
Md Nazmul Alam Khan
Electrical Engineer

Connect with Md Nazmul Alam Khan to Send Message
Connect
Connect with Md Nazmul Alam Khan to Send Message
ConnectTimeline
About me
Manager-Electrical || 718MW CCPP
Education

The Institution of Engineer's , Bangladesh
2009 - 2012BS.c in Electrical
SHYAMOLI IDEAL POLYTECHNIC INSTITUTE
2003 - 2007DIPLOMA IN ENGINEERING
Experience

Bonanza Group
Jan 2010 - May 2015Electrical Engineer1. Design, implement, maintain and improve electrical instruments, equipment, facilities, components, products and systems for commercial, industrial and domestic purposes.2. Operate computer-assisted engineering and design software and equipment to perform engineering tasks. Direct and coordinate manufacturing, construction, installation, maintenance, support, documentation and testing activities to ensure compliance with specifications, codes and customer requirements. 3. Perform detailed calculations to compute and establish manufacturing, construction, and installation standards and specifications. Inspect completed installations and observe operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards. 4. Monitor the ongoing projects to ensure conformance to design and equipment specifications and compliance with operational and safety standards. 4. Initiate a full-fledged electrical audit throughout the group to ensure the safety and compliance of the electrical setup. Show less

Maxinox Ltd. (A sister concern of Max Group)
Jun 2015 - Feb 2016Electrical Engineer1. 2000 KVA substation budgeting, installation and maintenance. 2. Different type of machines installation and maintenance such as SHEARING CUTTER MEDIUM TYPE, CIRCLE CUTTING MACHINE, DEEP DRAWING DOUBLE ACTIVE POWER PRESS, HYDRAULIC MACHINE, POWER PRESS, JURI CUTTING MACHINE, BOWL CUTTER, SCRAP BELLING MACHINE, SPNING MACHINE, EDGE ROLL MACHINE, BUFFING MOTOR (5HP-15, 7.5HP 35, 10HP 30), DRILL MACHINE, LATHE MACHINE, SHARER MACHINE, SURFACE GRINDER MACHINE, 60 KW BRAZING MACHINE, RIVETING MACHINE, POLLUTION PLANT, COOLING TOWER, WATER PURIFIER. 3. Fire protection system design and installation for 80000 SFT area as per rule of BNBC and NFPA. 4. 1600A BBT system erection, Testing and commissioning. Show less

KUSHIARA POWER COMPANY LIMITED, 163MW CCPP
Mar 2016 - Apr 20181. Making work schedule L-1, L-2, L-3 and L-4 for equipment erection and installation in 163 MW CCPP.2. LV (415V) and MV(6.6KV) switchgear installation, testing and commissioning. 3. Integration of all LV and MV switchgear with DCS (Mark VI e) and UCS (Mark VI e) system, where used different type of analog and digital I/O pack such as PDIA, PDOA, PHRA, PRTD, PTCC and PVIB. 4. Testing and commissioning of GEN and turbine jacking oil motor, main and standby lube oil motor (55kw), DC emergency motor (125VDC, 7.5 kw), HP control oil skids motors, vacuum motor(415v, 69kw)-2pcs, CW motor (6.6kv, 710kw) -2pcs, BFP motor (6.6kv, 1180kw)-2pcs, CEP motor (6.6kv, 315kw)-2pcs, ACW motor (415v, 210kw)-2pcs, DMCC motor (415, 200kw) -2pcs, and DM transfer motor, service water motor, Cooling tower motor-6pcs, High speed -low speed motor (75/20kw) etc.5. 15KV/230KV-150MVA-1pcs, 11KV/230KV-85MVA-1pcs, 6.6KV/15KV-14MVA-1pcs and 6.6KV/11KV-14MVA-1pcs, 0.415KV/6.6KV-1200KVA-2pcs and 0.415KV/6.6KV-1600KVA-4pcs Transformer erection, testing (SFRA, IR, ten-delta, turn ratio and winding resistance etc) and commissioning. 6. Erection, testing and commissioning for both Simple cycle and combined cycle of IPBD (15kv, 8000 AMP and 11kv, 5000 AMP), GT GCB (8000 AMP) AND ST GCB (5000 AMP), GLAC/LSC, GNAC/NSC, turning gear panel, DC motor starter panel etc. 7. 2 Pole, 85MVA, 11KV and 3000RPM generator testing and commissioning. 8. Installation, testing and commissioning of 6 CT fan motor (110kw) with VFD ( Model: ACS510, ABB). 9. Performed Cold loop check, Hot loop check and Functional check of LV MV switchgear from DCS, LPBS to LV MV switchgear and motors/devices. :::::::::::::::::::: Experience at I & C area ::::::::::::::::::::Control valve at ST area: Power up and Integration of 9 steam drain valves with UCS. Work with generator winding RTDs, water leakage detector. Show less 1. Making work schedule L-1, L-2, L-3 and L-4 for Simple cycle equipment erection and installation in 163 MW CCPP.2. Perform the Soil resistivity test by Wenner four-pin method (Fluke-1625-2) and install earthing mesh over the plant area (39254.5 sq. m) with steel 1020 at different two size 30x6mm and 50x6mm.3. LV (415V) - Unit service switch gear, station service switch gear, Emergency switch gear and MV (6.6KV) switch gear installation, testing and commissioning.3.1. Different sizes perforated and ladder type cable tray installation. 3.2. Power and control cable pulling and laying on tray, trench and cable duct by segregating signals as per cable schedule.4. Integration of all LV and MV switchgear with UCS (Mark VI e) system, where used different type of analog and digital I/O pack such as PDIA, PDOA, PHRA, PRTD, PTCC and PVIB. 5. Testing and commissioning of GEN and gas turbine jacking oil motor, main and standby lube oil motor (55kw), DC emergency motor (125VDC), , turning gear panel, DC motor starter panel etc. 6. 15KV/230KV-150MVA-1pcs, 11KV/230KV-85MVA-1pcs, 6.6KV/15KV-14MVA-1pcs and 6.6KV/11KV-14MVA-1pcs and 0.415KV/6.6KV-1600KVA-4pcs Transformer erection, testing (SFRA, IR, ten-delta, turn ratio and winding resistance etc) and commissioning. 7. Erection, testing and commissioning for Simple cycle of IPBD (15kv, 8000 AMP), GT GCB (8000 AMP), GLAC & GNAC ( Protection and measuring CT PT).8. Erection and commissioning of LPS, SPS with stroke counter.9. Aircraft lighting with UPS and crepuscular switch on top of main and bypass stack and air inlet duct.10. 2 Pole, 161MVA, 15KV and 3000RPM generator testing and commissioning. Show less
Assistant Manager, Electrical
Jan 2017 - Apr 2018Electrical Engineer
Mar 2016 - Dec 2016

Shapoorji Pallonji Group
May 2018 - Sept 2018DEPUTY MANAGER - ELECTRICALErection, testing and commissioning of Switchgear (LV-425V, MV-6.6 KV), GIS (230KV) , AIS (230KV), IPBD (11KV/11.5KV), Power transformers (98 MVA-02 and 110 MVA -01), Auxiliary transformers (14 MVA-02) , CW motors, ACW motors, CEP motors, BFP motors, Vacuum motors, WTP system, VFD, GLAC and GNAC, Alternator (GTG-74.595 MW-2 and STG-82.80 MW-01), GCB, GBC, Cold and hot loop checking, Individual and group functional checking from remote and local , Integration of electrical equipment with DCS/PLC etc. Show less

Paramount Btrac Energy Limited, 200MW HSD
Sept 2018 - Apr 20221. Ensure maximum generation of 200 MW plant, 2. Utilization of manpower/engineers and set SOPs for them, 3. Overall cost management of the plant, 4. Taking decision on critical situation on equipment as well as on administrative 5. Maintain proper liaison with local authority such as BPDB, PGCB, IPP Cell, Department of environment, DC office, Union parishod, police station etc., 6. Overall risk management of the plant, 7. Ensure hygiene, health, security and safety for around 165 employees and for equipment, 8. Preparing const effective and sustainable budget on monthly/yearly basis for the plant. 9. Overall operation of departments are a. Operation, b. Maintenance (Electrical & Mechanical), c. HR & Admin, d. Store, e. SCM, f. Finance, g. Bunkering, h. IT and i. Security. Show less 1. As per targeted date, making ready electrical, testing and commissioning work schedule ( L-1, L-2, L-3 and L-4) for 230KV equipment, MV and LV switchgear, etc of 200 MW HSD power plant.2. Performed the Soil resistivity test by Wenner four-pin method (Fluke-1625-2) and install earthing mesh over the plant area (40600 sq. m) with copper barred wire of different sizes.3. Installation, testing and commissioning of 230KV system ( 3 line bay and 6 transformer bay) at both PGCB and plant end.4. 11KV/230KV-55MVA-6 packages , 0.4KV/11KV-4.5MVA-66 packages and 0.4KV/11KV-2 MVA-3 packages and 0.4KV/11KV-0.5MVA-3 packages, Zigzag- 6 packages Transformer erection, testing (SFRA, IR, ten-delta, turn ratio and winding resistance etc) and commissioning. 5. Relay (MiCOM 543-2 packages, 642-12 packages, 746-1 packages, P127-8 packages, L90-2 packages) setting calculation for 21, 87T, 87L, 87N, 67/67N, 50/50N, 51/51N, 27, 59, 81, 24, 25 protections, testing and commissioning. 6. Installation, testing and commissioning of SCADA system. Integration of 230KV system, all LV and MV switchgear with SCADA (Brand: Schneider, RTU, BCU, Model: C264) system, where used different type of analog and digital signal.7. MV (11KV) and LV (0.4KV) switch gear installation, testing and commissioning. Relay coordination and Relay (7SR12) setting calculation for 50/51, 50N/51N, 67/50, 59N protections, testing and commissioning. 8. Power and control cable pulling and laying on tray, trench and cable duct by segregating signals as per standard. 9. Testing and commissioning of fuel system.10. Erection and commissioning of LPS, SPS with stroke counter. Show less
Plant In-Charge
Jun 2020 - Apr 2022Manager-Electrical
Sept 2018 - Jun 2020

Reliance Bangladesh LNG & Power Limited
Apr 2022 - nowManager-Electrical718MW CCPP
Licenses & Certifications
- View certificate

MTCNA - MikroTik Certified Network Associate
MikroTik SIAJan 2024 - View certificate

CCNA: Enterprise Networking, Security, and Automation
CiscoJun 2024 - View certificate

Cisco Certified Network Associate (CCNA)
Cisco Networking AcademySept 2024 - View certificate

MTCSE - MikroTik Certified Security Engineer
MIKROTIKLS SIAFeb 2024 - View certificate

CCNA: Switching, Routing, and Wireless Essentials
CiscoApr 2024 - View certificate

CCNA: Introduction to Networks
CiscoMar 2024 - View certificate

MTCRE - MikroTik Certified Routing Engineer
MIKROTIKLS SIAJan 2024 - View certificate

Verified International Academic Qualifications
World Education ServicesDec 2024
Languages
- enEnglish
- baBangla
- hiHindi
Recommendations

Swapnil walse
Co-founder Nouveausoft TechPune, Maharashtra, India
Ipotseng coodi
Student at University of South Africa/Universiteit van Suid-AfrikaNorthern Cape, South Africa
Hassan zubair
Senior Regional Sales Manager - Central Punjab at MondelezPakistan
Saksham bhayana
Senior Tech Lead at GS LabPune, Maharashtra, India
Alayna gallagher
Vintage Clothing Boutique OwnerPittsburgh, Pennsylvania, United States
Prabhat k.
Assistant Vice President, Manager-application security, Pen tester, Security specialist, security en...Bengaluru, Karnataka, India
Arigela pranay kumar
Student at Geethanjali College of Engineering and Technology | Administrator : GCTCPORTALHyderabad, Telangana, India
Anita saldana
Hypnotherapist | NLP Trainer | Life Coach | Specialized in trauma release.Las Vegas, Nevada, United States
Jake piefke
Partner Success Manager at AUS Information SystemsLawrenceville, Georgia, United States
Caio harder
Executivo de Contas na Coca-Cola FEMSAPiracicaba, São Paulo, Brazil
Mary joy allauigan
Accounting & Finance Associate | Certified Bookkeeper | ERP Accounts Payable SpecialistMandaluyong, National Capital Region, Philippines
Imran hussain
OS&E Business | Operations Management | Product Management | Production Management | [ M.Tech, MBA] ...Jeddah, Makkah, Saudi Arabia
Harald braun
Senior Development EngineerHockenheim, Baden-Württemberg, Germany
Puja patel, pharmd
Pharmacy Manager at WalgreensDallas, Texas, United States
Karsten p.
Management Finance around the CFO AgendaSolingen, North Rhine-Westphalia, Germany
Oumou naby diakhaté
Conception,Management, Suivi & Évaluation de projetDakar Region, Senegal
Ramsha khan
First IHRC Vice Chairwoman | Financial Advisor | DJ | Artist | Progressivist | Women EmpowermentAtlanta, Georgia, United States
Giorgio simoni
Libero professionista della scritturaPisa, Tuscany, Italy
Jordan m.
Territory Sales ManagerDenver Metropolitan Area
Ruben marin
Senior Product Manager - Tech Supply at BestSecretDüsseldorf, Nordrhein-Westfalen, Deutschland
...