Balakrishnamurthy Golla

Balakrishnamurthy Golla

Junior Engineer

Followers of Balakrishnamurthy Golla413 followers
location of Balakrishnamurthy GollaKurnool, Andhra Pradesh, India

Connect with Balakrishnamurthy Golla to Send Message

Connect

Connect with Balakrishnamurthy Golla to Send Message

Connect
  • Timeline

  • About me

    Project Manager at Sigma rail system Pvt.Ltd

  • Education

    • Government of Andhra Pradesh ITI

      2005 -
      A
    • Board of Secondary Education. AP

      2003 -
      B
    • Janardan Rai Nagar Rajasthan Vidyapeeth University

      2010 -
      B
  • Experience

    • RailTel Corporation of India Ltd

      Jun 2011 - Feb 2013
      Junior Engineer

      Maintained OFC Cable Twin cities Secunderabad and Hyderabad project working as a JE(S&T) in the Year Jun-2011 to Feb-2013.Ducting, Backfilling, DIT, chamber erection, Route marker erection planning and OFC cable Route monitoring work, Optical fiber splicing and OTDR testing, Responsible for configuring and installation of SDH equipment (Tejas & fibcom) Trouble shooting of SDH equipment (Tejas & fibcom)

    • Rail Vikas Nigam Limited

      Dec 2013 - Aug 2022

      Projects:1. Successfully Commissioned 7 Stations with Medha Electronic Interlocking System in Madurai Junction to Tuticorin Doubling line project with Madurai as Head Quarters for the section Working as a AM(S&T) in the Year Mar-2019 to Jun-2021. 2.Successfully Commissioned 3 Stations 3 rd Line Work With Kyosan Electronic interlocking in Titlagarh,Kesinga and Rupra Road Stations with Titlagarh as Head Quarters in the station Working as a AM(S&T) in the Year Jun-2021 to Aug-2022.Design & Verification of SIP, Table of Control, Interlocking circuits, Interface circuits, Route. Preparation of Table of Control 10 stations and approved Indian railways.Performing SAT (Site acceptance test), FAT (factory acceptance test) for SSI Software.Vital and Non-vital inputs and outputs bits Verification, and System Configurations.Verification for TSAA documents. Show less Projects:1.Successfully Commissioned 6 Stations with Kyosan Electronic Interlocking System in Ponmalai Golden Rock to Thanjavur Junction Doubling line project with Tiruchirappalli as Head Quarters for the section as a APE (S&T) in the Year Jan-2015 to Mar-2019,2.Successfully Commissioned 8 Stations with Medha Electronic Interlocking System in Tiruchirappalli to Dindigul Junction Doubling line project with Tiruchirappalli as Head Quarters for the section as a APE(S&T) in the Year Jan-2015 to Mar-2019.Design & Verification of SIP, Table of Control, Interlocking circuits, Interface circuits, Route sectionVital and Non-vital inputs and outputs bits Verification, and System Configuration checking.Verification of Track bonding plans, Cable courage planes, Cable Route plans, Data logger particulars of SSI interlocked stations. Responsible In Charge of Electronic Interlocking Installation, Testing and Commissioning under Sr.DGM/ S&T/TPJ and AGM S&T Chennai, RVNL. As per site requirements alteration of circuits, and interlocking circuits (indoor, outdoor) wire to wire testing. Supervising execution of Signal & Telecommunication works being carried out by contractor as per specification and standards. Planning, Installation and Testing of IPS (Integrated Power Supply) at various stations. Show less Projects:Successfully Commissioned 7 Stations with SIEMENS Electronic Interlocking System in Ariyalur to Valdai Doubling line project with Ariyalur as Head Quarters for the section as a JSE(S&T) in the Year December-2013 to Jan-2015,Responsible for maintaining all S&T documents of project.Responsible for Maintenance of time Schedule. Testing of Interface circuits wiring Testing of the Interlocking of simulation panels designed before commissioning with reference of the Selection Table/Locking Tables. Testing of Signals and wiring, testing.Testing of Point machines and wiring, testing. esting of Track circuits and wiring, testing. Testing of Axle counter indoor and outdoor equipment fixing and wiring, correspondence testing. Show less

      • Assistant Manager

        Oct 2020 - Aug 2022
      • Asst Project Engineer

        Sept 2018 - Oct 2020
      • Junior site Engineer

        Dec 2013 - Sept 2018
    • Cyient

      Aug 2022 - Oct 2023
      IXL Application Engineer-Senior

      IXL Application Engineer-Senior, Ethihad rail for ERTMS Signalling System Scheme plan Verification with FAST’ RBC Tool Updated the interface designs asper the customer markup by using MicroStation preparation of CAD file.

    • HBL Power Systems Ltd.

      Nov 2023 - Jan 2024
      Assistant Manager
  • Licenses & Certifications

    • Trained and certified at INDIAN RAILWAY SIGNALLING AND TELECOMMUNICATIONS TRAINING CENTRE,PODANOOR

      Indian Railways