Paul Makar

Paul Makar

Senior method engineer Construction of NEW GREATER CAIRO METRO LINE 3

Followers of Paul Makar901 followers
location of Paul MakarUnited States

Connect with Paul Makar to Send Message

Connect

Connect with Paul Makar to Send Message

Connect
  • Timeline

  • About me

    Senior Estimator and Project Manager,

  • Education

    • South Valley University

      -
  • Experience

    • VINCI

      Nov 2004 - Feb 2008
      Senior method engineer Construction of NEW GREATER CAIRO METRO LINE 3

      Design and Create construction Methods for all Temporary and permanent works • Design and Create construction Methods for all Temporary and Permanent works (TBM shaft, Diaphragm walls, Struts, cut and cover, …)• Supervise and follow up the site work for all the construction methods work. • Preparing traffic diversions drawings.• Make calculations for design temporary steel structure formwork.• Preparing Quantity Surveying for the steel structure formwork which I designed. • Solving Technical problems that arose on site. Show less

    • Archirodon Construction (Overseas) Co. S.A

      Mar 2008 - Mar 2010
      Senior Project control engineer

      Responsibilities:-- Coordinator Engineer ,• Coordinate Structural drawings with Architectural, Mechanical, and Electrical drawings.• Making a perfect coordination with the designer of the chimney (stack=150 m height) and the consultant(with all its special materials concrete shell, Flue Linear bricks)• Solving Technical problems that arose on site.• Check and review (Civil, Arch, and Rebar) shop drawings for a team of draftsmen work.• Check and review quantity survey for the ordered quantity of reinforcement steel rebar.- Material and procurement Engineer, • Submit all the data and samples required for the consultant according to the Specification and Tender documents.• Revise the invoices for subcontractor (steel structure, Chimney works).• Making Technical Documents like RFI and FCR to the consultant and follow it. Monitoring the actual progress versus the planned schedule to achieve the required target with the required quality within the determined time Frame. Show less

    • Orascom Construction Industries (OCI)

      Mar 2010 - Apr 2020
      Estimation Team Leader

      Preparing Quantity Surveying needed for items to be analyzing.Reviewing project specifications and Bill of Quantities against drawings to ensure accuracy of all estimates produced.-Preparing estimates of probable costs of materials, labor and equipment for construction projects based on contract bids, drawings and specifications using current quotations, and historical information for final approval.Preparing estimates by assembling product requirements; calculating costs; applying margins to ensure that estimates addresses all potential safety risks and concerns. -Estimating all indirect cost for the Project.-Conduct site Visits to Bide Place to do site Surveys for actual Data ( labors, Materials and Equipment Rates) , Attend Pretender Meeting -Prepare commercial and technical bid proposal documentation to ensure all systems and components of the tender requirement.Projects:Water StructureNew Assuit Barrage project (with Budget of EGP 2 Billion) – EgyptKaruma Hydro-power Project (with Budget of USD 1.8 Billion) - UgandaNeckartal Dam Project (with Budget of USD 1.2 Billion) – NamibiaPower Plants Oil And GasFula Rapids Power Plant – South Soudan.South Helwan Supercritical power Plant – EgyptGE simple cycle power Plant – EgyptEl Zeit Wind Farm – Egypt Residential and commercial ProjectsEl Malabar Mixed High-Rises Project (St. Regis Hotel – Amman, Jordan).Alexandria University Hospital – Egypt.BP Iraq NV – Rumaila Headquarters - IraqIndustrial ProjectsUpgrading Mawanza Airport Project–TanzaniaNagarjuna Fertilizers Project - Koko- Nigeria Gabon Fertilizers Plant Project – GabonEgyptian Refinery Project - EgyptBazian Refinery Expansion- Iraq Marine works ProjectsAqaba LNG Terminal Project – JordanAdabeya Port Project – Egypt.Tunnel works ProjectsAbu Hamour Ground Water Drainage Tunnel-Qatar(Doha Metro) Rail Metro Train (Green Line) –Qatar Projects in :-Egypt. - Uganda –Tanzania- Iraq-Qatar-Jordan).- Gabon– Namibia Show less

  • Licenses & Certifications

    • Construction Estimating & Valuation CCS Candy

      Construction Computer Software (Pty) Ltd
      Sept 2014
      View certificate certificate
    • Associate Estimating Professional

      American Society of Professional Estimators
      May 2022