
Adeel A.K
QA/QC INSPECTOR E&I

Connect with Adeel A.K to Send Message
Connect
Connect with Adeel A.K to Send Message
ConnectTimeline
About me
Founder & CEO || Head of QAQC || Project Quality Manager || PMP® COC”|| CQM/OE || QMS LA® ISO-9001:2015 || LSSY, G & Black Belt™ || PQS || IECEx "EX01, 04, 07 & 08"Trained ||
Education

SAIFIA POLYTECHNICAL INSTITUTE MIANWALI
2004 - 2007DAE (Diploma of Associate Engineer) Electrical Technology AActivities and Societies: 78.8 % Marks (2nd Position in District Mianwali-Punjab Pakistan)

Govt M.C high School Mianwali
1999 - 2001Matric Science
OTHM
2023 - 2024OTHM Level 7 Diploma in Project Management Project ManagementOTHM LEVEL 7 DIPLOMA IN PROJECT MANAGEMENTEuropean Qualifications Framework (EQF) Level 7LRN: 230602030 | 081085 | DC2102515 | QAN: 603/5638/8Award on 11 March 2024PLANNING, CONTROLLING AND LEADING A PROJECT PROCUREMENT RISK AND CONTRACT MANAGEMENT ADVANCED PROJECT AND LOGISTICS MANAGEMENT OPERATIONS AND INFORMATION MANAGEMENT FOR PROJECT MANAGERSADVANCED RESEARCH METHODS

Preston University
2009 - 2011B-TECH (PASS) ELECTRICAL 70.0 % OR 2.9 CGPA
Experience

Descon
Jan 2008 - Aug 2010QA/QC INSPECTOR E&IAssign for:1.Olefin Ethylene Project2.Qatar Gas (shutdown) Project 3.Qafco Project Exact nature of job done• Inspection of Installation against applicable international codes and standards.• Complete plan and schedule for Electrical and Instrumentation Inspection and Testing.• Co-ordination for Client Inspection and acceptance. • Oversaw all aspects of Instrumentation and Electrical documentation including Method statements, System packages and Loop & Function test documentation.• In-charge for loop & function test for all kinds of instruments and Electrical systems from field to control room and coordinate with the client to witness and approve the tests that have been carried out.• Issue of Field Design Modification and Field Instructions (FI) to Construction and ensure that all Modified Contract Engineering Design Sheets are entered on original documents.• Provide support to the service engineer/vendor in troubleshooting, inspection/repair, design changes and modifications to the controls systems. • Prepare & submit daily and weekly accomplishment report to department manager for section work accomplishments/evaluations.• Generate punch list items for the work deviation against standard installation practice.• Checking and documentation of As-Built Drawings and Site modifications. Show less

Descon
Apr 2012 - Oct 2012QA/QC INSPECTOR E&IAssign for:IGD 5 1335, Habshan Project with Descon Engineering Abu DhabiExact nature of job done• To verify the installation of instruments by performing preliminary surveillance and inspections as per the ITP. Any defects noted during the inspection shall be informed to the construction department.• To inspect installation upon receiving of Request for Inspection (RFI) from construction. All defects to be recorded on punch list.• Inspection to be done on field installed device as per instrument installation checklist, to ensure all wiring is correct and complete. Ensure that all the wiring is correctly terminated in the device and point to point tests done and recorded. Thus, JB can be inspected and thereafter the DCS Marshaling Cabinets to ensure that the internal wiring is correct. The fused links can then be closed, once the inspection is completed, to power up field devices ready for loop check.• To issue an RFI to Client regarding Invitation as per ITP.• To accompany QA Representative to carry out inspections as per AFI (Application for Inspection) and release hold points by obtaining the QA Representative Approval signatures on the various quality record as proof of inspection.• To attend on weekly meetings with the Client on the issues of difficulties occurs on the site and other work related matters.• Monitors all instrument works in progress on a continuous basis. And check the construction progress in accordance with the approved procedures.• The Verifies installation in accordance with relevant procedure and standard drawings, and to record any defects on punch lists. Show less

ELECTRECH PVT LIMITED
Oct 2012 - Jul 2014QC ENGINEER ELECTRICALAssigned for:1.Ashiayana Housing Scheme project, Lahore2.Nishat Power House, Pakistan3.Shahbaz Air base, Pakistan4.Saparco Karachi, Pakistan5.Shaheen Complex Lahore, Pakistan6.Coca cola Lahore, Pakistan7.Fatima Fertilizer Saqkabad, Pakistan8.Faisalabad Wasa Project with KSB and TOBISHEMA JAPAN9.Metro bus service project with TURKI and PAKISTAN

Al Hassan Engineering Company Abu Dhabi LLC
Jul 2014 - Jun 2017QAQC ENGINEER E&IAssigned for:1.ICAD GAS Treatment to Remove H2S for EPC Works (GASCO-ICAD)2.Black Powered Management Project - GASCO3.EPC Work for Replacement of Valves & Actuators – GASCO Buhasa4.EPC Work for Surge Drum Protection & B/L Area Train 1 & 2 – GASCO Ruwais Exact nature of job done;• Performs QA/QC Inspection activities to ensure that all Instrumentation construction works are carried out in accordance with AFC drawings, Specifications, International Standards, applicable regulations and Approved ITPs.• Material approval from Client and incoming material inspection as per project specification and approval.• During SAT of Actuator, Proceed Inspection and Note reading to note for record such as PSV Test, Stroke Check-Open & Close timing, leak test and Sign on SAT Report also Client.• During Inspection, Follow the RFI procedure and Prepare RFI email regarding any Inspection such as instrument installation, Testing etc..• Before client Inspection, we will check and raise punch point and send to contractor for rectify these point.• When client will available at site, all punch point will kill and We will signed all inspected doc. With client authorize person office or Site during inspection.• Liaise between the Company’s Engineering & Pre-commissioning Team (including Vendors).• Monitor, check and sign-off E & I completion dossiers and• Prepare Inspection & Test Records (ITRs) • Ensures that Safety Policies and Procedures are applied diligently to all E&I Work, including by other discipline.• Establish close communication and teamwork with other disciplines to ensure overall project successful completion.• Lead the team with excellence accuracy of Quality of work and also connect with Construction team for successful work Show less

Global Pageant Inspection
Jul 2017 - Aug 2019Sr. QAQC Engineer E&IWork as Sr. QAQC Engineer or Third Party Inspection Engineer & Assigned for:1.CPECC EPC, Mender Development Project Phase IDistribution Board, Power Distribution Panel, Power Supply Skid, Closed Drain Drums (Chemical Analysis), HVAC Control Panel, ICSS Equipment, ICSS, DCS, ESD, FGS & PLC System as a Client Inspection Representative2. KIP Co Enduser, South Pars Gas Field Development ProjectPCS, PLC ESD, F&G System and F&G Detector as a Client Inspection Representative3. Dodsal EPC, Execution of Gas Compression and Reinjection Station - ZCINA-Sonatrach & Junction Box & SDH System as a Client Inspection Representative4. Al Moayyed EPC, for Conversion of Manual Valves to Remote Operated Valves (ROV’s) & RTU and F&G as a Client Inspection Representative Show less

LRQA
Sept 2019 - Mar 2023Lead QAQC EngineerProject: DEWA CSP (Noor Energy 1 P.S.C) ("DEWA CSP")Project Cost: USD 4,572 MnAssigned for:700MW CSP + 250MW PV Hybrid IPP DEWA Phase IVPT1-PV / Solar Field, Power Block, & HTF BuildingPT2-PV / Solar Field, Power Block & HTF BuildingExact nature of job doneAs Lead QAQC Engineer, Conduct the inspections as raised by EPC, Subcontractors.Conduct the weekly meeting with Subcontractor for closing the surveillance observations, Deviations & NCRsReview the Dossiers that submitted by subcontract than submit to end-user with completion certificate for final Signature "Mechanical Completion Certificate"Support the Team of Procurement as Procurement Quality Supervisor E&IQuality Control Management: Develop and implement quality control plans, procedures, and systems to ensure compliance with company and industry standards. This includes the review of procurement documents, specifications, drawings, and standards to ensure that all requirements are met.Vendor Inspection: Conduct vendor inspections and audits, ensuring that all equipment and materials meet specified requirements, standards, and specifications. Coordinate with the vendor to address any quality issues and facilitate necessary corrective actions.Coordination: Coordinate with the Procurement team, Engineering team, and Project team to ensure that all procurement activities related to electrical and instrumentation equipment and materials are in line with project requirements.Documentation: Ensure that all procurement documentation, including purchase orders, inspection reports, and other quality-related documents are maintained and up to date.Continuous Improvement: Continuously review and improve quality control processes and procedures to ensure the most efficient and effective methods are being utilized. Show less

SLB
May 2023 - May 2024Team Leadership and Coordination:Led a multidisciplinary team, including a Punch Coordinator, PTW Coordinator, Material Coordinator, and Inspector, fostering a collaborative environment to address and resolve project issues effectively.Meeting Facilitation and Stakeholder Communication:Conducted bi-weekly meetings with Turkish Petroleum to discuss observations, planning, actions, material availability, operational PTW, and results.Engaged in tri-weekly discussions with the Operations team to resolve observations and address obstacles, ensuring clear communication and issue resolution between the project and operations teams.Supply Chain and Material Coordination:Maintained regular communication with the procurement supply chain to monitor the status of new, pending, and logistic-related aspects of materials.Compiled and analyzed data from inspections to assess material availability, updating the master file of observations with the latest material statuses.Inventory Management:Collaborated with subcontractors to update the inventory list as needed.Proactively ordered materials to mitigate potential shortages based on current inventory levels.Non-Conformance Report (NCR) Management:Maintained an accurate log of all Non-Conformance Reports (NCRs).Issued NCRs to subcontractors as required, ensuring issues were formally documented and tracked.Conducted weekly meetings with subcontractors to discuss NCRs, focusing on resolving these issues promptly and effectively to maintain project standards and timelines.Material Review and Verification:Worked closely with the engineering team to review materials prior to confirmation, ensuring alignment with project documentation and vendor-supplied documents.Dossier Submission:Prepared and submitted dossiers to clients in accordance with acceptance criteria, ensuring all required documentation met client standards and project specifications. Show less My responsibilities encompassed various tasks, including:• Pre-Inspection & Review: Thoroughly reviewing documentation related to electrical and instrument activities, such as PT (Pressure Transmitters), TT (Temperature Transmitters), lighting, cable laying, and panel installation, to ensure compliance with project specifications and standards.• Punch Point Management: Conducting inspections alongside subcontractors, utilizing the punch procedure categorization (Cat A, B, or C) to document discrepancies and non-conformities (punch points). Coordinating with subcontractors to ensure timely resolution and closure of punch points before proceeding to the mechanical inspection phase with the end user or main client (e.g. Qatar Gas, Adnoc, Zadco, Turkish Petroleum).• Client Coordination: Inviting clients for Mechanical Inspection of Electrical or Instrument activities after successfully closing Cat “A” punch points. Maintaining effective communication with clients to address concerns and provide updates on project progress.• Weekly Meetings: Organizing and chairing weekly meetings with subcontractors to discuss project status, address issues, and minimize observations, deviations, and Non-Conformance Reports (NCRs).• Documentation Management: Working on various documents, including Inspection Test Records (ITR), drawings, Material Requisitions (MR), Material Approval Requests (MAR), and conducting red markup reviews before finalizing as-built. Ensuring all parties involved sign off on these documents.• Dossier Submission: Compiling and submitting project dossiers, ensuring that all necessary documentation is complete and meets project requirements and client expectations.• Quality Focus: Focusing on maintaining construction quality throughout the project to achieve a high standard of workmanship and safety, with the ultimate goal of completing the project without any Lost Time Incidents (LTI). Show less
Quality Manager E&I
Aug 2023 - May 2024Lead Quality Engineer E&I
May 2023 - Jul 2023

Royal Tech Contracting LLC
May 2024 - nowHead Of QAQCThe person is trying to collect data from my LinkedIn profile, which is why I haven't updated this description

Astute Competent Workforce Solutions
Dec 2024 - nowFounder & CEO
Licenses & Certifications

Certified Lean Six Sigma Yellow, Green & Black Belt
IMC InstituteSept 2023- View certificate
.webp)
Basic of project Management
International Business Management Institute (IBMI)Mar 2020 
Computer Operator
Punjab Vocational Training Council OfficialNov 2005.webp)
Professional Certificate Course In Project Documentation And Quality Control
Metropolitan School of Business & Management (UK)Jun 2023- View certificate
.webp)
Critical Thinking For Self Development
Metropolitan School of Business & Management (UK)May 2023 
ISO 45001:2018 - Principles of Occupational Health and Safety Management Systems
The CPD Certification ServiceApr 2023
Lean Six Sigma Yellow Belt Certification
6sigmastudy - The global certification body for six sigma certificationsNov 2016
PMP® Certification Training Course
AUC - Partner in TransformationJun 2021
Lead Auditor _ LA QMS ISO 9001 : 2015
TÜV SÜDFeb 2017
Industrial Electrician
Punjab Board of Technical Education,LahoreNov 2006
Languages
- enEnglish, urdu
Recommendations

Eduardo hortêncio
SEO | Technical SEO Specialist | SEO ManagerCuritiba, Paraná, Brazil
Nicholas cook, p.e.
Division Manager - BTU Production at Bryan Texas UtilitiesBryan Texas Utilities
Ben quine
Co-Founder @ Story House ProductionsBristol, England, United Kingdom
Mansi chaudhary
Senior Analyst at Rio Tinto|Ex KPMG| Semi qualified CA|Kirori mal CollegeGurgaon, Haryana, India
Lynne harmer rapino
Chief Program Officer at Cancer Research InstituteNew York, New York, United States
Muhammed rems iqubal oyalott
Herakles racing | GDSC CET | EETI | IEDC | IEEE | WIE | SIGHT | EMBS | PELS | CS | SAE | Chaturanga ...Kozhikode, Kerala, India
Julia o’ravitz
Vice President of Sales at ADPLa Palma, California, United States
Aashima malhotra
--Mandi, Himachal Pradesh, India
Fernando miralles
enGreater Valencia Metropolitan Area
Amir hossein khayyami
Senior Product Designer at Panco / xAlibaba Travels Co.Tehran, Tehran Province, Iran
Mohammed javeed ali
Technical Lead @ Sopra Steria | DevOps, Kubernetes, GCP.Chennai, Tamil Nadu, India
Hussam abbas, bsc, msc.
Mechanical Power Engineer | HVAC Engineer | BIM Coordinator | Project Manager | Trainer.Homs, Homs Governorate, Syria
Jorge enrique sanchez cadena
Autexa Car Servic at AutexaZapopan, Jalisco, Mexico
Denise brock
Performance Auditor, Oregon Secretary of StatePortland, Oregon Metropolitan Area
Brian keller
Vice President/Senior Systems Engineer at Morgan StanleyGreater Boston
Abhay kumar
Senior Software Consultant at OracleBengaluru, Karnataka, India
Okan kılıç
Civil Engineer M.Sc.Istanbul, Türkiye
Ismail kossir
Auditeur financier stagiaire chez @Deloitte Maroc | Etudiant en M2 PGE , filière audit et contrôle d...Casablanca Metropolitan Area
Lonna hamilton
OTSec Windows Systems Security Specialist at UPSAtlanta Metropolitan Area
Sameer panwar
Engineer at Havells India LtdNew Delhi, Delhi, India
...