Waeel Fegan

Waeel Fegan

Site Mechanical Engineer

Followers of Waeel Fegan6000 followers
location of Waeel FeganJeddah, Makkah, Saudi Arabia

Connect with Waeel Fegan to Send Message

Connect

Connect with Waeel Fegan to Send Message

Connect
  • Timeline

  • About me

    CCG Technical Director

  • Education

    • Al-Mahalla Al-Kobra School

      1988 - 1991
      Secondary school
    • Menoufia University – Faculty of Engineering – Egypt

      1991 - 1996
      B. Sc. Mechanical Power Engineering
  • Experience

    • Multi-National Forces and Observers Camp (M.F.O)

      Mar 1997 - Apr 2001
      Site Mechanical Engineer

      Project title: M.F.O central & remote site power plants Responsible for Maintenance and operation diesel power Plant at south camp of M.F.O. (multi-national forces and observers camp) (Sharm El-Shiekh) - (E.M.D.) power plants, - remote site generators, -switchgear circuit breakers,

    • Blue Lagoon Establishment

      Apr 2001 - Nov 2002
      Site Mechanical Engineer

      Project title: Taif Central Post Office Building Work Included Responsible for operating and maintenance 6 stories building with built up area 2650 square meterIncluding systems i- HVAC System York chilled water system for Tow chiller 215 TR , circulation pumps of primary 430 GPM 90 ft. 7.5 hp , secondary 430 GPM 35 ft. 20 hp.20 , AHU with various capacities 100, 119, 237, 257…300 MBH. & FCU with capacities 42.2 MBH ii- Fire Fighting System Firefighting pump capacity of 750 GPM, 450 ft. head, 150 HP motor , Diesel fire with same capacity and head, Jockey pump with capacity of 75 GPM ,450 ft. head, 5 HP motor, 25 fire hose cabinet , sprinklers, Four Total flooding fire suppression CO2 system 1 cylinder, 150 lbs., capacity , One FM200 composed of 4 cylinders, total capacity 950 lbs. iii- Sanitary Systems Submersible sump pump, composed of two pumps capacity of each pump 80 GPM at 30 ft. head, 2 HPSubmersible sump pump composed of two pumps capacity of each pump 80 GPM at 40 ft. head, 3 HPSubmersible sump pump composed of two pumps capacity of each pump 35 GPM at 40 ft. head, 2 HP. With sewage pipeline and manholes all connected to municipality sewersRain water drainage system with roof drain and road sewers with pipelineiv- Water Supply System Cold water transfer pump water flow rate 35 GPM at 160 ft. head, 3 HPWater Supply booster set composed of two pumps capacity of each 95 GPM, 55 ft. head, 5 HP and a pressure vessel 400 liters’ capacity, v- Irrigation System Irrigation booster set composed of two pumps capacity of pressure vessel 300 liters’ capacity each 40 GPM, 115 ft. head, 3 HP and a KW. عرض أقل

    • Areej Al-Naseem For Contracting And Ac

      Dec 2002 - Jun 2005
      Design & site Mechanical Engineer

      Responsibilities Working on various projects (Mosques, Food services buildings, Stores, workshops, Hospital, villas, Clinics, Cafeteria, Administration building, and Commercial building JOB DUTIES: - install HVAC , the Heating, ventilation and air conditioning requirements of company projects. - Documented all engineering calculations required for the HVAC design using hourly analysis (HAP) and CHVAC Elite programs. -Prepared plans, sketches, equipment schedules, control schematics, sequence of operation, and other design requirements. - Prepared bills of quantity and specifications. -Attended coordination meetings with project proponents and clients as well as inter-disciplinary meetings. - Provided construction supervision support to the projects managed by the company. Involved in the mechanical systems specification writing, shop drawing, as-built drawing and cost estimate of refrigeration and air conditioning (HVAC design based on Carrier E20-II and Elite programs and ASHRAE standards), industrial ventilation (OSHA and ACGIH), plumbing (UPC), fire protection (NFPA), - Planned and coordinated all mechanical engineering requirements of assigned projects. Coordinated with project architects and other engineering disciplines, performing shops, project managers and customers. - Undertook the engineering study, design, specification, cost estimate, material and equipment inspection and acceptance, shop installation drawings, عرض أقل

    • SAUDI BUILDING TECHNIC. CO. LTD. (SBTMC)

      Jun 2005 - Jun 2007
      Senior Project Engineer HVAC /Fire Protection /Plumbing

      JOB DUTIES: I- Reviewed and installed all mechanical systems designs (HVAC, fire protection, plumbing, etc.) of commercial buildings and proposed for construction inside the GPYW sites. II- Coordinated with client architects and designers regarding mechanical systems’ local code requirements and compliance, conducted site inspections and provided technical support to various projects managed by the company. III- installation for HVAC systems IV- installing and operating fire protection system includes fire pumps and combination wet sprinkler and standpipes and plumbing systems for the projects V- shop drawing, as-built drawing for projects mechanical activities.PROJECTS Working on various projects for GPYW and other Clients as detailed below: 1- New Accommodating Buildings For Muzahimia Investigation Department (Ministry of Defense) 2- Bukairya C Club Swimming Pool (General President Youth Welfare (GPYW)) 3- Malaz stadium (general president youth welfare (GPYW)) new facilities building 4- STAFF HOUSING Buildings Extension (Al-imam Moh. Bin Saud University) عرض أقل

    • Saudi Consulting Services. (SAUD CONSULT)

      Jul 2007 - Jan 2012
      Senior Project Engineer HVAC /Fire Protection /Plumbing

      JOB DUTIES: Working as HVAC, Fire Protection, and Plumbing Engineer i. prepared designs of the Heating, ventilation and air Conditioning, documented all engineering calculations required for the HVAC design using hourly analysis (HAP) and Elite programs. ii. Prepared plans, sketches, equipment schedules, control schematics, sequence of operation, and other requirements iii. Prepared bills of quantity and specifications. iv. Involved in the mechanical systems design of the industrial, commercial, institutional and residential projects.PROJECTS Working on various projects for Saudi Aramco and other Clients as detailed below: 1-PROJECT TITLE: UPGRADE SECURITY GATE HOUSES PHASE –VI (Client: SAUDI ARAMCO) upgrading the ARAMCO security gate houses in the Western Region (17 sites in YANBU –MEDINA- ABHA-BAHRA) 2- PROJECT TITLE: King Faisal permanent Campus CLIENT: King Faisal University Perform the design work for the new campus of KFU. The total site area is 2.5 million square meter while the total building area is 570,000 m2 3- PROJECT TITLE: KHURAIS FIELD TRANSMISSION 34.5KV OVERHEAD POWERLINES NETWORK (Client: SAUDI ARAMCO) Perform the design work for the new Transmission line of 24.5 km length for khurais area. 4- PROJECT TITLE: DETAIL DESIGN OF FIVE SCHOOL IN KHAFJI (Client: KHAFJI JOINT OPERATION KJO) Perform the design work for KJO out campus schools. GENERAL ENGINEERING SERVICE FOR COMMUNITY PACKAGE DETAILED DESIGN OF FIVE SCHOOL 5- PROJECT TITLE: DESIGN MAIN BLDG. OF WADI DHAHRAN FOR TECHNOLOGY CLIENT: King Fahd University (KFUPM ) Perform the design work for DHAHRAN TECHNO VALLEY MAIN BUILDING 6 - PROJECT TITLE: SHUBAILY GRAND MALL DESIGN MODIFICATION Perform the design work for SHUBAILY GRAND MALL IN KHOBAR عرض أقل

    • Afniah consultants

      Jan 2011 - Jun 2014
      Head of mechanical department

      JOB DUTIES: “EPCM” projects: The following activities are included: 1) Basic& Detail Design/Engineering Includes the preparation of the required Engineering & Design Packages 2) Contracting The following activities are prepared: Approved Bidder List, Tender Documents (Technical &Commercial), issue Invitation to Bid package (ITB), Respond to Bidder inquiries/Clarifications, Receipt & Evaluation of Bids, Prepare Litter OF Intent (LOI), review advance payment / performance Bonds, Prepare the Contract agreement, Invoicing Works, Project close out. 3) Procurement: Includes almost same activities of above item in addition to preparation of “RFQ,” issue. The inquiry, Prepare the Purchase Order (P.O), Expediting Works, etc. 4) Project Management and Control: Includes Cost Control, Accounting, Scheduling, Project Coordination/Administration, Progress Monitoring and reporting, prepare “ITB” Technical/Commercial documents, Bid Evaluation, etc. 5) Construction Management: Construction Contracting, Planning/Scheduling, Commissioning/Pre-commissioning, Engineering field عرض أقل

    • OSG Contracting

      Jul 2014 - Nov 2018
      Mechanical Department Head

      JOB DUTIES: “EPCM” projects: The following activities are included: 1) Basic& Detail Design/Engineering Includes the preparation of the required Engineering, Design, Shop Drawings & As Built Packages 2) Procurement: The following activities are prepared: Approved Suppliers List, (Technical &Commercial), issue request for quotation (RFQ), Respond to Suppliers inquiries/Clarifications, Receipt & Evaluation of Bids, Prepare Litter OF Intent (LOI), Prepare the Purchase Order (P.O), review advance payment, Prepare the Contract agreement, Expediting Delivery, Invoicing Works, Process close. 3) Project Management and Control: Includes Cost Control, Accounting, Scheduling, Project Coordination/Administration, Progress Monitoring and reporting, prepare “ITB” Technical/Commercial documents, project Evaluation, etc. 4) Construction Management: Construction auditing, Planning/Scheduling, Commissioning/Pre-commissioning. عرض أقل

    • Italconsult SpA

      Nov 2018 - Dec 2019
      Mechanical Section Head KAP5 HO

      KAP 5 (KING ABDULLAH BIN ABDUL AZIZ PROJECT) PROGRAM OF 370 PROJECTS 14 BILLION SAR PROJECT. BELONGS TO MOI (MINISTRY OF INTERIOR) INCLUDING OFFICE BUILDING, BARRACKS, HOUSING, AND LARGE-SCALE DORMITORIES SITES INCLUDING PLAYGROUND, SCHOOLS, RESTAURANTS, GYMNASIUM, OFFICERS AND FAMILY HOUSING. WATER, IRRIGATION, DEEP WELLS, AND SEWAGE TREATMENT PLANTS.JOB DUTIES: • LONG TERM PLANNING TO ACHIEVE THE STRATEGIC GOALS OF THE COMPANY. • CLOSE WORK WITH THE CLIENT (MINISTRY OF INTERIOR) TO COOP WITH THEIR EXPECTATIONS IN ADDITION TO LOCAL AND GOVERNMENTAL AUTHORITIES.• HIRING STRATEGY AND RESOURCE ALLOCATIONS, JOB DESCRIPTION, AND STAFF EVALUATION. • MANAGING AND MOTIVATING A TEAM OF 110 ENGINEERS AND INSPECTORS REGARDING DESIGN, MATERIALS, SUPERVISION, AND CLOSEOUT OF THE PROJECTS. • SCHEDULING DESIGN ACTIVITIES FOR ALL PROJECTS.• PARTICIPATING IN WEEKLY AND MONTHLY PROGRESS MEETINGS FOR THE PROGRAMS.• CODES AND STANDARDS UPDATES. • PARTICIPATING IN PREPARING CONSULTANCY CONTRACT DOCUMENTS, RFPS FOR CLIENTS.• FINICAL AND COST ANALYSIS REPORTS AND FORECASTING. • FEED RISK MANAGER WITH KEY INFORMATION. • PREPARING PROCESS AND PROCEDURES FOR COMPLETING THE DESIGN WORK INCLUDING DESIGN MANAGEMENT PLAN QA/QC FORMS AND CHECKLIST FOR ALL MEP WORKS.• PERFORMING VALUE-ENGINEERING STUDIES FOR ALL MEP SYSTEM WITH THE OVERALL COST REDUCTION OF 5%.• SUBMITTALS APPROVAL, COST MONITOR AND CLAIMS REVIEW.• TECHNICAL SUPPORT AND TRAINING FOR COMPANY ENGINEERS AT SITES AND HEAD OFFICE. • COORDINATION DRAWINGS, LIFE, AND SAFETY REPORT. • APPROVING METHOD OF STATEMENT AND ITPS. • COLLECTING LESSONS LEARNED, FILLING AND SHARING FOR ALL MANAGEMENT LEVELS. INITIATE CORRECTIVE ACTIONS TO ENSURE COMPANY GOALS ARE ACHIEVED. • APPLYING NEW DESIGN SUSTAINABLE APPROACHES LIKE SOLAR COOLING AND LEED PRINCIPLES. عرض أقل

    • TK approved

      Feb 2020 - Feb 2024
      Project Manager
    • Consomity

      Dec 2023 - now
      Technical Director
  • Licenses & Certifications

    • Egyptian Engineering Syndicate membership

      Egyptian Engineering Syndicate
      Jun 1996
    • PMI membership Certificate

      Project Management Institute
      May 2014
    • Saudi Council membership Certificate

      Saudi Council of Engineers
      Apr 2011
      View certificate certificate