Tamer Mikkawy, PMP

Tamer mikkawy, pmp

bookmark on deepenrich
location of Tamer Mikkawy, PMPCork, County Cork, Ireland
Phone number of Tamer Mikkawy, PMP+91 xxxx xxxxx
Followers of Tamer Mikkawy, PMP1000 followers
  • Timeline

    Sept 2008 - Nov 2009

    Technical & Sales Engineer

    United Engineers for Electric Supplies
    Nov 2009 - May 2012

    DCS Engineer

    Power System Projects El-Sewedy
    May 2012 - Aug 2022

    Senior Project Application Engineer - DCS

    Schneider Electric
    Current Company
    Oct 2022 - now

    Senior Process Automation (DCS) Engineer

    Eli Lilly and Company
  • About me

    Dynamic, committed, results-focused Project Application Engineer skilled in Automation design for Pharmaceuical, Power and Oil & Gas projects.

  • Education

    • Badr language school

      -
      High education
    • Helwan university cairo

      -
      Bachelor degree of engineering electrical engineering
  • Experience

    • United engineers for electric supplies

      Sept 2008 - Nov 2009
      Technical & sales engineer

      I used extensive knowledge of electrical engineering to assess customer’s technical needs (including site surveys), explain details about technical solutions, and assist in the development of new products and services. I met with existing and potential customers to determine requirements and create proposals, prepare sales documents, and negotiate contract terms. I provided post-sales support for customers to discuss and troubleshoot problems with recently purchased product or service. I discussed product enhancements and new product development and suggested ways to enhance technical products and services.★ I designed various electrical, power, mechanical, and control systems to fully meet customer needs. Show less

    • Power system projects el-sewedy

      Nov 2009 - May 2012
      Dcs engineer

      I carried out DCS engineering and project management, including project scoping, engineering, specifications, criteria, requisition, evaluation, and selection. I reviewed and monitored materials, cost, estimate, schedules, progress reports, and staffing. I participated in activities associated with equipment and material procurement as well as FAT, IFAT (Instrument Factory Acceptance Test), SAT, commissioning, and start-up. I made independent recommendations regarding solutions to problems of varying complexity in accordance with organization and project objectives and guidelines.★ I produced basic and detailed engineering design and hardware design and documentation as per customer specification.★ I conducted process graphic displays and mapping systems and internal testing (process simulation) to agreed procedures. Show less

    • Schneider electric

      May 2012 - Aug 2022
      Senior project application engineer - dcs

      I lead hardware and software solutions throughout all the stages of projects and all inherent tasks, including customer clarification meetings. I introduce initiatives to raise product quality and implemented improvement measures with view toward minimizing non-compliance costs and ensure compliance with all standards. I prioritised site workload activities to meet business needs and customer requirements. ★ I acted as Team Leader for a project previously rejected by customer to reengineer solutions within a short time frame to find strategy to fulfil customer requirements – I led a successful test with the client and acceptance with zero reservations.★ I design hardware as per customer specifications and provide required documents and drawings for system design, system architecture, cabinet layout, power distribution, power calculations, heat dissipation calculations, wiring database and drawing, I/O segregation rules, FAT (Factory Acceptance Test) procedure, and SAT (Site Acceptance Test) procedure.★ I lead execution of Pre-FAT and FAT activities, as well as Integrated FAT activities by establishing communication with Third Party Systems.★ I lead execution of SAT, commissioning, and start-up activities, including cabinet installation, pre-power up, grounding, loop, and functional logic checks, and as-built drawing preparation.★ I successfully executed increasingly complicated assignments and analysed and troubleshot complex technical issues to derive and implement necessary corrective actions.★ I carefully test, verify, and enhance complex Loops and sequence logics as per licensor design inputs or by reverse engineering. Show less

    • Eli lilly and company

      Oct 2022 - now
      Senior process automation (dcs) engineer

      Studying functional requirements and process control strategies for control systems in collaboration with Process Engineering.To define the testing requirements and supervise the internal testing according to the agreed procedures.Preparing the Test Cases.Maintain the validated state of the site control systems in line with Lilly quality standards including the development and execution of validation strategies and associated documentation.DCS Foxboro platform design, build, and configuration.Wonderware Historian configuration.Upgrading the AIM Historian to WW Historian.Developing migration protocols for the legacy Foxboro system.Segregating the current Foxboro mesh network.Foxboro platform software configuration (Alarm Display configuration, Environments Configuration, Access Levels setup).Testing of automation system functionality.Using automation to improve productivity, operational efficiency, and compliance.Developing backup scripts for the upgraded Foxboro system. Show less

  • Licenses & Certifications

    • Project management professional (pmp)

      Project management institute
      Sept 2020