Bittu Bawali

Bittu Bawali

Formmer Sr. Engineer-Quality

Followers of Bittu Bawali1000 followers
location of Bittu BawaliTrivandrum, Kerala, India

Connect with Bittu Bawali to Send Message

Connect

Connect with Bittu Bawali to Send Message

Connect
  • Timeline

  • About me

    Quality Manager at KELLER

  • Education

    • S.V.U

      2022 -
      Master of Technology - MTech Structural Engineering
    • I.C.E

      2010 - 2013
      A.M.I.C.E Civil Structural Engineering A+
    • W.B.S.C.T.E

      2007 - 2010
      D.C.E Civil Engineering A+
    • W.B.C.H.S.E

      2005 - 2007
      10+2 Science A
  • Experience

    • Gammon India Limited

      Apr 2010 - Sept 2015
      Formmer Sr. Engineer-Quality

      ***Construction of Viaduct including related works for 5.27 km. length including Station Building from Vip Bazar to Nicco Park for Kolkata Metro, RVNL in Kolkata.***New Brahmaputra Bridge Guwahati -1.493 Kms. / Existing Flyover & Roadways in Assam. # Well Foundation/ Caisson Foundation/ Pile Foundation.***Bogibeel Rail Cum Road Bridge -4.950 Kms. in Assam. # Well Foundation/Caisson Foundation.***GMR Chattisgarh Power Project -2x685 MW in Raipur. # RCC Twin Flue 275 mtr.Chimney & 165 mtr. NDCT. Show less

    • FCC Servicios Ciudadanos

      Oct 2015 - Oct 2017
      Former QA/QC Engineer at Riyadh Metro Alliance in Saudi Arabia

      # ADA awarded the design and construction contract of the Riyadh metro to three consortiums BACS, ANM and FAST, in August 2013.The BACS consortium includes Bechtel, Almabani General Contractors, Consolidated Contractors Company and Siemens. The consortium is led by Bechtel and will design and construct the metro lines 1 and 2. It will also be responsible for the train cars, signalling, electrification and integration of the lines to the metro network. The contract value is $9.4bn.ANM's $5.2bn contract includes construction of Line 3 of the metro, Qasr Al Hokom station and Western Station. The ArRiyadh New Mobility (ANM) consortium includes Ansaldo STS, Salini-Impregilo, Larsen & Toubro, Nesma and Bombardier. Larsen & Toubro and Nesma will provide civil works services, Bombardier will look after the procurement of the vehicles and Ansaldo STS will provide technology support services for the Line 3.Ansaldo STS will also provide signalling support services, automation train control (ATC) and communication-based train control (CBTC) and other telecommunication services. The contract value for Ansaldo STS is $680m with an option to add $249m for maintenance of Line 3 for the next ten years.Led by FCC Construccion, FAST received a $7.9bn contract to construct and design Lines 4, 5 and 6 of the metro. The consortium includes FCC Construccion, Samsung, Alstom, Strukton, Freyssinet Saudi Arabia, Typsa and Setec. The scope of contract includes construction of 64.6km of rail track, 29.8km of viaducts, 26.6km of underground track and 8.2km of overground track.Underground tunnels will be built with the help of three tunnel boring machines (TBM). The tunnels will have a 10m-diameter to facilitate the three metro lines. The $7.9bn will be financed through the Public Investment Fund of the Government of Saudi Arabia.L&T Construction won a $161.37m contract to design and construct ballastless tracks for Lines 1 and 2. Show less

    • Tata Projects

      Jan 2018 - Nov 2022
      Lead QA/QC-Manager at Kalinganagar Phase-II, Civil Works (CRM, HSM, SMS and BF Packages)

      http://www.tataprojects.com/TSK had conceived to produce 6.0 MTPA of crude steel in Kalinganagar Industrial complex, Odisha. Environmental Clearance for this project was accorded by Ministry of Environment Forest andlimate Change (MoEFCC) on 7th November 2006. Subsequently, on 10th October 2012, based on proposal by TSK, MoEFCC amended the above clearance due to reorientation of layout, changes/addition of units, and value addition by cold rolling of product. Phase-I of theintegrated steel plant for producing 3.0 MTPA crude steel is already commissioned.TSK is now planning to expand the plant for a total production of 8.0 MTPA crude steel, through increase in capacity of individual units and optimizing capacities in the existing plant site.The production plan of the proposed expansion is as follows:Crude Steel .. 8.00 MTPAHot Rolled Coils .. 7.00 MTPACold rolled products .. 2.20 MTPALong Products .. 2.00 MTPA(Bar, Wire Rod, Medium & Light,Structurals etc.) Show less

    • KELLER

      Nov 2022 - now
      Lead Quality Manager at Numaligarh Refinery Expansion Project ( DHT, SRB, O&U, RPTU, GDS, PFCC, HGU)

      NRL is executing a major expansion project of capacity augmentation from present 3.0 MMTPA to 9.0 MMTPA by installing a 6.0 MMTPA capacity refinery and associated crude oil terminals pipeline considering processing of Arab Light (AL) and Arab Heavy (AH) crude oil (AL:AH= 30:70). The required additional quantity of crude oil is planned to be imported through Paradip Port in Odisha A cross country pipeline of around 1640 Km shall be laid from Paradip Port to Numaligarh for transporting 9.0 MMTPA of imported crude. Show less

  • Licenses & Certifications

    • QA/QC of Deep Foundation Testing

      Deep Foundation India-DFI
      Nov 2024
      View certificate certificate
    • Certified Internal Auditor (CIA)_ ISO 9001:2015, ISO 14001:2015, ISO 45001:2018

      TQCert Services Privet Limited
      Mar 2021
      View certificate certificate
    • Associate Member of Indian Civil Engineers

      Indian Institute of Civil Engineering (I.C.E)
      Aug 2010
      View certificate certificate