CLEMENT VICTOR

CLEMENT VICTOR

RT Technician

Followers of CLEMENT VICTOR69 followers
location of CLEMENT VICTORTamil Nadu, India

Connect with CLEMENT VICTOR to Send Message

Connect

Connect with CLEMENT VICTOR to Send Message

Connect
  • Timeline

  • About me

    Looking for job as QC WELDING/PIPING INSPECTOR/NDT

  • Education

    • St. Xavier's Polytechnic College

      1997 - 2000
      DIPLOMA Mechanical Engineering

      Activities and Societies: Welding technological,automobile

    • St.Xavier's

      1995 - 1997
      DIPLOMA Mechanical Engineering
  • Experience

    • SIVERT INDIA LTD

      Jan 2001 - Dec 2001
      RT Technician

      RT Technician

    • SPIC Jel Engg. Construction Ltd.

      Feb 2002 - Mar 2006
      Quality Control Supervisor

      Carry out NDT Coordinator/Welding Inspection

    • National Contracting Company

      Apr 2006 - Aug 2006
      Quality Control Inspector

      NDT Coordinator/WPS & PQR Preparation/ Conduct Welder Qualification Test

    • Jurong Engineering Limited

      Apr 2007 - Apr 2008
      Quality Control Inspector

      NDT Coordinator/RT Film Interpreter/Welding Inspector

    • Ishikawajima Harima Heavy Industries Limited

      May 2008 - Aug 2008
      Quality Control Inspector

      Mechanical QC Inspector/NDT Coordinator/Film Interpreter/PMI operator

    • Jurong Engineering Limited

      Nov 2008 - Nov 2009
      QC INSPECTOR
    • GR ENGINEERING LTD

      Jan 2010 - Oct 2010
      Quality Control Inspector

      Piping /Welding Inspector

    • EQUATOR ENGINEERING

      Aug 2011 - Oct 2012
      QC Inspector

      o Production welding before start, during and after welding for satisfactory resultso Consumable control system, such as baking / holding of low hydrogen type electrodes and filter wires• Witnessing:o Fit-up inspection involving all aspects like material identify, bevel angle, root gap, etc.o Rotatic equipment pre-alignment and post-alignment activitieso Motor solo run, vibration and mechanical run testso For bolt tightening procedure for flanges as per Method Statement. Torque Wrench & Hydraulic Tensioningo Fit-up inspection involving all aspects like orientation, material identify, traceability and dimensional accuracy• Formulating RFI, checklists & reports on inspections, undertaking test for the conclusion & welder qualification test and monitoring welders performance• Recording welding parameters such as voltage, current, welding speed, during procedure, welder qualification test and production• Coordinating inspection and test requirements on behalf of QC Section Head with the client Show less

    • Chiyoda Malaysia Sdn.Bhd.

      Nov 2012 - Dec 2013
      QC PIPING INSPECTOR

      o Production welding before start, during and after welding for satisfactory resultso Consumable control system, such as baking / holding of low hydrogen type electrodes and filter wires• Witnessing:o Fit-up inspection involving all aspects like material identify, bevel angle, root gap, etc.o Rotatic equipment pre-alignment and post-alignment activitieso Motor solo run, vibration and mechanical run testso For bolt tightening procedure for flanges as per Method Statement. Torque Wrench & Hydraulic Tensioningo Fit-up inspection involving all aspects like orientation, material identify, traceability and dimensional accuracy• Formulating RFI, checklists & reports on inspections, undertaking test for the conclusion & welder qualification test and monitoring welders performance• Recording welding parameters such as voltage, current, welding speed, during procedure, welder qualification test and production• Coordinating inspection and test requirements on behalf of QC Section Head with the client• Performing:o Reviews of welding consumable, welding equipment calibration certificates & electrode storage ovens list and calibration certificateo Visual inspection of welds as per code & specificationso Base material inspection as per supplier / manufacture documents / mill certificate with respect of type, size, quantity identification & visual inspectiono Installation of valves & checking flow direction of check, globe, butterfly, control valves, etc.o Checks on the flange ratings, serration face, bolts, gaskets materials & type are in accordance with design drawings & company specifications• Establishing NDT procedures and applying different techniques like RT, UT, LPT and MPT in judging the quality of joining with reference to codes Show less

    • Equator Engineering Sdn Bhd

      Nov 2014 - Feb 2018
      QC Engineer

      QC Engineer

    • GS E&C

      Apr 2018 - Oct 2019
      Quality Control Inspector

      QC Piping / Welding Inspector

  • Licenses & Certifications

    • ASNT Central Certification Program Level II - Magnetic Particle Testing (ACCP-MT)

      SIS INSTITUTE
      Feb 2018
    • ASNT NDT Level II Certification - Liquid Penetrant Testing (PT) (ASNT-NDT2-PT)

      SIS INSTITUTE
      Feb 2018
    • ASNT NDT lEVEL II Radiographic testing

      SIS INSTITUTE
      Feb 2018
    • CSWIP 3.1

      TWI
      Sept 2015
    • KNPC APROVALS

      Kuwait Petroleum Corporation
      Feb 2018