Romain SIRET

Romain SIRET

Worker

Followers of Romain SIRET527 followers
location of Romain SIRETGabon

Connect with Romain SIRET to Send Message

Connect

Connect with Romain SIRET to Send Message

Connect
  • Timeline

  • About me

    Drilling & Completion Supervisor at Perenco

  • Education

    • IFP School

      2012 - 2013
      Master's degree Petroleum Engineering and Project Management Oil & Gas Upstream Engineer

      Overview of the upstream sector ans interactions between the three specialities :- Reservoir : geology, logging, well test, PVT studies- Drilling : Casing positioning and design, directional drilling, cement job, mud, completion, bottom hole/matrix connection, well control. IWCF.- Production : water/gas/condensate treatment, thermodynamic, well stimulation, flow assurance, offshore installations

    • IUT Génie Civil Lyon

      2007 - 2009
      BTEC Higher National Diploma Civil Engineering Technician

      Public works / buildings

    • Ecole spéciale des Travaux publics, du Bâtiment et de l'Industrie

      2009 - 2012
      Master's degree Civil Engineering Civil Engineer

      Special field: topography, all about geolocation, mapping, cadastre, city development, etc.Construction skills : steal structures, reinforced concrete structures, roads, bridges, tunnels, buildings.

  • Experience

    • Dragados SA

      Jul 2008 - Aug 2008
      Worker

      Working on some work sites in Cantabria, foundations of pylons.

    • Cegelec

      Jan 2009 - Feb 2009
      Design Engineer

      Using of TOWER (PLS CADD) to calculate trussed pylons.

    • IUT A Lyon 1

      May 2009 - Jun 2009
      Research

      Research in collaboration with INSA’s labs about composite beams (steel/concrete) for the national MIKTI project. The goal was to create an assemblage with structural adhesive instead of steel studs.

    • Lueur d'Afrique

      Jul 2010 - Aug 2010
      Humanitarian mission

      Installation of solar panels

    • STORENGY

      Jun 2011 - Aug 2011
      Civil Engineer

      Reporting and redaction of the procedure: “realization of onshore platforms”.

    • Cofor (Vinci)

      Mar 2012 - Jul 2012
      Jr Rig Engineer

      Following of a geothermal drilling project, from the Rig set up to the DTM operation, including all drilling operations (cementing, logging, directional drilling …). Design of various plans (installation, cellar, …), for a HH300 Rig and work on HSE issues.

    • Maurel & Prom

      Nov 2013 - Oct 2018

      Work on a 30 000 bopd / 150 wells / 80% PCP oilfield - Management of 5 Well Intervention teams and 2 Slickline Units (more than 500 operations per year) - Intervention programs and cost study: around 50-60 programs per year - Well Performance analysis: completion failure, wells optimization, near-wellbore damage - Engineering team leader for new technologies and operations - Purchase and negotiation of equipment and services - In charge of most department statistics including production monitoring and forecast Show less Work on a 30 000 bopd / 150 wells / 80% PCP oilfield - Supervision of 1 up to 2 units working on WorkOver and Well Intervention jobs - Completions: PCP / Water Injection / ESP (with or w-o Y-Tool) - Flow control: Casing patch / Mechanical, Hydraulic Packers or Dual-Packers / Bridge Plug - Pumping: Sand Jetting / Acidizing / Wellbore interface cleaning / Hot Oil / Injection Test / Well Control with OBM or WBM up to 1.75 sg. - Supervision of slickline/digital slickline jobs Show less

      • Drilling & Completion Supervisor

        Feb 2018 - Oct 2018
      • Workover & Completion Engineer

        Nov 2015 - Feb 2018
      • Workover & Completion Supervisor

        Nov 2013 - Nov 2015
    • Perenco

      Oct 2018 - now

      Design of drilling wells, equipment selection, equipment preparation, supervision of operations remote or on site depending on complexity. Design of ESP / Natural Flow completionsSupervision of Completion operations on site Offshore - Jackup Norve (Borr Drilling), 2000klbs: 3 development wells + 1 exploration well

      • Completion Engineer

        Jan 2023 - now
      • Completion Engineer

        Jul 2022 - Jan 2023
      • Completion Engineer

        Jan 2022 - Jul 2022
      • Drilling & Completion Supervisor

        Oct 2018 - Dec 2021
  • Licenses & Certifications

    • IWCF - Drilling Well Control Subsea level 4

      EFF
      Dec 2020
    • BOSIET / EBS

      RelyOn Nutec (Global)
      Feb 2019