Arista Putri Choryningtyas

Arista Putri Choryningtyas

Database Engineer

Followers of Arista Putri Choryningtyas404 followers
location of Arista Putri ChoryningtyasBalikpapan, East Kalimantan, Indonesia

Connect with Arista Putri Choryningtyas to Send Message

Connect

Connect with Arista Putri Choryningtyas to Send Message

Connect
  • Timeline

  • About me

    Integrity Facility , RBI engineer | Project based

  • Education

    • Institut Teknologi Sepuluh Nopember (ITS)

      2012 - 2016
      Bachelor's degree Mechanical Engineering Related Technologies/Technicians
  • Experience

    • Project team in collaboration with the Institute for Research and Community Service (LPPM)

      Dec 2013 - Sept 2016
      Database Engineer

      Collected and organized data for RBI database.Helpdesk for Reporting.

    • PT. Adiluhung Saranasegara Indonesia

      Jun 2014 - Jul 2014
      Student Intern

      Joined with system production, electrical and piping on the ship building.

    • PT Terminal LPG - OPSICO

      Jun 2015 - Jul 2015
      Student Intern

      Joined with Quality Control Department in the operation of an automatic control system.

    • PT Daya Radar Utama

      Mar 2017 - Jul 2018
      Piping System Engineer

      Design machine equipment for ship.Organized and prioritized work to complete assignments in a timely, efficient manner.Worked well independently and on a team to solve problems.Performed familirization of ship engine machine.

    • Trihasco Utama

      Jul 2018 - Sept 2020
      RBI Engineering

      Collected and organized data for RBI database.Identified issues corrosion based on nakey eye inspection and UT or RT inpection, analyzed information and calculation the corrosion rate.Developing a scheme of inspection based on knowledge of the risk of failure using guidance from standard API 580.Reported result of calculation and determine the next inspection of piping and pressure vessel.Notify client progress weekly to discuss that result or any cases.

    • Tunas Jaya Sanur

      Oct 2019 - May 2023
      Electrical Drafter

      Draft Fire alarm Installation scheme for all area. Draft Sound system Installation scheme all area. Composite Ceiling Electrical, Electronic and Fire Sprinkler all area.

    • Trihasco Utama

      Aug 2022 - Dec 2022
      RBI Engineering

      Collected and organized data for RBI database.Identified issues corrosion based on nakey eye inspection and UT or RT inpection, analyzed information and calculation the corrosion rate.Developing a scheme of inspection based on knowledge of the risk of failure using guidance from standard API 580.Reported result of calculation and determine the next inspection of piping and pressure vessel.Notify client progress weekly to discuss that result or any cases.

    • PT Aneka Patra Integritas

      Sept 2023 - Dec 2023
      RBI Engineering

      Collected and organized data for RBI database. Coordinate with internal team and client (PIC area). Verify supporting data for RBI assessment (e.g. process design, operation & production, inspection history, anomaly finding, etc.), perform risk assessment, and identify damage mechanism in each system/equipment. Determine inspection plan & method based on risk ranking of each equipment, according to standard API 580. Develop report of RBI assessment result. Regularly reporting work progress to client and addressing issues that need further discussion. Show less

    • PT Kilang Pertamina Internasional

      May 2024 - now

      Project : Risk Based Inspection (RBI) Analysis for PT. Kilang Pertamina InternationalScope area :Fuel Oil Complex II- Unit 012 - Unit 013- Unit 014Responsibility as RBI Engineer:Collected and organized data for RBI Piping, Pressure Vessel database. Verify supporting data for RBI assessment (e.g. process design, operation & production, inspection history, anomaly finding, etc.), perform risk assessment, and identify damage mechanism in each system/equipment. Reviewing all the maintenance and inspection reports (i.e. inspection location, nature & criticality of flaw, thickness measurement etc.), repair reports, and modification reports.Reviewing and updating the damage rate i.e. expert / calculated / measured corrosion rate based on previous inspection records.Reviewing and updating the consequence data i.e. equipment cost, injury cost, outage cost, and population density based on the latest available data.Evergreening Risk based inspection based on data PSR 2024 using synergy plant onshore software.Run assessment data on Synergy Software. Show less Project : Risk Based Inspection (RBI) Analysis for PT. Kilang Pertamina InternationalArea :HCC PlantUnit 1 (Crude Distillation Unit IV)Unit 4 (Naptha Hydrotreater)Unit 5 & 6 (Platforming & LPG Treater)HSC PlantUnit 2 (Heavy Vacuum Unit II)Unit 3A, 3B & 3C (Hydrocracking unit A,B & C)Unit 8A, 8B & 8C (Hydrogen plant unit A,B & C)Diswax PlantPlant 201 (Crude Distilation Unit V)Plant 202 (Heavy Vacuum Unit III)Responsibility as RBI Engineer:Collected and organized data for RBI Piping, Pressure Vessel database. Verify supporting data for RBI assessment (e.g. process design, operation & production, inspection history, anomaly finding, etc.), perform risk assessment, and identify damage mechanism in each system/equipment. Reviewing all the maintenance and inspection reports (i.e. inspection location, nature & criticality of flaw, thickness measurement etc.), repair reports, and modification reports.Reviewing and updating the damage rate i.e. expert / calculated / measured corrosion rate based on previous inspection records.Reviewing and updating the consequence data i.e. equipment cost, injury cost, outage cost, and population density based on the latest available data.Evergreening Risk based inspection based on data PSR 2024 using synergy plant onshore software.Run assessment data on Synergy Software. Evaluate high risk of asset from result of Simulation synergy plant onshore software. Determine inspection plan.Coordinate with the other department like Reliability Department to determine schedule of inspection plan based on synergy plant analysis.Presentation result of evergreening study Risk-Based Inspection.Responsibility as Support Corrosion Engineer :Determine schedule of inspection Corrosion Under Insulation using priority range operation temperature and checklist visual inspection refer to standard API 580 and 583.Analysis result of visual inspection.Presentation result of Corrosion Under Insulation inspection. Show less

      • RBI Engineer

        May 2025 - now
      • RBI Engineer

        May 2024 - Apr 2025
    • PT Aneka Patra Integritas

      Aug 2024 - Oct 2024
      RBI Engineering

      Project : re-certification asset ISBL and TLI area on Trans-Pacific Petrochemical Indotama - PertaminaAs : Team Lead Assessment Remaining Life of Pressure VesselDevelop Spreadsheet calculation of minimum required thickness tube of air cooled based on API 530 for calculating residual life assessment of tube bundling area straight and U tube.Draft Timeline for team PV assessmentCollected and recheck data for RBI database. Coordinate with internal team and client (PIC area). As RBI Engineer :Verify supporting data for RBI assessment (e.g. process design, operation & production, inspection history, anomaly finding, etc.), perform risk assessment, and identify damage mechanism in each system/equipment. Determine inspection plan & method based on risk ranking of each equipment, according to standard API 580. Develop report of RBI assessment result. Regularly reporting work progress to client and addressing issues that need further discussion. Show less

    • PT Aneka Patra Integritas

      Jul 2025 - now
      RBI Engineer

      Project :Risk Based Inspection for Pipeline PT Pertamina Hulu RokanScope Area :North 8 10 GL 6 Equalizing Petani to Pematang (+/- 160 segmentation)Responsibility :Determine Consequence Area based on ASME 831.8SInput data Calculation :- Design & operation data, - Population density track based on Calculation consequence area and Google Earth.Set Up for segementation pipeline based on criteria :- Location on pipe (aboveground, underground, soil to water, road crossing)- Anomali finding- FenceDevelop resport RBI for pipeline Show less

  • Licenses & Certifications

    • Test Certificate

      LinkedIn
      Feb 2018
      View certificate certificate
    • API 580

      API - American Petroleum Institute
      Sept 2023
  • Honors & Awards

    • Awarded to Arista Putri Choryningtyas
      Bronze Medal for Indonesia Knowledge Management Submit 2024 PT Kilang Pertamina International, Indonesia Dec 2024 Bronze Medal for Indonesia Knowledge Management Submit 2024 on sub topic Knowledge Management : Efisiensi Metode Inspeksi Corrosion Under Insulation pada Column Berdasarkan Pemetaan Rentang Temperatur Operasi dan Profil Risiko Menggunakan Software Synergy Plant