
Petronilo Vecina Jr.
Unit Manager - Millwide Services Section

Connect with Petronilo Vecina Jr. to Send Message
Connect
Connect with Petronilo Vecina Jr. to Send Message
ConnectTimeline
About me
Registered Electrical Engineer for Quality Control and Quality Assurance (Aramco Approved - CBT Passer)
Education

Oilwell Drilling Technology Development Center., Inc.
2007 - 2007Basic Training Program for Drilling Personnel with RIG PASS Oilwell Drilling Technology Vocational- Introduction to Basic Oil Well Drilling Technology- IADC Rigpass Orientation and Basic Safety Awareness (Including Slinger and Bankman Measure)- Orientation on the Prevention of Marine Pollution by Oil pursuant to MARPOL 73/78 Annex I, Regulation 21- Introduction to Hydrogen Sulfide (H2S)/SCBA- First Aid at Oil and Gas Drilling Rig

St. Joseph College
1983 - 1985Bachelor of Science in Civil Engineering (1st and 2nd Year) Civil Engineering FreshmanElementary and high school student.

St. Joseph College, Maasin City, Southern Leyte, Philippines
1980 - 1983Elementary and High School Graduate High SchoolActivities and Societies: Math Club, Science Club, Knights of the Altar, SJC Boy's Choir

St. Joseph College, Maasin City, Southern Leyte, Philippines
1974 - 1980ElementaryActivities and Societies: Math Club, Science Club, Arts Club

University of San Jose - Recoletos
1985 - 1988Bachelor of Science in Electrical Engineering Electrical and Electronics Engineering BachelorActivities and Societies: Institute of Integrated Electrical Engineers of the Philippines - Life Member, Sigma Upsilon-Upsilon Lambda, Josenians Inc.-Alumni Studied bachelorship degree in Electrical Engineering through classroom instructions, laboratory and workshop training, plants and site tours, and on the job trainings.
Experience

Picop Resources Inc.
Jul 1989 - Nov 1996Unit Manager - Millwide Services Section-Responsible in the management and implementation of approved Capital Expenditure (CAPEX) and Major Overhaul and Repair (MOR) projects such as:- a. Installation of electric motors, station transformers, medium and high voltage breakers and switches- b. Upgrading of AC and DC electric motor drive controls- c. Rehabilitation or replacement of cable trays and cables- d. Fabrication of motor controllers, control panels and other electrical control enclosures-Monitor and follow-up deliveries of materials required in the implementation of the projects.-Coordinates with the Human Resources Department (HRD) for the hiring of contractual personnel required in the projects.-Coordinate regularly with the Department Planner and other Junior Managers regarding support requirements.-Prepares the unit’s Monthly Accomplishment Report and Project Variance Report.-Prepares the annual Unit Budget Requirements Show less

VISAYAN ELECTRIC COMPANY, INC.
Mar 1997 - Dec 2005Electrical Engineer - Transmission and Distribution Dept.- Conduct inspection to completed line transmission and distribution works as per request submitted by the Line Construction Supervisor or concerned subcontractor.- Review documents to ensure completeness of required attachments such as copy of the Work Order, approved drawings, Bill of Materials (including materials to be removed from site in case of line reconstruction/improvements).- Prepare and submit Inspection Report to the QA Department Manager for approval and comments wherein in case of discrepancy noted should be clearly noted and photographs are attached for support when necessary.- Maintain record of all site inspection reports taking note of those pending for re-inspection.- Provide copy of inspection report to concerned Line Supervisors, subcontractors (for billing purposes), and the Materials Management Department (for materials accounting and reconciliation purposes).- Provide supervisory support to the Line Construction Department and Line Maintenance Department inn case of emergency and large power interruption due to power transmission line problems and scheduled maintenance activities.- Conduct random inspection and review to existing and old transmission and distribution lines in cooperation with the Engineering Department to improve power service reliability and to reduce unscheduled power interruptions.- Prepare and submit weekly accomplishments reports.- Provide inputs to the Department Manager regarding improvement of the department’s performance and budget preparation and control.- Attend regularly to weekly coordination meetings and emergency meetings as called for by other departments. Show less

M.S. Al-Suwaidi Industrial Svcs.
Jul 2007 - Jul 2008Site Electrical Engineer-Review/check electrical drawings, project schedule, engineering plans and project specifications. -Coordinate with the Site Engineering Department regarding issuance of approved IFC drawings covering electrical works under subcontractor’s scope of works.-Coordinate with the client regarding issuance of approved IFC drawings for electrical works.-Regularly supervise and check work progress on site such as construction of cable trenches, cable trays, cable conduits, lighting systems, installation of electrical equipments such as transformers, generator sets, MCC, and etc.-Coordinate with the Material Engineers regarding the availability and requisition of materials including the free-issue materials and equipments from the client.-Provide assistance to Material Engineers in the withdrawal of materials from own warehouse or from the client’s warehouse and lay-down yards.-Coordinate with the other departments regarding equipment and other trades require at site.-Coordinate with the QA/QC Department regarding substandard work issues especially NCR’s from the client.-Report regularly to the Department Manager regarding work progress and issues including materials and equipment requirements as per work schedules.-Attend regular coordination meetings and especial meetings called by the client or managers of other departments.-Prepare and submit a daily work progress report to the Department Manager-Coordinate regularly with the Project Planning Department and the Materials Department for the status of materials and equipments required for installation as per three-months look-ahead plan.-Provide strict supervision to site electrical personnel thru the Foremen regarding the observance of health and safety policies of the client company.-Coordinate regularly with the Safety Engineers in the implementation of safety policies and provision of personal protective equipments (PPE). Show less

Oger Emirates LLC
Aug 2008 - Apr 2011QA/QC Electrical Engineer-Ensure that the quality of all works carried out at the project site is as per the client specifications and requirements and in compliance with Project Quality Plan (PQP) & Inspection Test Plan (ITP).-Coordinate regularly with the concerned subcontractor QA/QC staff for the schedule of the inspection and testing as per Request for Inspection (RFI) in conformance to the ITP in the area of jurisdiction.-Make sure that all RFI’s are provided with required attachments such as Test Reports (for materials and equipments), Calibration Certificates (for test instruments and tools), approved Material Submittal (for materials and equipment) , previous copies of Inspection Request and IFC Drawings and/or As-Built Drawings.-Maintain a record and frequently review all logs, covering Inspection Request, Material Inspection Request, Method Statements, Material Submittals and etc and monitoring their status.-Review of method statements and other project specific documentation, in consultation with the Project Manager / Team.-Issue and control the snag/punch list and subsequently, follow-up on it.-Regularly prepare and submit report daily to the QA/QC Senior Electrical Engineer.-Coordinate and follow-up the subcontractors for formulation of as-built details required by the Engineering Department for the O & M Manuals.-Ensure that the workmanship is according to the required quality as per project specification and the materials used are covered with approved material submittals.-Ensure that the best engineering practices are implemented by the subcontractors as per approved method statement.-Conduct inspection of materials delivered at site as per RFI issued by the subcontractors with reference to pertinent approved Material Submittals.-Prepare NCR when the specification or procedural requirements are not met when necessary in consultation with and approval of the Senior QA/QC Engineer and Department Manager. Show less

Nesma & Partners
Sept 2011 - Jan 2023QA/QC Electrical Engineer-Conduct surveillance inspection on the ongoing activities at site to ensure that the quality of all works carried out are as per the client specifications/standards and in compliance with Project Quality Plan (PQP) & Inspection Test Plan (ITP).-Conduct surveillance inspection to laydown yards, warehoused, and storage facilities to ensure that client’s standards for storage, handling, and materials preservation are followed.-Issue Proactive Notifications to address noted violation as noted during the surveillance inspection.-Inspect delivered materials and equipment at the laydown yards, warehouse, and other storage facilities and at site as per internal RFI issued by the Construction. Check and verify conformance of the delivered materials and equipment against client’s specifications and standards. Any discrepancy noted will be reported immediately so that the rejected materials and equipment will be returned to the supplier for replacement.-Conduct inspection on the completed electrical works at site as per internal Request for Inspection (RFI) issued by the Construction. Check and verify quality of works to ensure that the client’s project specification/standards are met.-Issue internal Non-Conformance Report (NCR) to the Construction for the rectification of noted work quality that violates client’s specifications/standards.-Prepare RFI and submit to the client’s Inspection Department. Preparation of RFI includes encoding and saving to the client’s online Quality Management System and printing of hard copies including attachments such as copies of IFC drawings, test reports, test equipment calibration certificates, and etc.-Prepare Material Receiving and Storage and Handling RFI and submit to the client’s Inspection Department. Preparation of RFI includes encoding and saving to the client’s online Quality Management System and printing of hard copies including attachments such as copies of purchase orders (P.O.), delivery notes, test certificates. Show less

TÜV Rheinland Group
Feb 2023 - nowElectrical InspectorGeneral Inspection Services
Licenses & Certifications

Registered Electrical Engineer (REE) - Professional Regulation Commission, Philippines
Professional Regulation Commission, PhilippinesFeb 1991
Volunteer Experience
Board Examination review instructor
Issued by Institute of Integrated Electrical Engineers of the Philippines Bislig Bay Chapter on Aug 1995
Associated with Petronilo Vecina Jr.
Languages
- enEnglish
- taTagalog
- biBisaya
- arArabic
Recommendations

Ananta gaur
Talent and Culture | Program Manager | Design Thinker | Diversity, Equity & Inclusion |Bangalore Urban, Karnataka, India
Alessandro kovacs
Incoming Management Trainee Intern | Marketing & Management Student at Robert H. Smith School of Bus...College Park, Maryland, United States
Bhavesh deore
University Doctoral Research FellowNew York City Metropolitan Area
Joshua jones
Modern Work SpecialistGreater Sydney Area
Abdul basit
EHS Professional | Environmentalist | Sustainability | Fire Safety Management | NFPA | OHSMS | Proje...Houston, Texas, United States
Nataliya rytova
Operations Manager at Integrated Design Tools, Inc.Pasadena, California, United States
Martinus vink
Veldmedewerker bij Stichting Limburgs LandschapArnhem-Nijmegen Region
Julian saverance
Senior Survey Manager at GPI Geospatial Inc.Charlotte, North Carolina, United States
Aaron stamper
Account Manager at LiftOneConcord, North Carolina, United States
Abdulrahman ismail
Account Manager & Sales AdminRiyadh, Saudi Arabia
Mustapha mabrouki
Responsable RH de proximité, Contrôle de Gestion Sociale - Redal, Veolia Maroc. Doctorant Chercheur ...Rabat, Rabat-Salé-Kénitra, Morocco
Pushpendra kumar
Executive Housekeeper (HOD)at The Bella-Monde Hotels Delhi IndiaNew Delhi, Delhi, India
Mark a. anderson, cfp®
Managing Director at Fort Point Capital PartnersSan Francisco, California, United States
Omer f. yanarates
LawyerIstanbul, Istanbul, Türkiye
Stephen davies
Account Executive at MarshSydney, New South Wales, Australia
Carolina perticari, ed.d.
💡 Strategic 🎯 Solution-Oriented 🔥 ActivatorCharlotte, North Carolina, United States
Sajidul haque
Assistant Manager at PGP Glass Pvt. Ltd.Greater Kolkata Area
Karly campbell
Chief Quality Officer at TennCareNashville, Tennessee, United States
Joanna stańko
Kierownik działu Specyfikacji Surowcowych Specifications Portfolio Manager w firmie Danone Nutricia ...Wroclaw Metropolitan Area
Clarisse poblete
Independent Data Consultant & Analytics EngineerMetro Manila, National Capital Region, Philippines
...