Ryan Mefiardhi, CEng, IPM, CMRP

Ryan Mefiardhi, CEng, IPM, CMRP

Laboratory Supervisor

Followers of Ryan Mefiardhi, CEng, IPM, CMRP3000 followers
location of Ryan Mefiardhi, CEng, IPM, CMRPBandung, West Java, Indonesia

Connect with Ryan Mefiardhi, CEng, IPM, CMRP to Send Message

Connect

Connect with Ryan Mefiardhi, CEng, IPM, CMRP to Send Message

Connect
  • Timeline

  • About me

    Electrical Engineer | Reliability & Maintenance | Electrical Equipment in Hazardous Area | Lightning Protection and Grounding | Electrical Safety | Data Science

  • Education

    • Institut Teknologi Bandung

      2021 - 2022
      Engineer's degree Electrical and Electronics Engineering Program Profesi Insinyur
    • Institut Teknologi Nasional (ITENAS)

      1998 - 2003
      Bachelor's degree Electrical Power Engineering
    • Institut Teknologi Bandung

      2003 - 2005
      Master's degree Electrical Power Engineering
  • Experience

    • ITENAS, Basic Physic Laboratory

      Jun 2000 - Jul 2002
      Laboratory Supervisor

      • For 6 semesters, provided valuable academic support to students from diverse departments in introductory physics laboratories.• Guided students through a range of basic physics experiments, ensuring their understanding of concepts and experimental procedures.• Maintained a safe and productive learning environment by actively supervising laboratory activities.• Played a key role in the organization and administration of final examinations, ensuring a fair and efficient assessment process. Show less

    • Lapi Elpatsindo

      Aug 2002 - Dec 2003
      Lightning Protection Engineer

      • Joined the comoany during my final university assignment, gaining valuable hands-on experience under the guidance of my professor.• Began as an operator for The Indonesia Lightning Detection Network (ILDN) remote station, progressing to the role of Lightning Protection Engineer.Key Achievements:• PT Caltex Pacific Indonesia Study: Conducted a comprehensive lightning protection study for the company's 115/44/13.8kV transmission and distribution system. Identified significant production losses (30%) due to lightning strikes. Proposed and implemented a pilot project to improve lightning performance on a 13.8kV feeder by installing line arresters and upgrading the overhead ground wire system.• Diverse Project Experience: Led the design, installation, maintenance, and commissioning of Lightning Protection Systems (LPS) for a wide range of critical infrastructure, including: 1. Badan Meteorologi dan Geofisika's Weather Stations 2. PT Petrokima Gresik LPS re-certification 3. MQ FM Radio, KLCBS Radio, and television broadcast towers 4. Tank farms for Pertamina Unit Refinery VI Balongan 5. Lightning and Electromagnetic Compatibility Study at Peciko Onshore Development Project Phase IV EPSC 3 for Total E&P Indonesie• Data Analysis & Expertise: Developed comprehensive lightning statistics for PT PLN (Persero) P3B Jawa Bali Region Jawa Barat 70kV Overhead Transmission Lines across Bandung Timur, Bandung Barat, Karawang, Purwakarta, Garut, and Cirebon.• Mentorship & Training: Served as an instructor and trainer, sharing valuable project experience and ILDN operating knowledge through workshops and classroom sessions. Show less

    • Laboratory of High Voltage Engineering ITB

      Aug 2003 - Nov 2006
      Academic and Research Assistance

      • Worked closely with Dr. Ir. Reynaldo Zoro, Dipl.-Ing., a renowned professor in the Research Group of Power Engineering, contributing to research, teaching, and professional development programs.• Specialized in lightning protection and detection systems, engaging in research, course development, and continuing education initiatives.• Organized and delivered training programs for various audiences, demonstrating strong pedagogical and organizational skills.• Co-authored research publications with my professor in national and international journals and conferences.Key Projects & Accomplishments:• Organized and conducted a prestigious National Seminar on IEC Standards for Lightning Protection, featuring renowned international experts like Prof. Dr. Christian Bouquegneau (Chairman of IEC-TC 81) and Dr. Gerard Berger (Technical Committee of NFPA 780).• Conducted in-depth lightning performance improvement studies for critical infrastructure, including PLN's 150kV overhead transmission line and 20kV overhead distribution lines.• Led the design, installation, maintenance, and commissioning of Lightning Protection Systems (LPS) for a diverse range of projects, including: St. Borromeus Hospital, PT Indosat Base Transmission Station Ciater, Pasir Ridge for Chevron Indonesia Co., Total E&P Indonesie, PT Berau Coal Lati Office and telecom tower and PT Semen Gresik Tbk Main Office Show less

    • PT Zeus Prima Garda

      Jan 2004 - Oct 2006
      Lightning Protection Engineer

      • Served as a dedicated Lightning Protection Engineer, specializing in the design, installation, and maintenance of Lightning Protection Systems (LPS) for a diverse range of projects.• Successfully executed numerous LPS projects, including critical infrastructure such as: 1. CNOOC SES Ltd onshore and offshore facilities 2. Total E&P Indonesie gas Terminal Receiving Facility and Condensate tank farms 3. Kufpec Indonesia Ltd Oil tank farms, production, and loading facilities 4. Kalianda Resort PT Krakatau Lampung Tourism Development 5. Blue Bird Taxi Training Center 6. PT Citra Sari Makmur Micro Earth Station in Cikarang• Possess strong project management skills, leading teams of technicians for installation, commissioning, and maintenance of LPS systems.• Contributed to knowledge sharing by organizing and instructing lightning protection courses, covering fundamental principles, grounding techniques, and preventive maintenance through practical experiments. Show less

    • Bp

      Nov 2006 - Sept 2024

      Reliability Squad Lead & Discipline Lead. • Successfully immersed a strong reliability culture across the organization, fostering a balanced approach to safety, production, and reliability.• Led a high-performing, multidisciplinary squad comprised of reliability engineers, discipline engineers, material/spare parts analysts, and operations specialists.• Developed and implemented innovative maintenance strategies utilizing FMEA, RBM, RCM, and bad actor defect elimination techniques to significantly improve equipment reliability, PM frequency optimization and reduce downtime.• Conducted in-depth vulnerability studies and led thorough Root Cause Failure Analyses (RCFAs) to proactively identify and mitigate potential risks.• Spearheaded the digitalization of maintenance and production data, enabling data-driven decision-making and improving operational efficiency into home made Asset Performance Management (APM) and Asset Health Management (AHM).• Successfully deployed and implemented maintenance strategies within SAP PM for the Train 3 project, ensuring smooth and efficient operations.• Optimized condition monitoring data to enhance reliability, improve equipment performance, and provide valuable insights for effective decision support. Show less • Led a multidisciplinary Production Management squad comprising Well Integrity Engineers, Petroleum Engineers, and Process Engineers, driving production optimization across four critical choke points: reservoir, wells, plant, and export.• Successfully delivered production enhancements by streamlining workflows and eliminating waste through the implementation of digital solutions.• Leveraged big data analytics by integrating production reports, plant operating parameters into Palantir, enabling data-driven decision-making and improved operational efficiency.• Developed and maintained key performance indicators (KPIs), including deferral and vulnerability metrics, as well as flaring and emissions dashboards within Power BI, providing valuable insights for operational monitoring and environmental compliance.• Successfully implemented Scrum methodology as Product Owner, ensuring agile delivery of projects and continuous improvement within the squad. Show less • Oversaw operational risk management, production efficiency, and optimization of 2x3.8 MTPA LNG plant.• Proactively managed plant vulnerabilities and conducted root cause failure analyses to identify and mitigate potential operational issues.• Led cross-functional planning integration, ensuring alignment across departments and approving all technical changes, including risk assessments, shutdown/startup sequences, and control of work procedures.• Successfully led the regional implementation of Control of Work (COW) procedures and the electronic Control of Work (eCOW) tool.• Delivered two successful Plant Turnarounds (TAR 9 & 10) ahead of schedule, overseeing all technical changes and ensuring safe and timely completion, including a major DCS upgrade.• Contributed significantly to plant de-bottlenecking projects, including Advance Process Control (APC), Acid Gas Removal Unit Revamp, and Water Mist for Air Fan Coolers, resulting in a 2% increase in LNG production in 2020.• Successfully deployed the Operator Work Bench for Tangguh Operations, enhancing operational efficiency by digitizing operator rounds, basic care, and quality control certifications, leading to a 1.5-day reduction in work time during TAR 9 and 10.• Achieved the highest conformance to the company's Operating Management System for Control of Work in 2019.• Exceeded LNG production targets in 2020 while maintaining high operational efficiency, even in a year with a planned Turnaround.• Championed improved activity scheduling stability and attainment by leading the integration of Primavera (scheduling), SAP PM (planning), and eCOW (Control of Work) systems, utilizing a Back Log Management tool. Show less Electrical Maintenance Specialist• Championed Electrical Safety: Custodian of company's Electrical Safety Procedures. Ensured compliance across all authorization levels of Isolation Authorities by implementing robust procedures and conducting regular competency assessments.• Enhanced Safety Culture: Led electrical safety behavioral conditioning programs and delivered targeted training initiatives, significantly reducing plant interruptions due to human error.• Streamlined Maintenance Processes: Played a key role in the successful transition to a CMMS from Maximo to SAP PM, optimizing maintenance strategies and task lists. Spearheaded the transition from paper-based permits to an e-Control of Work system, improving efficiency and safety.• Technical Expertise & Problem-Solving: Provided critical technical support to Maintenance Team Leaders, specializing in complex electrical maintenance activities. Developed and implemented effective method statements and task risk assessments. Demonstrated strong analytical and problem-solving skills through successful troubleshooting and RCA of critical equipment failures, minimizing downtime.• Proven Track Record of Success: Successfully led and supervised the execution of major maintenance projects, including PM of 0.4/6.9/11kV switchgears, turbo expander & converter module replacements, transformer and MV motor PMs, and critical equipment overhauls (35MW 11kV STG, 2.3MW 6.9kV EDG).Key Achievements:• Successfully transitioned to a new CMMS and Control of Work system with minimal business disruption.• Significantly improved electrical safety performance through targeted training and behavioral conditioning.• Minimized equipment downtime through rapid and effective troubleshooting and RCA.• Consistently delivered high-quality maintenance services on time and within budget. Show less • Provided critical electrical engineering expertise in day-to-day plant operations, major equipment maintenance, and technical change management.• Successfully managed technical queries, developed and updated maintenance strategies, conducted root cause analyses (RCA), and actively managed the removal of electrical vulnerabilities. Key Achievements:• Project Delivery: Successfully delivered a $2.4M Power Supply project to PLN, involving the construction of a 4MW power plant for surrounding communities and villages. Key responsibilities included: 1. Modification of existing 33kV switchgear. 2. Installation of a new 33kV prefab substation with MV switchgear, 110Vdc battery charger, LV switchboard, converter, and power cables. 3. Project management, coordination with the Production team and Reliability & Maintenance, ensuring safe, timely, and budget-conscious completion. 4. Recognized with an award from the Vice President Tangguh Operations for outstanding project management and coordination.• RCA & Corrective Actions: 1. Led the RCA investigation into two significant generator trips caused by loss of excitation relay in 2014, resulting in significant production losses. Successfully implemented corrective actions, eliminating these incidents since 2015. 2. Investigated repetitive failures of 33kV voltage transformers (VTs) since 2009, identifying ferro-resonance as the root cause. Led the implementation of modifications, replacements, and verification procedures, significantly reducing VT failures and improving power system stability. • Mentorship & Development: 1. Successfully mentored and developed junior engineers, ensuring timely completion of their 3-year Engineering development program. 2. Recognized by the VP Tangguh Operations for effective mentorship, training, and development, with one of the mentees receiving the prestigious 2015 BP Tallow Chandlers Award. Show less • Served as a front-line engineer, responsible for daily surveillance of critical electrical equipment parameters and providing technical recommendations to Operations and Maintenance Departments.• Provided expert electrical engineering support, addressing technical queries, conducting risk assessments, and performing preliminary root cause analyses of plant upsets.• Supervised the execution of electrical modification projects within TAR 1/2/3. Key Achievements:• Enhanced Ex Equipment Safety: Improved the Ex equipment maintenance strategy, addressing significant gaps identified during maintenance audits. Developed and implemented a robust maintenance strategy, including equipment registers, sampling inspection procedures, and a comprehensive training program for technicians on Ex equipment inspection. This resulted in a significant reduction in Ex-related incidents and improved plant safety.• Delivered Sustainable Power Supply: Successfully delivered a USD 4.3M project to provide permanent power supply to the plant camp, replacing diesel generators with a reliable grid connection. Key deliverables included: 1. Installation of a new 33kV circuit breaker, 33kV & 6.9kV switchgears, power transformers, battery chargers, annunciators, and LV switchboards. 2. This project significantly reduced reliance on diesel generators, contributing to a greener and more sustainable operation. 3. Notably, this project contributed to BP receiving the prestigious Green PROPER award from the Ministry of Environmental and Forestry of Indonesia in 2018, recognizing the company's environmental performance. Show less • Successfully delivered critical projects within the ONWJ business unit, focusing on enhancing safety and operational efficiency at offshore oil and gas process facilities.• Played a key role in the Java Rehabilitation Project, successfully upgrading 30-year-old manned facilities to meet stringent modern process safety standards.1. Spearheaded the replacement of severely corroded electrical conduits and cables at offshore flow stations, ensuring safe and reliable operations.2. Led the installation and commissioning of a vital weather station at Lima Flow Station, providing crucial early warning systems to personnel regarding potential platform subsidence due to severe weather conditions.3. Designed and implemented significant upgrades to the Fire & Gas (F&G) and Suppression systems at Uniform Flow Station, enhancing safety and mitigating potential risks.4. Developed and conducted comprehensive Operational Risk Assessments for all producing offshore Normally Un-Attendant Installations (NUI) within ONWJ, collaborating closely with discipline engineers and technicians to ensure site safety and compliance. Show less

      • Maintenance Leadership

        Apr 2022 - Sept 2024
      • Operations Leadership

        Apr 2021 - Mar 2022
      • Operations Support Team Leader

        Jul 2018 - Mar 2021
      • Responsible Electrical Person

        Jul 2016 - Jun 2018
      • Electrical Engineer Team Leader

        Jan 2012 - Jun 2016
      • Electrical Engineer

        Jul 2009 - Dec 2011
      • Electrical Engineer

        Nov 2006 - Jun 2009
    • Aramco

      Oct 2024 - now
      Senior Engineer
  • Licenses & Certifications

    • Ahli K3 Spesialis Listrik

      Kementerian Ketenagakerjaan RI
      Jan 2021
    • Insinyur Profesional Madya

      PII
      Sept 2016
    • Energy Management - Energy Manager on Industry

      Badan Nasional Sertifikasi Profesi (BNSP)
      Aug 2022
    • Insinyur Profesional Madya

      Persatuan Insinyur Indonesia
      Feb 2022
    • Certified Maintenance and Reliability Professional (CMRP)

      SMRP
      Jul 2024
    • Chartered Engineer

      Institution of Engineering and Technology (IET)
      Mar 2021
    • Google Data Analytics

      Google
      Apr 2023
    • Surat Tanda Registrasi Insinyur (Certificate of Engineer Registration)

      Persatuan Insinyur Indonesia
      Nov 2020
    • CompEx

      JTL Limited
      Jul 2017
    • CompEx

      JTL Limited
      Jul 2011
  • Honors & Awards

    • Awarded to Ryan Mefiardhi, CEng, IPM, CMRP
      Service Award 10 Years BP Indonesia Nov 2016
    • Awarded to Ryan Mefiardhi, CEng, IPM, CMRP
      Spot Recognition Award BP Berau Ltd., VP Operations Jul 2016 Successfully execute TAR 7
    • Awarded to Ryan Mefiardhi, CEng, IPM, CMRP
      Spot Recognition Award BP Berau Ltd., VP Operations Nov 2015 Regular and effective mentoring, coaching and support to BP Junior engineers, whom one of them won the BP Tallow Chandlers Awards in 2015
    • Awarded to Ryan Mefiardhi, CEng, IPM, CMRP
      GOO Workshop Appreciation Award Category One Team BP Berau Ltd., VP Operations Sep 2015 Contribution that reflects commitment to BP Value and Behavior and gives significant impact to the company, by demonstrate good interface with Production and R&M team during PLN Project in Bintuni area and electricity vulnerabilities elimination in Tangguh LNG Plant
    • Awarded to Ryan Mefiardhi, CEng, IPM, CMRP
      Spot Recognition Award BP Berau Ltd., VP Operations Jul 2015 Successfully execute TAR 6
    • Awarded to Ryan Mefiardhi, CEng, IPM, CMRP
      Spot Recognition Award BP Berau Ltd., Engineering Support Manager Nov 2014 Contribution to TAR 5 execution on time without any safety incident and LOPC event
    • Awarded to Ryan Mefiardhi, CEng, IPM, CMRP
      Service Award 5 Years BP Indonesia Nov 2011
    • Awarded to Ryan Mefiardhi, CEng, IPM, CMRP
      Best Graduate Student and Graduate with Honors (Cum Laude) Rector, Institut Teknologi Nasional May 2003
  • Volunteer Experience

    • Committee

      Issued by Power Engineering Research Group, STEI ITB on Feb 2006
      Power Engineering Research Group, STEI ITBAssociated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Committee

      Issued by Laboratory of High Voltage Engineering, STEI ITB on Sept 2006
      Laboratory of High Voltage Engineering, STEI ITBAssociated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Committee

      Issued by ITB, UDAYANA & IEEE – DEIS on Jun 2006
      ITB, UDAYANA & IEEE – DEISAssociated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Committee

      Issued by Power Engineering Research Group, STEI ITB on Feb 2006
      Power Engineering Research Group, STEI ITBAssociated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Trainer

      Issued by (PT PLN (Persero) P3B Jawa Bali, Region Jabar, UPT Bandung Timur and Lab. High Voltage Eng ITB on Dec 2005
      (PT PLN (Persero) P3B Jawa Bali, Region Jabar, UPT Bandung Timur and Lab. High Voltage Eng ITBAssociated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Keynote Speaker

      Issued by PT Melvar Lintasnusa and Lab. High Voltage Engineering ITB on Jun 2005
      PT Melvar Lintasnusa and Lab. High Voltage Engineering ITBAssociated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Committee

      Issued by Lab. High Voltage Engineering ITB and Lab. of Physics of Gases and Plasmas Paris University - CRNS on Mar 2005
      Lab. High Voltage Engineering ITB and Lab. of Physics of Gases and Plasmas Paris University - CRNSAssociated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Trainer

      Issued by PT Kiani Kertas and PT Zeus Prima Garda on Oct 2004
      PT Kiani Kertas and PT Zeus Prima GardaAssociated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Trainer

      Issued by PT PLN (Persero) UDIKLAT Semarang and Lab. High Voltage Engineering ITB on Jun 2004
      PT PLN (Persero) UDIKLAT Semarang and Lab. High Voltage Engineering ITBAssociated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Committee and Trainer

      Issued by PT Zeus Prima Garda, on Jan 2004
      PT Zeus Prima Garda,Associated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Trainer

      Issued by PT PLN (Persero) UDIKLAT Semarang and Lab. High Voltage Engineering ITB on Jun 2003
      PT PLN (Persero) UDIKLAT Semarang and Lab. High Voltage Engineering ITBAssociated with Ryan Mefiardhi, CEng, IPM, CMRP
    • Committee and Trainer

      Issued by PT Lapi Elpatsindo on Aug 2002
      PT Lapi ElpatsindoAssociated with Ryan Mefiardhi, CEng, IPM, CMRP