Ziad Ibrahim

Ziad Ibrahim

Head of Maintenance Department

Followers of Ziad Ibrahim1000 followers
location of Ziad IbrahimQatar

Connect with Ziad Ibrahim to Send Message

Connect

Connect with Ziad Ibrahim to Send Message

Connect
  • Timeline

  • About me

    Regional Director of Engineering

  • Education

    • Samara State Aerospace University

      2004 - 2010
      Master's degree Mechanical Engineering A
  • Experience

    • Hopital Sacre Coeur

      Jun 2010 - Nov 2012
      Head of Maintenance Department

      Maintenance Manager• Responsible of the following systems with a wide knowledge: Emergency Power (Generators, Synchro-panels), Water Treatment (Softeners, RO Plants, potable water), Chilled Water, Hot Water, Steam.• Conduct contractual agreements with external companies.• Schedule and perform preventive maintenance.• Managing all hospital projects and maintenance work in an efficient and cost effective manner ensuring conformity to Quality Standards and observing Environmental, Health and Safety Regulations.• Plan, schedule, communicate and assign tasks to the team and monitor to completion, ensuring conformance to specifications, standards and schedule of the requisitioning department.• Develop work designs that are easy for staff to understand and execute• Maintain optimum stock levels, ensuring all transactions are well document and records maintainedMain achievements: -Passed the Lebanese Accreditation of Hospitals with an A.- Full control on the maintenance team which is consisted of 9 technicians and two helpers. Show less

    • INCON

      Nov 2012 - Dec 2013
      Mechanical Engineer

      Project Mechanical Engineer- INCON Infrastructure Contracting WLLAir-conditioning Systems Installation for project CP63 and CP133 New Doha International Airport.Planning, Site Supervision, QA/QC, Duct Sizing, Duct Installation, Fiber Glass/ Rock Wool Insulation, Wrapping, AHU Installation, Exhaust/Fresh Air Fan Installation, Flexible Duct, VAV Installation, Grill Installation, Kitchen Hood, Material Procurement.

    • R.C.G

      Jan 2014 - Jan 2016
      Site Mechanical Engineer

      Project: Desalination Plant (Steam Boiler 24,000kg\h)- Centrale Zouk, Beirut, Lebanon;Project: Koudie Ed Draouech- Algeria 1200MW GE-Doosan combined Cycle (fuel –steam, gas-steam, 400MWx3) Planning, Scheduling (Primavera P6), Installation of the following: Boiler, Duct, Casing, Insulation, P& ID, I&C, Piping, Stack, Platform, Silencer, BD Tank, Steel Structure (Load Calculation, Fabrication and Assembly), Pneumatic Valves

    • RCG France

      Jan 2015 - Dec 2016
      Deputy Construction Manager

      Project: Talimarjan Thermal Power Plant Expansion Project- Construction of Two Combined Cycle Power Plant (Gross 929MW) Preparation of Site Camp for Direct Manpower and Housing for Staff, Canteen, Site Offices, Warehouse, Store, Fabrication Shop and Welding School during the mobilization period. Planning, Scheduling (Primavera P6), Preparation of Monthly Site Progress, Negotiation with Client regarding new contracts, conducting progress meetings with client. Transformers (Hyosung): 500kVa Development of Lifting Plan and Installation.HRSG (Doosan): Development of Method Statement and Lifting Plan for heavy Lifting above 60Ton (Steel Structure, Modules “325 Ton”, Stack, Steam Drums etc. …), Supervision on the following: Alignment, Welding, Duct installation, Casing Installation, Insulation, P& ID, I&C, Piping, Piping Insulation, Bellows Installation, Stack Fit-Up, Stack Welding, Installation and Alignment, Platform Assembly and Installation, Silencer Installation, Dearator Installation, BD Tank Installation, Steel Structure and Temporary Supports (Fabrication and Assembly), Pneumatic Valves, MOV Installation etc. STG (FUJI): Development of Method Statement and Rigging Plan (Overhead Crane), Installation and Alignment of sub-sole plates, base plates, bearing pedestal, condenser, assembly of Balancing, Piping Installation and Insulation. GTG (Mitsubishi Heavy Industries): Development of Method Statement and Rigging Plan (Gantry System), Installation and Alignment of sub-sole plates, base plates, bearing pedestal, Balancing, Piping Installation and Insulation. Show less

    • Kempinski Hotels

      Jan 2016 - Jun 2019
      Assistant Director Of Engineering

      Preopening period of the HotelTaking care of Site observation, Snagging List for all guest rooms lounges, public areas, BOH, MEP Systems “Fire Protection, MV, LV, BMS, RMS, Chillers, Steam Boilers, Pools, Water Treatment, UPS…Etc.) , Preparation of Daily Patrol forms that applies to hotel systems, Handing over of guest rooms and MEP Systems, Close out reports, Substantial Completion Tracker, Handover Tracker, Critical Path, etc… .Operation Period of the hotelResponsible of Preventive maintenance program, Annual Maintenance Contracts, Daily Patrols, Daily Check for Guest Feedback in order to maintain Zero Defect Policy and enhance our rooms, P&L, CAPEX Plan, POMEC, Departmental Training, Achievement of Minimum list of Mandatory Audits, follow up with the contractors on the defected parts during the liability period, follow up with contractors on new projects etc…. Show less

    • Zulal Wellness Resort

      Jul 2019 - Apr 2022
      Director Of Engineering

      Preopening and operations of the HotelSetup policies and procedures of the department, Working on Critical Path, Preparing POB for Engineering department, Conducting Weekly site progress meetings, Preparing Site observation, Established snagging Lists for all guest rooms, lounges, public areas, BOH, MEP Systems “Fire Protection, MV, LV, BMS, RMS, Chillers, Pools, Water Treatment, UPS…Etc.), established Daily Patrol forms that applies to hotel MEP systems, FLS systems and ID, Handing over of guest rooms and MEP Systems, Close out reports, Substantial Completion Tracker, Handover Tracker, Organization chart structure, interview and selection of candidates, Setup of Service request program “Nuvola”, witnessing commissioning and testing of all MEP systems in presence of consultant, Setup of Preventive maintenance program… etc. Preparing budgets and CAPEX plan, negotiating AMC’s, leading design and construction of new projects, Leading Risk Assessment, Health and Safety Audits preparations…etc. Show less

    • Mondrian Doha

      Mar 2022 - Mar 2024
      Director Of Engineering
    • Jayasom

      Mar 2024 - now
      Regional Director of Engineering
  • Licenses & Certifications

    • Verified International Academic Qualifications

      World Education Services
      Nov 2021
      View certificate certificate
    • HACCP Certification

      Boecker