M. SENTHIL MURUGAN B.E , PMP®, CMRP

M. SENTHIL MURUGAN B.E , PMP®, CMRP

TURBINE ENGINEER

Followers of M. SENTHIL MURUGAN B.E , PMP®, CMRP342 followers
location of M. SENTHIL MURUGAN B.E , PMP®, CMRPAl Khor and Al Thakhira, Qatar

Connect with M. SENTHIL MURUGAN B.E , PMP®, CMRP to Send Message

Connect

Connect with M. SENTHIL MURUGAN B.E , PMP®, CMRP to Send Message

Connect
  • Timeline

  • About me

    Senior Mechanical Engineer having 16 years Experience in Installation, commissioning , Reliability of Steam turbine, Gas turbine, Boilers, Gas Compressor, Pumps & Static Equipment's in Oil & Gas, Power plant projects.

  • Education

    • Modern Matric higher secondary school

      -
    • Annamalai University

      2003 - 2007
      Bachelor of Engineering - BE 72.6%
  • Experience

    • Shin Thermo Dynamic Engineering private limited

      Jul 2007 - May 2010
      TURBINE ENGINEER

      ERECTION & COMMISSIONING OF HIGH PRESSURE MULTI STAGE STEAM TURBINE,GEAR BOX, GENERATOR & ITS AUXILIARIES.

    • Thermax Limited

      Jun 2010 - Dec 2011
      Rotary & Piping Engineer

      Erection & commissioning of steam turbine,ACC, Waste heat recovery boiler, BOP & piping in thermal power plants.

    • Ruba Power Technologies

      Jan 2012 - Dec 2014
      Mechanical Engineer

      Erection & Commissioning of Steam / Gas turbine, Pulverized Coal mills,Air cooled condenser,Pumps, Air screw Compressor, HP & LP Piping.

    • BGR Energy Systems

      Jan 2015 - Mar 2016
      Senior Mechanical Engineer

      Erection & Commissioning of Steam turbine and auxiliaries in thermal power plant.I had done the pre-commissioning & commissioning & Operation of 1050 TPH sub critical boiler, Pulverized coal mill, ID Fan, FD fan, PA fan, Air preheater, ESP, wet bottom ash & fly ash handling system, Soot blowers.I had done the commissioning of LDO & HFO oil forwarding pump station, auxiliary boiler,Air screw Compressor,CCW and OCW system, LP and HP heaters, Plate heat exchangers, CW pumps and General service pumps.I had done the Commissioning of steam Turbine(HP,IP & LP) , H2 cooled generator, stator cooling water system, surface condenser, CEP, HP and LP Bye pass control valve, Lube oil & seal oil system, Hydraulic oil and Governing system.I had done the commissioning of demin plant capacity of 130TPH consisting of MB,ACF,Degasser,SAC and SBA..I had done the commissioning of Forced draft cooling tower, Fan and Air cooled condenser. Show less

    • Samsung C&T, Engineering & Construction Americas

      Apr 2016 - Dec 2020
      Mechanical Project Engineer

      I have handled the Mechanical Erection & Commissioning of Siemens gas turbine SGT5-4000F, Steam turbine SST5-4000 & generator Sgen5-1200A in 2520 MW Umm Al Houl Combined cycle power plant at Qatar.

    • Medgulf Construction Co. WLL

      Jan 2021 - Feb 2025
      Senior Mechanical Engineer

      1. Handling Installation & Commissioning of sea water intake vertical pumps (45000 m3/hr), Rotary drum screen, Electro chlorination plant, Air compressor, Heat Exchangers , Filters , EOT crane , Load test and Piping.2. Prepared Method statement (MS) for Installation & Lifting plan as per QP standards.3. Prepared system & sub system mark up drawings for complete project as per QP procedure. 4. Prepared pre-commissioning procedure , check list for rotating equipments.5. Prepared commissioning procedure for rotating equipments (Pumps, Rotary drum screen, Filters, skid ,compressors)6. Prepared MCC dossiers for each sub system as per project approved list. 7. Handling pre-commissioning of sub systems.8. Authorized QP E-CPW permit receiver & CSF PTW receiver. Show less

  • Licenses & Certifications

    • Project Management Professional (PMP)

      Project Management Institute
    • Certified Maintenance and Reliability Professional (CMRP)

      SMRP
      Dec 2023