K. SUDHAKAR

K. SUDHAKAR

Electrical Technician

Followers of K. SUDHAKAR645 followers
location of K. SUDHAKARAd Dammām, Eastern, Saudi Arabia

Connect with K. SUDHAKAR to Send Message

Connect

Connect with K. SUDHAKAR to Send Message

Connect
  • Timeline

  • About me

    Sr. Supervisor @ MAETEL -Saudi Arabia Ltd (ACS Group- Spain)

  • Education

    • VPRS Institute of Technology & Science

      2013 - 2015
      DIploma Electrical and Electronics Engineering A
    • Y.M.C.A

      1994 - 1996
      Industrial Training Institute Industrial Engineering A
  • Experience

    • Durga Enterprise

      Oct 1996 - Dec 2001
      Electrical Technician

      ABB & L&T Indian Railway Projects worked at Madya Pradesh and West Bengal & Assam States.Cable Laying and Testing,Modification Works,Wiring as Schematic Drawing and Testing,Power & Control panel Erection and cable Wiring,Station control Room and Filed Motor Function Test,Pre - Commissioning Test,Track Signal,Interlock Test,Transformer and Switch Gear Erection and Testing Ext..

    • Rezayat Group (National Contracting Company Ltd)

      May 2002 - Jun 2006
      Electrical Technician

      Engineering & Construction Works on Electrical Substation at Houfuf / Riyadh & Abaha,and Power Plant at Shedgum & Jubail and Gas Plant at Harad.380KV/220KV/110KV/66KV/33KV/11KV Substation Projects. Earthing Works around Substation,Cable Laying,Cable Tray Works.Circuit Breaker and Transformer Erection.Insulator and CT/VT and Dis-connector Switch & Earth Switch Installation.Control Room Panels, GIS Breaker,AC/DC Panels,13.8 KV Switch Gear,Communication Panels,Battery Charger Panels,Fire Fighting Panels,and Battery Bank Arrangement & Battery Charging,AHU Panels Erection and Related Cable Laying, Glanding and Wiring. Scope of Work at Site .Schematic Drawing Check,Electrical Testing Equipment's Usage, Pre-Commissioning Activities.Cable Megger,Continuity Test,Breaker Test,Busbar Protection Test,Transformer and Switch Gear Hi-Pot Test,Primary & Secondary Injection Test, Modification Works,carry out Work Permit and done job with Following Safety Precaution.Shutdown Projects at Harad Gas Plant & Jubal Amech Berry Power Plant and Shedgum Power Plant.Modification Works with Live Line.Panel Erection,Cable Laying and Testing Activities. Show less

    • Q-Con Engineering Company W.L.L

      Aug 2006 - Dec 2008
      Electrical Foreman

      Engineering & Contraction works on Electrical Substation & Chemical Plant in Qatar.440KV/220KV /110KV /66KV /33KV /11KV Transformer Erection Activities as Conservator Tank,Radiator & Fans,Oil Pipes from Main Transformer tank to Conservator, Bocozzul Relay,Breather(Silica gel),LV/ HV & Neutral Bushing and Electrical Cubical Panel. Oil Filtration of Transformer as Vacuuming and Filling the Oil & BDO Testing (Break Down Voltage) and Cabling Works. GIS ( Gas Insulated Circuit Breaker-SF6) Erection Activities as Main Chamber of Breaker,DS(Disconnector Switch) & ES( EarthSwitch),Busbar,Related Control Panel and Cable Laying.Control Panel,AC/DC Panel,13.8 KV Switch Gear Panel,Battery Charger Panel & Battery Bank ,Scada Panel,Communication Panel,Fire Fighting Panel,Ext.. in Control Room Building.Shutdown Project Work at Q- Chem (Qatar Chemical Plant- Meesaide)Testing Activities on Transformer & Switch Gear.Primery & Secondary Injection,Stability Test,CT Test, CT Saturation Test,Circuit Breaker Diogenes Test,Bus bar Protection Test,Relay Test and Cathode & Anode for Wall Protection job done in Drainage. Shutdown Job at KAARAAMAA WATER PLANT ( Meesaide)Power Cable Laying and Modification Work.Old Transformer dimensional and Erection new Transformer and Energize.Control and Relay Panel Installation and cable works in Control Room.Testing Activities as Transformer I-Pot Test,Bus bar Test,Primary & Secondary Test and Synchronized Test. Show less

    • Saudi Oger Ltd.

      May 2009 - Oct 2012
      Electrical Supervisor (KAUST - Jeddah)

      Maintenance of Electrical Utilities Low Voltage & Medium Voltage System.Annual Preventive Maintenance of Transformer & Switch gear,AC/DC panels and Distribution Panels.Villas,Gym,Fire Station,Hospital,Cinema Theater,schools,swimming pool,sewage water treatment plant,chiller plant,battery charger Control Room & warehouse,Laundry,Buildings and Street light Electrical Maintenance & Modification Works.Control and Metering Panels Cable Works.Cable and Electrical Panel Testing Activities as Cable Detector & Cable Megger ,Primary & Secondary Testing,CT Test Ext.. Show less

    • MAETEL

      Oct 2016 - now
      Site Supervisor

      SAFANIYA Gas Plant Project On Going Progress since 2019 Feb.(Aramco Project) 132/115 Kv GIS( Gas Insulated Circuit Breaker) Existing bay & New extension bay from Live Substation No:1 to Substation No:20 Transformer as T601/T602. Aramco Project SDHOP(South Dhahran Home Ownership) S/S #1B & S/S# 1A & S/S# 2 (115/13.8 kV Substation) SEC Contract No:4400006084/4400006082/4400006083. As Site Supervisor of the above 3 GIS Substation Projects under National Gird (NG - Saudi Electricity Company) .1A & 1B Substation Successfully energized. Follow Electrical Drawings while going on Construction work as HV & LV Cable Sleeves & Duct Bank for Power Transformer and GIS (Gas Insulated Circuit Breaker) & Switchgear (Vacuum Circuit Breaker) Control Panels, Battery Room, Station Service Transformer, Capacitor Bank, Fire Fighting, Fire Alarm, HVAC, Lighting Panels, Telecommunication, SAS ( Station Automatic System) Ext.. ILJIN Transformer(Korea),115Kv/13.8Kv(67MVA) Transformer Installation Start From Radiator( Coil Fins), Cooling Fan, Conservator Tank, HV Busing, LV Busing,& Neutral Busing, and Oil Pipes through busing to conservator & OLTC ( ON Load Tap Changer), Lighting Arrester, Ext.. Start Vacuum and Oil Filtration above 70 C. BDV (Break Down Voltage) Test, Ext..HYUNDAI GIS (Korea),115Kv/40KA Install Main GIS Bay, Disconnector Switch, Earth Switch,3 position Switch, GIB, Cable Duct, VTs, Supports, bus coupler & line bay connection as 1A & 1 B and 2A & 2B both sides, GIB Busing, GIB Busing to Transformer Connection. piping for SF6 Gas Monitor Gauge. Conducting for SF6 Gage & PDMS ) sensor and cabling. Vacuuming and SF6 Gas Filling(Sulfur Hexafluoride), earthing for all equipment, Surge Arrester counter and cable to main earth grid & other requirement Activities. ALFANAR 13.8Kv SWITCH GEAR Installation of Switchgear panel as sequence line A/B/C and Bus Coupler/VT/Incomer/Bus TIE/Bus Bar Link Connection/Earthing Show less

  • Licenses & Certifications

    • Electrical Technician Certification

      Saudi Council of Engineers
      Sept 2019
    • National Grid Safety Rules, Qualification and Authorization

      Saudi Electric Services Polytechnic
      Mar 2024
    • Basic Fire Fighting

      Saudi Electric Services Polytechnic
      Mar 2024
    • OHS General Induction

      Saudi Electric Services Polytechnic
      Mar 2024