Amr Elbetany

Amr Elbetany

Site Mechanical Engineer and Technical Office Engineer

Followers of Amr Elbetany1000 followers
location of Amr ElbetanyRiyadh, Riyadh, Saudi Arabia

Connect with Amr Elbetany to Send Message

Connect

Connect with Amr Elbetany to Send Message

Connect
  • Timeline

  • About me

    Project Manager Infrastructure Development Expert | Utilities | PMO-CP®

  • Education

    • - Banha University, EGYPT

      2000 - 2006
      Bachelor of Engineering, Mechanical Power, (Good GRAD). Mechanical Engineering
  • Experience

    • Misr Company for Mechanical and Electrical

      Jul 2007 - Jul 2010
      Site Mechanical Engineer and Technical Office Engineer

      • Contributed to the ELatf Power Plant and Side Krar Power Plant projects, reviewing design documents, monitoring progress, and coordinating with vendors.• Review the Piping Design documents (P&ID, Isometrics, GA’s, Tie-ins list, Supports Details,).• Check the Material availability at site stock and the material replacements when required.• Review the piping activities and completion in accordance with schedule requirements.• Compilation of piping scope activity work packs including, drawings, method statements, sequences,manpower & equipment requirements, and project activity duration.• Identify the piping materials deficiencies affecting in successful activity completion.• Liaised closely with the materials procurement group to specify and instigate local and international materialspurchases Show less

    • SAUDI TAMPANE COMPANY LTd.

      Jul 2010 - Oct 2014
      Mechanical Superintendent

      • Managed Development of Infrastructure – phase 2 716–C02R Project, overseeing mechanical installation and construction activities.• Duties: Working as Mechanical superintendent.• Planning & Scheduling the Progress& targets to stipulate the workflow within the time frame.• Listening to various vendors as per contract to adhere to the material supply & installation on time withinthe time limit.• Manpower Handling, Planning & Distribution.• Erect piping network 12 km C.S Pipe, with four energy transfer stations and 40 valves chamber.• Installation of the Irrigation pump station.• Installation of PW, IRR, SAN, and STORM systems. Show less

    • AZMEEL INFRASTRUCTURE COMPANY

      Dec 2014 - Jun 2018
      Acting Project Manager

      • Projects: Development of Infrastructure• Managed the Al-Khafji New City Feeder Water Transmission System (KNOTS) project, focusing on construction management responsibilities.• Duties: Working as construction manager.• Planning & Scheduling the Progress & targets to stipulate the workflow within the time frame.• Listening with various vendors as per contract to adhere to the material supply & installation on-time flow.• Manpower Handling, Planning & Distribution.• erect piping line 10.8 km C.S Pipe cement lining DIA 900MM. Show less

    • The Petroleum Projects &Technical Consultations Co.ksa

      Jul 2020 - Dec 2020
      Construction Manager

      • Managed Steam Turbine Generators project at SHEDGUM GAS PLANT PROJECT (Client: ARAMCO), ensuring schedule and cost control.• Duties: managing the project team, and controlling the schedule and cost.• Establish structured schedules and project plans based on campaign and project goals, requiredresources, potential risks, deadlines, and budget.

    • China geo.engineering corporation(saudi)branch

      Jul 2020 - Jul 2021
      Project Manager

      • Oversaw the Development of Infrastructure EPC Sea water cooling pump station and pipe network Project. Duties: Integration between the design department and ensuring the information is shared.• Review the design and coordinate with the construction teams.

    • Binzafrah Contracting Co.

      Aug 2021 - Sept 2024
      Senior Project Manager

      • Duties: Led multiple projects for NEOM, including Zero Mass Grading Works, The Connector, Regional Infrastructure, Spine Infrastructure, and Outer Region.• Managed project teams, schedules, costs, and resources effectively to meet objectives.• Identified dependencies, threats, and solutions for optimal project delivery.• Establish structured schedules and project plans based on campaign and project goals, requiredresources, potential risks, deadlines, and budget• Able to understand project and campaign requirements to identify the optimal talent required to delivereffectively against set objectives, and to motivate project teams.• Identify of dependencies and possible threats to optimum project delivery and able to offer solutions.• Manage the internal delivery group, ensuring milestones are met, interdependencies are mapped, andrisks are highlighted.• Establish and manage the dashboard of projects, outlining team deliverables that are underway and anybacklog, and priorities according to the overall business objectives• Ensure projects stay within the budget, deadlines are met, and team members understand their rolesand associated deliverables• Lead on evaluation and reporting, ensuring senior stakeholders are updated on a regular basis.• Communicate project status and updates to teams internally on a regular basis Show less

    • Egis

      May 2024 - now
      Project Manager

      Project Manager with over 18 years of expertise in construction projects, specializing in infrastructure development, Uitilites, power plants, and district cooling systems. Adept at managing project teams, controlling schedules, and ensuring projects stay within budget. Seeking opportunities in innovative projects.

  • Licenses & Certifications