Muhammad Azhar

Muhammad Azhar

Senior Technician

Followers of Muhammad Azhar2000 followers
location of Muhammad AzharLahore District, Punjab, Pakistan

Connect with Muhammad Azhar to Send Message

Connect

Connect with Muhammad Azhar to Send Message

Connect
  • Timeline

  • About me

    Team Lead Engineer E & I Automation Haidri beverages (Pepsi) pvt LTD, Islamabad.

  • Education

    • Kohat University of Science & Technology

      2006 - 2010
      B.Tech hons Electrical Electrical and Electronics Engineering
  • Experience

    • Dynamic Equipment and Controls (Pvt) Ltd

      Mar 2010 - Feb 2016
      Senior Technician

      Ammonia Refrigeration Plant (Grasso Compressors, Package chiller, Condenser, Liquid receiver, heat Exchanger) Installation commissioning, Servicing, Maintenance and troubleshooting.  Cameron Centrifugal Air Compressor Systems installations commissioning, Servicing, Maintenance and troubleshooting.  Working on Siemens PLC S7 300, Danfoss VFD, Soft Starters(WEG, Danfoss, Bonshaw),  Control and Automation Accessories. Project  FFC Sahiwal Grasso Ammonia Refrigeration Plant August 2014  FFC JBT Food Lines and Cold Storage and Freezers September 2014  CCBPL Gujranwala Grasso Ammonia Refrigeration Plant Nov 2013  Panel making experience (PLC C7-635, S7 300 and Relay Logic and different control Electrical Panels).  Gourmet Lahore sunder state Grasso Ammonia Refrigeration Plant 2010  CCBPL Lahore Grasso Ammonia Refrigeration Plant 2010  CCBPL Gujranwala Grasso Ammonia Refrig Show less

    • Lotte Akhtar Beverages (Pvt) Ltd.

      Feb 2016 - May 2023

      Hardware and software troubleshooting on machines of Glass Line (De-Palletizer, Palletizer, Unpacker, Packer, Filler, Mixer)  Hardware and software troubleshooting on PET Lines Machines (Blow Mold, Labeller, Shrink wrap etc.)  Little Programming of Siemens PLCs (Simatic S7 200, S7 300 & S7 400) With Ladder diagram.  Troubleshooting of PLC Siemens Hardware as well as software problems.  Strong knowledge about DP/DP Coupler, CP, FM, SM, Repeater, IM etc.  Troubleshooting of ASI Master Slave Network.  Working and troubleshooting on different types of Safety relays (Pilz PNOZ S1, S2 etc., Wieland SNO 4062K, SNM 4001 etc.)  Troubleshooting of Hardware and communication faults occurring at PROFIBUS, ASI, CAN and Ethernet communication protocols.  Working and some troubleshooting of Videojet coding machines.  Installation, commissioning and troubleshooting experience of AC/DC and Servo drive like Danfoss ( FC 300 series, FCD 300 series, VLT 2800 series, VLT 5000 series), SEW, KUKA, Infranor and Acopos etc.  Working experience and knowledge of following sensors:  Proximity (Inductive, capacitive)  Photoelectric (PNP, NPN, Through Beam, Retro-Reflective, Diffuse-Reflective)  Temperature (Thermocouple, RTD, Thermistor )  RTD(PT100, PT1000) & Analog sensors( 2wire 3-wire, 4-wire)  Working and Calibration of temperature and pressure transmitters and Control valves.  Installation and commissioning of controllers according to the site requirement like temperature controllers (DTA 4848, Krones) etc.  Experience of working on pneumatic cylinder (i.e. Single & Double acting) and solenoid valves. Show less enced most of the below during my work at RBL  KHS PET Filling Line: 22000 BPH  KHS PET Filling Line: 6000 BPH  KRONES PET and GLASS Filling Line: 22000 BPH & 45000 BPH  NANJING Light Industry GLASS Bottles Filling Technology: 30000 BPH  Husky Injection Molding Technology  Berkefeld Water Treatment RO Plant  Van Der Molen process Syrup Plant  Tetra juice filling line: 7500 PPH  The key responsibility is to design and conduct such technical activities. This not only increases the efficiency of plants but also minimizes the causes of Electrical breakdowns of machines.  Reporting and coordinating with Manager Instrumentation and Control to Plan Electrical needs of department.  Leading a team of eight instrumentation& Controls Technicians.  Facilitating Mechanical Engineers by sharing responsibilities during production to get maximum production.  Managing Electrical parts to avoid breakdowns due to unavailability of parts. Show less

      • Instrument Control Engineer

        Feb 2016 - May 2023
      • Junior Engineer instrument and control Automation

        Feb 2016 - Oct 2021
    • Haidri Beverages Pvt. Ltd. PepsiCola International Franchise

      May 2023 - now
      Team Lead E&I
  • Licenses & Certifications

    • Industrial Automation (PLC &HMI)

      PITAC Regional Office Karachi