Adeel A.K

Adeel A.K

QA/QC INSPECTOR E&I

Followers of Adeel A.K5000 followers
location of Adeel A.KDubai, United Arab Emirates

Connect with Adeel A.K to Send Message

Connect

Connect with Adeel A.K to Send Message

Connect
  • Timeline

  • About me

    Founder & CEO || Head of QAQC || Project Quality Manager || PMP® COC”|| CQM/OE || QMS LA® ISO-9001:2015 || LSSY, G & Black Belt™ || PQS || IECEx "EX01, 04, 07 & 08"Trained ||

  • Education

    • SAIFIA POLYTECHNICAL INSTITUTE MIANWALI

      2004 - 2007
      DAE (Diploma of Associate Engineer) Electrical Technology A

      Activities and Societies: 78.8 % Marks (2nd Position in District Mianwali-Punjab Pakistan)

    • Govt M.C high School Mianwali

      1999 - 2001
      Matric Science
    • OTHM

      2023 - 2024
      OTHM Level 7 Diploma in Project Management Project Management

      OTHM LEVEL 7 DIPLOMA IN PROJECT MANAGEMENTEuropean Qualifications Framework (EQF) Level 7LRN: 230602030 | 081085 | DC2102515 | QAN: 603/5638/8Award on 11 March 2024PLANNING, CONTROLLING AND LEADING A PROJECT PROCUREMENT RISK AND CONTRACT MANAGEMENT ADVANCED PROJECT AND LOGISTICS MANAGEMENT OPERATIONS AND INFORMATION MANAGEMENT FOR PROJECT MANAGERSADVANCED RESEARCH METHODS

    • Preston University

      2009 - 2011
      B-TECH (PASS) ELECTRICAL 70.0 % OR 2.9 CGPA
  • Experience

    • Descon

      Jan 2008 - Aug 2010
      QA/QC INSPECTOR E&I

      Assign for:1.Olefin Ethylene Project2.Qatar Gas (shutdown) Project 3.Qafco Project Exact nature of job done• Inspection of Installation against applicable international codes and standards.• Complete plan and schedule for Electrical and Instrumentation Inspection and Testing.• Co-ordination for Client Inspection and acceptance. • Oversaw all aspects of Instrumentation and Electrical documentation including Method statements, System packages and Loop & Function test documentation.• In-charge for loop & function test for all kinds of instruments and Electrical systems from field to control room and coordinate with the client to witness and approve the tests that have been carried out.• Issue of Field Design Modification and Field Instructions (FI) to Construction and ensure that all Modified Contract Engineering Design Sheets are entered on original documents.• Provide support to the service engineer/vendor in troubleshooting, inspection/repair, design changes and modifications to the controls systems. • Prepare & submit daily and weekly accomplishment report to department manager for section work accomplishments/evaluations.• Generate punch list items for the work deviation against standard installation practice.• Checking and documentation of As-Built Drawings and Site modifications. Show less

    • Descon

      Apr 2012 - Oct 2012
      QA/QC INSPECTOR E&I

      Assign for:IGD 5 1335, Habshan Project with Descon Engineering Abu DhabiExact nature of job done• To verify the installation of instruments by performing preliminary surveillance and inspections as per the ITP. Any defects noted during the inspection shall be informed to the construction department.• To inspect installation upon receiving of Request for Inspection (RFI) from construction. All defects to be recorded on punch list.• Inspection to be done on field installed device as per instrument installation checklist, to ensure all wiring is correct and complete. Ensure that all the wiring is correctly terminated in the device and point to point tests done and recorded. Thus, JB can be inspected and thereafter the DCS Marshaling Cabinets to ensure that the internal wiring is correct. The fused links can then be closed, once the inspection is completed, to power up field devices ready for loop check.• To issue an RFI to Client regarding Invitation as per ITP.• To accompany QA Representative to carry out inspections as per AFI (Application for Inspection) and release hold points by obtaining the QA Representative Approval signatures on the various quality record as proof of inspection.• To attend on weekly meetings with the Client on the issues of difficulties occurs on the site and other work related matters.• Monitors all instrument works in progress on a continuous basis. And check the construction progress in accordance with the approved procedures.• The Verifies installation in accordance with relevant procedure and standard drawings, and to record any defects on punch lists. Show less

    • ELECTRECH PVT LIMITED

      Oct 2012 - Jul 2014
      QC ENGINEER ELECTRICAL

      Assigned for:1.Ashiayana Housing Scheme project, Lahore2.Nishat Power House, Pakistan3.Shahbaz Air base, Pakistan4.Saparco Karachi, Pakistan5.Shaheen Complex Lahore, Pakistan6.Coca cola Lahore, Pakistan7.Fatima Fertilizer Saqkabad, Pakistan8.Faisalabad Wasa Project with KSB and TOBISHEMA JAPAN9.Metro bus service project with TURKI and PAKISTAN

    • Al Hassan Engineering Company Abu Dhabi LLC

      Jul 2014 - Jun 2017
      QAQC ENGINEER E&I

      Assigned for:1.ICAD GAS Treatment to Remove H2S for EPC Works (GASCO-ICAD)2.Black Powered Management Project - GASCO3.EPC Work for Replacement of Valves & Actuators – GASCO Buhasa4.EPC Work for Surge Drum Protection & B/L Area Train 1 & 2 – GASCO Ruwais Exact nature of job done;• Performs QA/QC Inspection activities to ensure that all Instrumentation construction works are carried out in accordance with AFC drawings, Specifications, International Standards, applicable regulations and Approved ITPs.• Material approval from Client and incoming material inspection as per project specification and approval.• During SAT of Actuator, Proceed Inspection and Note reading to note for record such as PSV Test, Stroke Check-Open & Close timing, leak test and Sign on SAT Report also Client.• During Inspection, Follow the RFI procedure and Prepare RFI email regarding any Inspection such as instrument installation, Testing etc..• Before client Inspection, we will check and raise punch point and send to contractor for rectify these point.• When client will available at site, all punch point will kill and We will signed all inspected doc. With client authorize person office or Site during inspection.• Liaise between the Company’s Engineering & Pre-commissioning Team (including Vendors).• Monitor, check and sign-off E & I completion dossiers and• Prepare Inspection & Test Records (ITRs) • Ensures that Safety Policies and Procedures are applied diligently to all E&I Work, including by other discipline.• Establish close communication and teamwork with other disciplines to ensure overall project successful completion.• Lead the team with excellence accuracy of Quality of work and also connect with Construction team for successful work Show less

    • Global Pageant Inspection

      Jul 2017 - Aug 2019
      Sr. QAQC Engineer E&I

      Work as Sr. QAQC Engineer or Third Party Inspection Engineer & Assigned for:1.CPECC EPC, Mender Development Project Phase IDistribution Board, Power Distribution Panel, Power Supply Skid, Closed Drain Drums (Chemical Analysis), HVAC Control Panel, ICSS Equipment, ICSS, DCS, ESD, FGS & PLC System as a Client Inspection Representative2. KIP Co Enduser, South Pars Gas Field Development ProjectPCS, PLC ESD, F&G System and F&G Detector as a Client Inspection Representative3. Dodsal EPC, Execution of Gas Compression and Reinjection Station - ZCINA-Sonatrach & Junction Box & SDH System as a Client Inspection Representative4. Al Moayyed EPC, for Conversion of Manual Valves to Remote Operated Valves (ROV’s) & RTU and F&G as a Client Inspection Representative Show less

    • LRQA

      Sept 2019 - Mar 2023
      Lead QAQC Engineer

      Project: DEWA CSP (Noor Energy 1 P.S.C) ("DEWA CSP")Project Cost: USD 4,572 MnAssigned for:700MW CSP + 250MW PV Hybrid IPP DEWA Phase IVPT1-PV / Solar Field, Power Block, & HTF BuildingPT2-PV / Solar Field, Power Block & HTF BuildingExact nature of job doneAs Lead QAQC Engineer, Conduct the inspections as raised by EPC, Subcontractors.Conduct the weekly meeting with Subcontractor for closing the surveillance observations, Deviations & NCRsReview the Dossiers that submitted by subcontract than submit to end-user with completion certificate for final Signature "Mechanical Completion Certificate"Support the Team of Procurement as Procurement Quality Supervisor E&IQuality Control Management: Develop and implement quality control plans, procedures, and systems to ensure compliance with company and industry standards. This includes the review of procurement documents, specifications, drawings, and standards to ensure that all requirements are met.Vendor Inspection: Conduct vendor inspections and audits, ensuring that all equipment and materials meet specified requirements, standards, and specifications. Coordinate with the vendor to address any quality issues and facilitate necessary corrective actions.Coordination: Coordinate with the Procurement team, Engineering team, and Project team to ensure that all procurement activities related to electrical and instrumentation equipment and materials are in line with project requirements.Documentation: Ensure that all procurement documentation, including purchase orders, inspection reports, and other quality-related documents are maintained and up to date.Continuous Improvement: Continuously review and improve quality control processes and procedures to ensure the most efficient and effective methods are being utilized. Show less

    • SLB

      May 2023 - May 2024

      Team Leadership and Coordination:Led a multidisciplinary team, including a Punch Coordinator, PTW Coordinator, Material Coordinator, and Inspector, fostering a collaborative environment to address and resolve project issues effectively.Meeting Facilitation and Stakeholder Communication:Conducted bi-weekly meetings with Turkish Petroleum to discuss observations, planning, actions, material availability, operational PTW, and results.Engaged in tri-weekly discussions with the Operations team to resolve observations and address obstacles, ensuring clear communication and issue resolution between the project and operations teams.Supply Chain and Material Coordination:Maintained regular communication with the procurement supply chain to monitor the status of new, pending, and logistic-related aspects of materials.Compiled and analyzed data from inspections to assess material availability, updating the master file of observations with the latest material statuses.Inventory Management:Collaborated with subcontractors to update the inventory list as needed.Proactively ordered materials to mitigate potential shortages based on current inventory levels.Non-Conformance Report (NCR) Management:Maintained an accurate log of all Non-Conformance Reports (NCRs).Issued NCRs to subcontractors as required, ensuring issues were formally documented and tracked.Conducted weekly meetings with subcontractors to discuss NCRs, focusing on resolving these issues promptly and effectively to maintain project standards and timelines.Material Review and Verification:Worked closely with the engineering team to review materials prior to confirmation, ensuring alignment with project documentation and vendor-supplied documents.Dossier Submission:Prepared and submitted dossiers to clients in accordance with acceptance criteria, ensuring all required documentation met client standards and project specifications. Show less My responsibilities encompassed various tasks, including:• Pre-Inspection & Review: Thoroughly reviewing documentation related to electrical and instrument activities, such as PT (Pressure Transmitters), TT (Temperature Transmitters), lighting, cable laying, and panel installation, to ensure compliance with project specifications and standards.• Punch Point Management: Conducting inspections alongside subcontractors, utilizing the punch procedure categorization (Cat A, B, or C) to document discrepancies and non-conformities (punch points). Coordinating with subcontractors to ensure timely resolution and closure of punch points before proceeding to the mechanical inspection phase with the end user or main client (e.g. Qatar Gas, Adnoc, Zadco, Turkish Petroleum).• Client Coordination: Inviting clients for Mechanical Inspection of Electrical or Instrument activities after successfully closing Cat “A” punch points. Maintaining effective communication with clients to address concerns and provide updates on project progress.• Weekly Meetings: Organizing and chairing weekly meetings with subcontractors to discuss project status, address issues, and minimize observations, deviations, and Non-Conformance Reports (NCRs).• Documentation Management: Working on various documents, including Inspection Test Records (ITR), drawings, Material Requisitions (MR), Material Approval Requests (MAR), and conducting red markup reviews before finalizing as-built. Ensuring all parties involved sign off on these documents.• Dossier Submission: Compiling and submitting project dossiers, ensuring that all necessary documentation is complete and meets project requirements and client expectations.• Quality Focus: Focusing on maintaining construction quality throughout the project to achieve a high standard of workmanship and safety, with the ultimate goal of completing the project without any Lost Time Incidents (LTI). Show less

      • Quality Manager E&I

        Aug 2023 - May 2024
      • Lead Quality Engineer E&I

        May 2023 - Jul 2023
    • Royal Tech Contracting LLC

      May 2024 - now
      Head Of QAQC

      The person is trying to collect data from my LinkedIn profile, which is why I haven't updated this description

    • Astute Competent Workforce Solutions

      Dec 2024 - now
      Founder & CEO
  • Licenses & Certifications

    • Certified Lean Six Sigma Yellow, Green & Black Belt

      IMC Institute
      Sept 2023
    • Basic of project Management

      International Business Management Institute (IBMI)
      Mar 2020
      View certificate certificate
    • Computer Operator

      Punjab Vocational Training Council Official
      Nov 2005
    • Professional Certificate Course In Project Documentation And Quality Control

      Metropolitan School of Business & Management (UK)
      Jun 2023
    • Critical Thinking For Self Development

      Metropolitan School of Business & Management (UK)
      May 2023
      View certificate certificate
    • ISO 45001:2018 - Principles of Occupational Health and Safety Management Systems

      The CPD Certification Service
      Apr 2023
    • Lean Six Sigma Yellow Belt Certification

      6sigmastudy - The global certification body for six sigma certifications
      Nov 2016
    • PMP® Certification Training Course

      AUC - Partner in Transformation
      Jun 2021
    • Lead Auditor _ LA QMS ISO 9001 : 2015

      TÜV SÜD
      Feb 2017
    • Industrial Electrician

      Punjab Board of Technical Education,Lahore
      Nov 2006