africa after FNB stadium at Johannesburg.It is used in rotation with other stadium as the home venue of the Egyptian National Football Team with a 86,000 capacity.145 feddans, 3km long fence, 6km long internal road network, 5.2k vehicles parking capacity.Airstrip,136 electronic entrances.The main cabin is covered by an umbrella which covered 35% of the stadium total area, 12000 sq.ms area.It features two training pitches and a running tracks, and its facilities for spectators include 32 restaurants, a hotel, a building which contains 300 presses and cabinets for broadcasters.Main Responsibilities.Main Stadium establishment.Supervision for concrete works, the main super structure for the western stadium wing above 132 piles with approximately 38 m length average, locating the scaffolding bases of the formwork as per an approved shop drawing for each structural section..Precast units fixing for the main upper steps between the lower level (–14.30) up to the middle one (+3.30) with 70 ms width, for 2100 sq ms, supervision for formwork system installation for a 70% of the VIP Cabinet area..Training pitches and running tracks..Supervision for excavation, dewatering, following up soil reporting, regarding to the critical case of the unstable soil at this location,.Coordination between work elements and technical office, reporting for progress and time schedule..Estimating & cost control management; works including updating of the construction schedule, claims & analyses, preparation of quantity take-offs,payment invoices and reporting & presentation to the owner and consultant, following up as scheduled planning,.ID drawings coordination, MEP drawings coordination,structural drawings coordination. Shop drawing coordination, landscape drawings coordination,constructive details approval. Show less

United Investors Group (UNIVEST)
Mar 2007 - Dec 2007Architectural Designer.Private Villas – Cairo – EgyptMain Responsibilities.Concept and Diagrams, Site plan, Ground plans, Elevations..Sections, Model, 3D Model AutoCad, Perspective 3DMax + Photoshop..Supervision of different construction and contract administration works of theresidential villas..Preparation of tender documents for several contractors as well as thepreparation of their contracts..Supervision of the construction tasks excavation and axes placing, concreteworks and different finishing works. Show less

Concept Group
Jan 2008 - Mar 2008Architectural Designer.Cairo International Scout Center – Cairo – EgyptMain Responsibility.Coordination with structural, MEP, ID, and landscape..Façade redesign, constructive details..Supervision of finishing works, repairing & re-fixation for all decoration elementsas an interior finishing items.
.webp)
Saudi Binladin Group (SBG)
Apr 2008 - Dec 2011Main Project.King Saud University for Health & Sciences – Riyadh – K.S.A.A public university as the first university in the kingdom.It was designed by HOK Architects, headquartered in St. Louis, Missouri.Mechanical & Electrical system were designed by Syska Hennessy Group, Inc.New York.The facility was constructed in 1980s by Blount international, a construction firmled by Winton M. Blount headquartered in Montgomery, Alabama after the firmwas awarded the world's then-largest fixed price contract in history for the sumof approximately $5 billion.Main Responsibilities.Supervision of different construction and contract administration works of themulti-levels car parking..Preparation of tender documents for several contractors as well as thepreparation of their contracts..Supervision of the construction tasks including concrete casting, foundation,super structure, and steel works.. Supervision of special works like epoxy repairing, fire sealant fixing, flooringself leveling and fire rated elements installation..Coordination of constructing of architectural, MEP and civil works. Show less Main Project.Princess Noura University (PNU)A public women's university, the largest university for women in the world.It has over 60,000 students in 34 college and more than 5,000 academic andadministrative staff.It was constructed in a record time of two years, supported by 75,000construction workers.The largest building machinery and methodologies. It is 8 million sq ms in size.The campus has 600 high-tech, smart buildings, large-capacity studentdormitories, various models of faculty residence units, and three spacious,state-of-the-art recreation centers.It has pre-schools, primary schools, intermediate and secondary school.It also has an elegant central library, research centers, a university hospital,student support centers, sport facilities, convention center and an automatedmetro system.Sustainable design, as the water recycling plant, solar thermal plant, 4000 sqms of Solar Panels, which provide 16% of heating and 18% of air conditioningneed.Main Responsibilities.Supervision of different construction and contract administration works of thecommercial-residential building.Preparation of tender documents for several contractors as well as thepreparation of their contracts..Supervision of the construction tasks including concrete casting, pile works,excavation and axes placing..Coordination of constructing of swimming pools between architectural, MEPand civil works. Show less Main Project.King Abdulaziz International Airport - Hajj TerminalAn aviation facility located 19 km to the north of Jeddah.Named after King Abdulaziz Al Saud and inaugurated in 1981.The airport is the busiest airport of Saudi Arabia and is third largest airport in thekingdom the airport is known for its Hajj terminal.It can handle 80 000 passengers at the same time.Main Responsibilities.Handled coordination between different types of ceiling nets (fire fighting, firealarm, plumbing, AC network).. Handled the decorative work of the public areas (main entrance facilities,waiting areas).. Project management works including updating of the construction schedule &disputes analyses, preparation of quantity take-offs, payment invoices andreporting & presentation to the owner and consultant. Show less .King Abdullah University for Science & Technology( KAUST)A graduate research university of science & technology renowned by globalbenchmarks.Located on the Red Sea at Thuwal, is sited on more than 36 sq km,encompassing a marine sanctuary and research facility.Designed by international architecture firm HOK, it was also chosen by theAmerican Institute of Architect (AIA), Committee on the Environment (COTE),as one of the 2010 top Ten Green Projects.The university library received the 2011 AIA/ALA Library Capital Award foraccomplishments in library architecture.Research institutions in the kingdom and the region will link to the university'ssupercomputer and other laboratory facilities throw the 10 gigabits per second(Gbps) Saudi Arabia Advanced Research and Education Network (SAREN).KAUST students, faculty and staff live in one of three residential areas, Areasof community activity include Discovery Square, multiple gym facilities, librariesand coffee shops. Discovery Square includes a movie theater, a grocery storeand several restaurants.Main Responsibilities.Supervision of the finishing works of the residential apartments..Supervision of the different construction works of the five star villas..Handled and completed site jobs including finishing works like masonry works,gypsum work electrical and HVAC works, plastering, marble & granite works,steel finishing works, wooden works, flooring and escalators erection..Supervision of precast panels works for façade all over 192 separated villasand 62 apartment house..Supervision of precast concrete blocks installation at Beacon (the 60 ms hightower is a honeycomb obelisk built from precast concrete blocks).Project management works including updating of the construction schedule,claims & disputes analyses, preparation of quantity take-offs, payment invoicesand reporting & presentation to the consultant. Show less
Site Architect
Apr 2008 - Dec 2011Site Architect
Apr 2010 - Mar 2011Site Architect
Sept 2009 - Mar 2010Site Architect
Apr 2008 - Aug 2009

Haramain Gate
Mar 2012 - Nov 2012Site Manager.HGC Warehouse & Housing – Bahra – K.S.A. Mar.2012 – Nov.2012 • Redesigned accommodation's compound layout. • Security fencing and control access design. • Landscape and infrastructure design. • Design and distribution of landscape features. • Design of road layouts as per Saudi RTA regulation.

Dorra Group
Dec 2012 - Apr 2014Construction Manager. Saudi Arabian National Guard Housing Complex – Yanbu – K.S.A. The project involved construction of a housing complex offering 17,200 residential villas all over the Kingdom of SA. Including 750 villas at Yanbu, each comprising a ground floor and an additional floor. The project is also consist of infrastructure works, landscaping works, schools, mosques and health facilities. The cost of the project SR 1,8 billion. Responsibility • Supervision of different construction and contract administration works of the project. • Preparation of a project monthly report. • Coordination work between all elements like mechanical, civil and electrical works.• Attending site meetings with different departments. Show less
.webp)
Saudi Binladin Group (SBG)
May 2014 - Sept 2016Construction ManagerConstruction management.Main ProjectHoly Mosque ExpansionThe project started in August 2011, to expand the area of the mosque from356,000 sq ms to 456,000 sq ms.A new gate was built together with two minarets, bringing their total to eleven.After completion the mosque will house over 2.5 million worshipers.It includes major components: the main expansion building, Mas'aa expansionwhich has already been opened and the expansion of the circumambulationpath, the external parks, flyovers, stairs, complex of central service building,service tunnels, security buildings, the hospital, pedestrian-use tunnel,transportation station, bridges leading to the mosque, first ring road surroundingthe holy mosque area, and the infrastructure which includes power station,water reservoir and flood drainage system.The cost of the project $10.6 billion.Main Responsibilities. Supervision of different construction and contract administration works of theexpansion building.. Supervision of the construction tasks including concrete works and differentfinishing works.. Project management works including updating of the construction schedule,claims & disputes analyses, preparation of quantity surveying, paymentinvoices, reporting & presentation to the owner and consultant. Show less

Haram Consult
Oct 2016 - Sept 2018. Consulate of General Republic Of IndonesiaThe project began in 2017, which is targeted by the Indonesian Government, to develop facilities, improve functionality and improve required services.The proposed new building was designed in Jeddah, with a total area of about 3500 square meters and a total of 4 floors.It includes the main components: the main entrance hall, meeting rooms, public reception halls, staff offices, prayer rooms, public administration offices, departmental offices, public building services, and horizontal and vertical communication elements.Responsibility•Supervision of different designing and contract administration works of the project building. •Supervision of the coordination tasks including architectural works and different finishing works. •Project management works including updating of the construction schedule, disputes analyses, preparation of quantity surveying, reporting & presentation to the owner Show less . Ministry of Islamic Affairs, Dawah & GuidanceThe project began in 2016, which is targeted by the state in its Vision 2030, to develop facilities, improve functionality and improve required services.The proposed new building was designed in Al-Naseem neighborhood, with a total area of about 16000 square meters and a total of 7 floors.it includes the main components: the main entrance hall, VIP lounges, meeting rooms, public reception halls, staff offices, prayer rooms, public administration offices, departmental offices, public building services, parking spaces, and horizontal and vertical communication elements, this design and the open office system facilitate the principle of smart buildings, which allows each employee to achieve the right environment through the ease of making modifications without prejudice to the general design of the building and without prejudice to its servicesThe cost of the project is 80 million riyals.Responsibility •Supervision of different designing and contract administration works of the project building. •Supervision of the coordination tasks including architectural works and different finishing works. •Project management works including updating of the construction schedule, disputes analyses, preparation of quantity surveying, reporting & presentation to the owner. Show less
Construction Manager
May 2017 - Sept 2018Construction Manager
Oct 2016 - Apr 2017
.webp)
Saudi Binladin Group (SBG)
Sept 2018 - nowConstruction Manager
Licenses & Certifications

Member
Egyptian Engineers AssociationOct 2004
Architectural Engineer
Saudi Council of Engineers | الهيئة السعودية للمهندسينMar 2008
Languages
- enEnglish
- arArabic
Recommendations

Pranay dixit
Product Manager || MBA Candidate at JMSB, Concordia UniversityMontreal, Quebec, Canada
Carmen martín martínez
Responsable de Operaciones en Frutos Secos HernandezMurcia, Región de Murcia, España
Matthieu eynard longuet
Lead Storage Engineer at Orange Business | Storage Network (SAN), Hitachi VSP, HPE 3PAR | IT ExpertRennes, Brittany, France
Irma radoncic
HR & Recruiting Specialist at Energy Infrastructure Partners AGZurich, Zurich, Switzerland
Demi griffin
Technical SupportSacramento, California, United States
Yulastriany bastari
Geologist Ore Quality SystemCentral Halmahera Regency, North Maluku, Indonesia
Kasper laursen
Produktionsplanlægger hos GRUNDFOSCentral Denmark Region, Denmark
Callie aguilar
Juvenile Justice Specialist, MN Department of Public Safety - Office of Justice ProgramsMinneapolis, Minnesota, United States
Nitee kulkarni
MBA, Welingkar Institute of Management 2022-24Navi Mumbai, Maharashtra, India
Mohamed n.
Software Developer | Software Quality AssuranceDenver Metropolitan Area
Priya pahwa
Project Engineer at CDAC,NoidaUttar Pradesh, India
闫昭
总经理助理Jing'an District, Shanghai, China
Natalie santini
Content Creator | Beauty & Lifestyle Influencer | Cornell Certified Entrepreneur | Gen Z VoiceNew York, New York, United States
Zeinab mostafa,internal audit ,cia , erm ,grc,mlro,
Compliance Manager at SALAMA Islamic Arab Insurance UAEDubai, United Arab Emirates
Marleen janssen
Student aan Breda University of Applied SciencesArnhem-Nijmegen Region
Caio cunha
Corretor de Seguros / Personal BankerGaropaba, Santa Catarina, Brazil
Antoine sevrain
Director in Group Integration at UBSZurich, Zurich, Switzerland
Shivanee salvi-mayekar
Human Resources Business Partner @ Neptune UbicomPune, Maharashtra, India
Lee hinton
Studio Manager and technical designer @ SGK GraphicsWitham, England, United Kingdom
Luis alberto lopez rivera
Director de la Oficina de Monitoreo y Evaluación de ImpactoPeru
...