Taufik Matoka

Taufik Matoka

Vice President

Followers of Taufik Matoka714 followers
location of Taufik MatokaIndonesia

Connect with Taufik Matoka to Send Message

Connect

Connect with Taufik Matoka to Send Message

Connect
  • Timeline

  • About me

    Drilling and Workover Engineer at Citic Seram Energy Ltd.

  • Education

    • Universitas Trisakti

      2008 - 2013
      Bachelor's degree Petroleum Engineering 3.32

      Activities and Societies: SPE, IATMI

  • Experience

    • Society of Petroleum Engineers Trisakti University Student Chapter

      Oct 2010 - Oct 2011
      Vice President
    • PetroChina International Bermuda Ltd.

      Jun 2011 - Aug 2011
      Field Practical Training

      Drilling Job, Production Job and Surface Facilities Job

    • PetroChina International Bermuda Ltd.

      May 2012 - Jul 2012
      Final Project

      Optimazitation Artificial Gas Lift in Jaya Field

    • PT. Epsindo Jaya Pratama

      May 2013 - Sept 2013
      Hydraulic Pumping Unit Engineer

      Scope of work :1. Design HPU Unit 2. Installing HPU unit3. Monitoring HPU Unit4. Analyzing Problem HPU5. Troubleshooting Problem HPU6. Optimazitation Production Well with HPUField Activity :1. 10 Mei 2013 - 25 Mei 2013Witness Operation in Pedada Area, Assign as Engineer with Design, Install, monitoring, troubleshooting HPU unit.

    • PetroChina International (Bermuda) Ltd.

      Oct 2013 - Dec 2015
      Production Engineer

      Scope of work :1. Supervise completion and workover activity and carry out analysis to recommend required immediate actions.2. Design and review completion, work over, optimization and pump installation program.3. Monitoring production daily report, geology and drilling daily report from drilling operation. 4. Work closely with other diciplines to ensure reservoir characterisaction and reserve calculation5. Make AFE (Apendix Fund Expenditure) Completion Well and Workover Well6. Monitor the daily progress of well operation and compare actual cost with cost expenditure proposal and recommend changes or improvements that could lead to expenditure optimization.7. Make the field development plan based on related data and ongoing activities in the field.8. Provide the production optimization program to improve and maintain the hydrocarbon production level.Field Activity :1. 15 November 2013 - 15 December 2013Witness Completion Exploration Well in Klagalo, Arar Block, Salawati, Papua.Assign as Supervise Completion and responsible to redesign completion of exploration well profile planning with actual.2. 16 December 2013 - 15 Januari 2014Witness Completion and well tesing in Klalin, Arar Block, Salawati, Papua.Assign as Supervise Completion and responsible to redesign completion of development well profile planning with the actual and record data well testing.3. 15 November 2014 - 25 November 2014Witness Drilling Activity in Klalin, Arar Block, Salawati, Papua.Assign as petroleum engineer and sharing with drilling supervisor about problem drilling and discussion with Jakarta Office. Show less

    • Petrogas (Basin) Ltd.

      Jan 2016 - Jun 2024
      Drilling and Workover Engineer

      Drilling Engineer :1.Involved to make Drilling Program 2 Depleted Development wells with underbalanced drilling chemical (LDA Mud)2.Involved to prepare and make all contract support service for Drilling3.Involved in daily rig operations including monitoring cost, Service company performance, mentoring third party and contract employees as Night Drilling Supervisor4.Make AFE (Apendix Fund Expenditure) Drilling Well and submit to SKK Migas.5.Prepare, make and discuss all technical Plan and operation justification about Drilling well program with SKK Migas.6.Make justification all activity Exploration Well and Development Well to SKK Migas on “Pelaporan Penyelesaian Sumur (PPP)” and then the wells ready to be Close Out.7.Make the field development plan based on related data and ongoing activities in the field.8.Leading safe team operations throughout drilling phases9.Drilled 2 Development Wells in Kepala Burung, Papua with depleted zone, very active clay. Show less

    • CITIC Seram Energy Limited

      Jul 2024 - now
      Drilling and Well Intervention Engineer
  • Licenses & Certifications

    • Advanced Well Completion & Workover

      Orca Cendekia
      Aug 2014
    • Indonesia Abandonment and Site Restoration

      AntaVaya Convex
      Apr 2014
    • Project Management Proffesional

      Project Management Institute
    • Wellsharp Drilling - Supervisor Level

      IADC Southeast Asia Chapter
      Feb 2019
      View certificate certificate