Praveen Kumar ACM., PMP., CCP., MAPM.,

Praveen Kumar ACM., PMP., CCP., MAPM.,

Planning Engineer

Followers of Praveen Kumar ACM., PMP., CCP., MAPM.,6000 followers
location of Praveen Kumar ACM., PMP., CCP., MAPM.,Dubai, United Arab Emirates

Connect with Praveen Kumar ACM., PMP., CCP., MAPM., to Send Message

Connect

Connect with Praveen Kumar ACM., PMP., CCP., MAPM., to Send Message

Connect
  • Timeline

  • About me

    Planning | Project Controls | Performance | Claims | Rail | Infrastructure | Risk

  • Education

    • National Institute Of Construction Management and Research

      2012 - 2014
      PGP Advanced Construction Management 8.6

      Activities and Societies: Placement Committee Member of 26th batch PGP-ACM

    • Arockia Matha Matriculation Higher Secondary School,Trichy

      1995 - 2007
    • ZIGURAT Institute of Technology

      2024 - 2024
      Postgraduate Degree Artificial Intelligence Applied for Construction
    • College of Contract Management United Kingdom

      2021 - 2021
      Certificate in Claims Preparation & Dispute Management
    • Manipal University Jaipur

      2022 - 2024
      Master of Business Administration - MBA Data Science
    • College of Contract Management United Kingdom

      2020 - 2020
      Professional Diploma in Forensic Schedule Analysis
    • PSG College of Technology

      2007 - 2011
      BE Civil Engineering 7.82 CGPA

      Activities and Societies: Placement Representative of Civil Engineering dept, Marketing convener in COLOSSUZ xi & Event coordinator in KRIYA ‘10 a National Level Technical Symposium in PSG College of Technology

  • Experience

    • L & T Construction

      Jun 2011 - May 2012
      Planning Engineer

      Work Profile:> Quantity Estimation of civil works> Preparation of Integrated Project Plan using Primavera (P6) which incorporates EPC logic > Preparation of comparative statements for material suppliers and sub-contractors> Reporting the progress status to Higher Management & Client (DPR & MPR) > Part of “Project Excel”, a team formed with Accenture to obtain operational excellence> Maintaining Drawing Register

    • Hindustan Construction Company Ltd

      Apr 2013 - Jun 2013
      Summer Intern (Full Time)

      Work Done:> Analysis of unit cost of aggregate production in 125 TPH crushing plant> Analysis of unit cost of DMB activity> Planning of 3.42 km road using MS-Project & MS-Excel> Preparation of DPR template for monitoring using MS-Excel> Productivity and Time Cycle Analysis

    • Tata Advanced Systems Ltd

      Nov 2013 - Feb 2014
      Internship

      Work Done:Technical feasibility studies for alternative construction methodologies and materials for an industrial buildingSelf supporting roof systemGlass Fibre Reinforced Gypsum (GFRG) panels

    • Khansaheb Civil Engineering LLC

      Jul 2014 - Oct 2016

      The major scope of the project includes - complete demolition & refurbishment of 17 nos. of toilets, 13 nos. of entry courts, seismic strengthening works throughout the mall, new deck coating in car park - (first & second floor), new car park paving in ground floor, complete exterior decoration works, mall internal upgrade works and mall MEP upgrade works.The challenges to these works are mainly, working over a live mall, maintaining the traffic movements, limited working hours in night (mall shutdown period), etc. Show less The Project impose a very high challenge as it involves expansion over a live mall within an original construction schedule of 13 months, which has the second most number of footfalls in Dubai, The main scope of the project includes, 24 no’s of cinemas screen (VOX, IMAX), retails units, food & beverages units, car park modification works (addition 1300 spaces) along with welcomes courts, roof lights, domes, sub stations, seismic strengthening work inside mall, traffic management system, water tank and construction of shear walls over newly driven barrette piles. Show less

      • Planning Engineer

        Nov 2015 - Oct 2016
      • Planning Engineer

        Jul 2014 - Jun 2016
    • ACCIONA

      Nov 2016 - Feb 2020
      Deputy Planning Manager - Route 2020 Metro Rail Extension Project

      The project scope includes 15km of metrorail, out of which 11.84km of viaduct and 3.2 km of underground, with construction of 5 elevated stations, 2 underground stations and other free-standing buildings.

    • Jacobs

      Mar 2020 - Feb 2025
      PMO Lead, Project Controls - Etihad Rail Stage 2/ Stage 4

      The Etihad Rail Stage 4 Programme includes construction of stations across the stage 2 network and its corresponding system works, rolling stocks, depot, etc.The Etihad Rail Stage 2 Programme includes 4 civil packages laying of approx. 566 km of the railway network with various Bridges, Underpass & Culverts across the Emirates. Further, it includes Freight Facilities package covering facilities at Gheifwat, ICAD, KPO, DIC & ADGP, an Operation & Maintenance Facility at Al Faya, a Rolling Stock supply packages for Locomotives, Wagons & Yellow plants, and the System package for the entire network. Show less

    • Parsons Corporation

      Feb 2025 - now
      Planning Manager - Dubai Blueline Metro
  • Licenses & Certifications

    • Online Workshop on Construction Automation and Robotics

      Centre for Outreach and Digital Education, IIT Madras
      Oct 2022
    • Microsoft Power BI Desktop for Business Intelligence

      Udemy
      Mar 2021
    • Project Management Professional (PMP)®

      Project Management Institute
      Jul 2015
      View certificate certificate
    • Microsoft Office Specialist- MS Excel

      Microsoft
      Nov 2013
    • Course on Primavera 6.0

      CADD Centre Training Services Pvt Ltd.
    • Professional in Civil CADD (STAAD Pro, Archi CAD)

      CADD Centre Training Services Pvt Ltd.
    • Proficeint in 5D BIM (Revit Architecture, Navisworks, Quantity Takeoff)

      CADD Centre Training Services Pvt Ltd.
      Dec 2019
    • Certified Cost Professional (CCP)

      AACE International
      Sept 2019
      View certificate certificate