Greg Calig,  PEE

Greg Calig, PEE

ENGINEER -III

Followers of Greg Calig,  PEE753 followers
location of Greg Calig,  PEECalabarzon, Philippines

Connect with Greg Calig, PEE to Send Message

Connect

Connect with Greg Calig, PEE to Send Message

Connect
  • Timeline

  • About me

    SENIOR ELECTRICAL ENGINEER at BRUNEL - ESSO EXPLORATION CHAD INC.

  • Education

    • ATENEO COMPUTER TECHNOLOGY CENTER

      1984 - 1984
      Computer Basic EDP Concepts
    • FEATI UNIVERSITY, PHILIPPINES

      1973 - 1978
      BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING ELECTRICAL ENGINEERING LICENSED PROFESSIONAL ELECTRICAL ENGINEER

      Activities and Societies: SENIOR MEMBER OF INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERS OF THE PHILIPPINES (IIEE) Graduated in Bachelor of Science in Electrical Engineering in 1978 and passed the following Government Examinations:Professional Electrical Engineer Board Examination in Sept. 1984Associate Electrical Engineer Board Examination in Oct.1983 (Third Place)Assistant Electrical Engineer Board Examination in Sept. 1979

  • Experience

    • CONSTRUCTION & DEVELOPMENT CORPORATION OF THE PHILIPPINES (CDCP)

      Jun 1979 - Dec 1983
      ENGINEER -III

      PROJECT EXPOSURE:a. Manila International Airport Development. Project Electro-Mechanical Works (1979-1981)b. Magat River Dam Multipurpose Project Power Phase (1981-1982)c. Manila International Port Terminal Terminal Compound & Building Offices (1982-1983)d. Tagaytay-Batangas Road Project (1983-1984)e. Light Railway Transit Project (1984-1985)f. Subic Naval Base Riviera Wharf and Fleet Exchange Mall(1986) United States Naval Base, Subic Bay, Philippines CDCP and PNCC (from June 1979 to December 1986)I. Office Engineering-Responsible for preliminary studies, evaluation, survey of the projects to be undertaken during the planning stage. System analysis, short circuit calculation, ground fault determination & computation, power factor correction, voltage drop calculation during the design of the power distribution system of the buildings, crushing, batching and asphalt plants. Selection of different electrical equipment suitable to the electrical projects’ requirements conforming to the PEC, NEC, ANSI, and IIEE.-Responsible for the design, planning and approval of the electrical power distribution system for the commercial and high rise building with appropriate illumination levels, air conditioning loads and ventilations.II. Field Engineering-Supervision of electrical roughing-in for signal, power & lighting installation in accordance with the approved construction drawings and PERT-CPM schedules. Building wiring installation, testing of switchgears & low voltage switchboards, electrical panel board, lighting fixture installation, safety switches and wiring devices.-Supervision of inspection, testing and approval of complex electrical installation prior to commissioning of construction plants, such as batching, crushing and conveying system) and electrical works. Ensure that the electrical works are completed in compliance with the correct specifications, approved drawings and good workmanship. Show less

    • PHILIPPINE NATIONAL CONSTRUCTION CORPORATION (PNCC)

      Jan 1984 - Dec 1986
      ELECTRICAL ENGINEER III

      SEE JOB RESPONSIBILITIES IN CONSTRUCTION AND DEVELOPMENT CORPORATION OF THE PHILIPPINES (DUE TO CHANGE IN CORPORATE NAME)

    • BINLADEN ELECTRICAL & MECHANICAL COMPANY

      Mar 1987 - May 1990
      ELECTRICAL ENGINEER

      PROJECT EXPOSURE ABROAD: (1987 TO 1990) Project No. of Bldgs.. Installed Capacitya. Sheik Bakr Binladen 14 4.5 MVA Villa-Obhorb. Royal Saudi Air Defense Bldg. 2 2.5 MVAc. King Fahad Al Salam 5 2.5 MVA Palace-Ext. Jeddahd. Prince Sultan Bin Abdulaziz 61 15 MVA Beach Palace Thowale. Prince Abdullah Villa-Obhor 2 2 MVAf. Prince Sultan Villa-Jeddah 6 2 MVAg. Prince Abdullah-Al Hasa 14 2.5 MVAh. King Fahad, Makkah Hotel 1 8.5 MVA -MeccaResponsible for the projects’ electrical engineering activities such as the following:-Underground electrical power distribution system design review short circuit calculation for the high rise buildings, palaces and villas conforming to the National Electrical Code (NEC) using computer and AUTOCAD. - Review electrical power distribution design and prepare shop drawings for different projects in coordination with architectural, mechanical, structural, interior decorator and other trades to the specifications such as : *Lighting system, call system, parking & access system, lightning protection system, grounding system, external lighting, low current system, CCTV system, Normal power system for HVAC, standby power system, MATV distribution system, fire alarm system.-Prepare electrical specifications-Equipment material selection-Technical submital-Preparation of bill of materials-Quantity material take-off-Technical coordination with consultants-Project planning & coordination-Cost and quantity control-Project Reporting-Electrical design works with AutoCAD Rel. 10- Show less

    • PHILIPPINE GEOTHERMAL INCORPORATED

      Oct 1990 - May 1993
      SENIOR ELECTRICAL ANALYST

      TIWI GEOTHERMAL 330 mW Power Plant and its Steam Gathering System and other Electrical/Instrumentation Process Facilities 1993)-Responsible for the company’s electrical, instrumentation engineering works for the STEAM GATHERING SYSTEM of the 330 mW Tiwi Geothermal Power Plant surface facilities expansion as follows: *Brine Injection System and Steam Wash Facilities - project planning & studies, electrical power distribution system design for the brine injection system for 5-400HP., 3Ph, induction motors, 4,160 V., utilizing medium voltage switchgear, and distribution transformer. Design the electrical and instrumentation (electronic & pneumatic) control system, budget preparation & control, requisition of materials, supervision & project management of electrical works being done by contractors and its testing & commissioning. *Throttling Facilities- project planning, electrical design of underground power distribution system, supervision of the installation of motor drives for the remote opening and closing of the main production valves of well heads of the steam gathering system at different well sites, satellite station and plant stations. These throttling facilities use LIMITORQUE DRIVES and MOTOROLA modular remote terminal units (MRTU). *Preparation of Piping & Instrument Diagrams (P & ID) & instrument loop diagrams for the steam gathering, pumping & injection system in accordance with ISA-S5.4-1989 Standard. The process instrumentation and controls of the steam gathering system for geothermal power plant include the following: sensors, transducers, recorders, computers, pressure indicators, temperature indicators, level transmitters, electrical and pneumatic controls, valves, totalizers, level indicator controller, level transmitters.-Conduct Hazard and Operability Study (HAZOP) on all electrical and mechanical capital projects in order to evaluate health and safety loss prevention related to project execution. Show less

    • ASEA BROWN BOVERI SAE SADELMI

      Aug 1993 - Aug 1995
      SENIOR ELECTRICAL ENGINEER

      -Responsible for the review and check the electrical power distribution system design and the cathodic protection of the whole power plant prior to erection and installation. Propose design changes and prepare construction details to suit field requirements in coordination with civil, mechanical and other technical trade.-Responsible for the preparation of detailed electrical grounding shop drawings for 400kV and 132kV power transformer substation as follows: 2- 275 MVA Interbus Transformer 6- 175 MVA Generator Step-up Transformers 6- 20 MVA Unit Transformers 3- 80 MVA Desalination Transformers 3- 80 MVA Station Transformers 18-3.2 MVA Auxiliary Transformers-Responsible for the preparation of grounding shop drawings for the following:Gas insulated substation (GIS), MV Switchgears, 15 kV and 400 kV insulated phase bus ducts, power cables, 31 nos. 1.1 to 3.1 MW medium voltage motors of sea water pumping station and 3 x 3.1 standby “Wartsila” generators.-Responsible for the design of the cable ways and prepare cable routing schedule. Design & prepare shop drawings power plant grounding system.-Prepare 110V and 24V. D.C power distribution system and battery layout and installation details.-Prepare shop drawings for AC electrical power distribution for lighting and power of Class-1, Div. 1 & 2 hazardous area of the power plant such as: Fuel unloading station high and low pressure gas reducing station battery roomsElectrical design conform to NFPA and API recommended practice 500 (RP500) & RP 14F.-Prepare quantity material take-off and ordering of electrical materials.-Assist in the equipment erection and pre commissioning of the electrical installation of the power plant. Show less

    • OXBOW POWER SERVICES INC

      May 1996 - Aug 1999
      ASSISTANT CONSTRUCTION MANAGER

      53 MW Mindanao-1 Geothermal Power Plant and 48.25 MW Mindanao-2 Geothermal Power Plant on Build Operate & Transfer Scheme (BOT) Projects-Work hand in hand with the American expatriate Construction Manager on the project/construction management, for the safe and timely construction completion of BOT, Engineering, Procurement and Construct (EP &C) Projects. - Project scheduling, monitoring, cost and quality control of construction, evaluate contractor’s billing & payment, and prepare monthly construction progress management report.-Oversee contractor's performance of the work to ensure that it is executed safely, within budget, on schedule, compliance per design requirement and contract specifications. -Oversee/Witness contractor power plant electrical equipment testing and commissioning per National Electrical Testing Association Standard "NETA".and approved procedures on 13.8kV & 4.16kV switchgears & other electrical equipment, cables insulation resistance & hipot testing, circuit breaker electrical & mechanical operation tests, sequence operation test per approved logic, protection circuits checkout for breaker tripping and checkout DCS/SCADA indication & alarms, loop check, control function check, function matrix tests, meter & protective relays calibration & functional testing, energization of 13.8 kV/ 4.16 kV, 0.48 kV switchgear, MCC, coupled & uncoupled runs of 480 Volts motors/movs, back feed & synchronization to national grid up to final commissioning of the whole electrical system & power plants. -Interfacing and technical coordination with client (PNOC, NPC), consultants, contractors & sub-contractors regarding construction activities per contract agreement. - Power plant inspection, punch listing, check switching procedures/orders for 13.8 kV generator safe power plant start-up, back feed and synchronization to National Power Corporation 138 kV switch yard, and power plant performance testing. Power plant turn over to the operations group. Show less

    • SAUDI ARABIAN BECHTEL COMPANY

      Mar 2000 - Apr 2003
      SENIOR START UP ENGINEER-I

      SENIOR START UP ENGINEER (PERFORMED FUNCTION AS TAGGING PERMIT SUPERVISOR & OPERATIONS STARTUP SHIFT ENGINEER). Responsible for the isolation and safety tagging for safe startup works of the project that consist of the following:- 5 x 1.6 mpph oil fire boilers- 5 x 116mW back pressure steam turbine- 10 x 10 mgpd desalination units- 380 kV gas insulated switchyard (GIS)- fuel oil handling and storage- water treatment plant- filtration, storage and associated utilities-Responsible for the issuance, closure of Safety Permits (for electrical and mechanical) under Bechtel System and Equipment Safety Tagging/Lockout Procedure SWPP 4MP-T81-1307; Startup Work Authorization (SWA), Limitation of Access Permits, in support for safe startup work of the project. Causes required safety mechanical and electrical isolations, switching to be established prior to the commencement of electrical and mechanical works, testing, commissioning of system or equipment. Restore the system or equipment to safe configuration after completion of startup works. Advises, consults, coordinates with other startup engineers, construction personnel responsible for the equipment or system affected by any safety permit and other startup works. Coordinates with Operations Supervisor or Shift Engineer when tagging out system that could affect the operation of the system affected by any safety permit and other start up works.Duties and Responsibilities (As Operations Startup Shift Engineer)-Support safe power plant startup & commissioning, operation, maintenance and functional testing activities, reliability and performance testing consistent with the project schedule for early turnover to the client.-Work on closure of electrical and mechanical punch list items, work defects and warranty issues. Show less

    • SIRPI ALUSTEEL CONSTRUCTION LIMITED-OIL

      Jan 2004 - Jan 2005
      ELECTRICAL COMMISSIONING ENGINEER

      CHEVRON –TEXACO NIGERIA LIMITEDOKAN (Oil & Gas) PRODUCTION PLATFORM FINAL UPGRADE PROJECT (From 75,000 to 100,000 barrels/day)Offshore Escravos, Nigeria-Review & check of electrical drawings for new and upgrade facilities.-Prepare and implement required electrical test procedures, switching procedures/ switching orders for low voltage, 240/480 Volts, and medium voltage 4.16 kV.-Prepare calibration and test equipment requirements.-Prepare pre commissioning/commissioning Check Records (CR- A & B) & dossiers per Chevron Texaco Standards.-Organization and execution of field electrical and instrumentation calibration and loop checking. Support instrumentation group during checkout, calibration, functional testing & commissioning of instruments-Develop pre commissioning and commissioning electrical check out schedule to meet the required completion sequences.-Provide input in the project progress control system (PCS) as work is completed.-Develop level 4 pre commissioning & commissioning electrical schedule to integrate with system based construction schedule.-Develop manpower requirements to support electrical pre commissioning and commissioning activities.-Trouble shooting and resolution of electrical problems during pre commissioning & commissioning.-Support testing & energization of electrical equipment (4.16 kV/480V MCC, Motors, Controllers, ATS, UPS, 4.16 kV-480 V Transformers, Cables, etc), uncoupled and coupled runs of motors. -Work closely with field engineering to resolve conflict in drawings and to assure correct electrical functionality.-Monitoring of all changes and incorporation of approved changes into the electrical “as built” records.-Support development of HSE plan and strategy to address safe energization & commissioning operations.-Liaise with other groups as necessary to complete functional testing of platform electrical and instrumentation equipment to meet commissioning sch Show less

    • NES-BECHTEL SINOPEC FOSTER & WHEELER (BSF) CHINA COMPANY LIMITED

      Feb 2005 - Jul 2005
      ELECTRICAL COMMISSIONING ENGINEER

      - Electrical checkout & functional testing of 380 volts motor controllers and restart relay function (for single & 2-speed motors) via RCU, DCS & ABB Insum MMI Controller, and Instrument Protection System (IPS) through interposing relay panels (IRP). - Electrical checkout, current injection & functional testing of 6kV volts motor controller through RCU, DCS & ABB REF 542 plus MMI controller, Instrument Protection System (IPS). -Electrical checkout, current injection & functional testing of 6kV transformer controls through RCU, DCS & ABB REF 542 plus MMI controller, Instrument Protection System (IPS). Normal and emergency 6kV-380Vtransformers, switchboard energization and testing of common alarms.-Electrical checkout & functional testing of 380 volts electric air heaters, trouble shooting and energization of equipment.-Electrical checkout and functional testing of 380 volts heat tracing system.-Trouble shooting and resolution of electrical problems during pre commissioning & commissioning.-Work closely with vendors resolve conflict in drawings and to assure correct electrical functionality.-Monitoring of all changes and incorporation of approved changes into the electrical “as built” records.- Verify correct protective relay settings per relay setting schedule.- Uncoupled and coupled motor runs.- Update the commissioning manuals after testing and to make it ready for ready for startup (RFSU).- Provide input in the project progress control system (Win PCS) as work is completed. Show less

    • PARSONS FLUOR DANIEL -FLUOR MIDDLE EAST LIMITED

      Aug 2005 - May 2007
      ASSSISTANT ELECTRICAL SUPERVISOR

      -Work hand in hand with expatriates Electrical Superintendents on the project’s electrical construction management, for the safe, timely construction completion of the electrical works of the Second Generation Project‘s in Utilities & Sulphur Areas.-Coordinate with contractor for the installation of electrical equipment such as the MCCs, MDBs, Transformers, UPS, Chargers, Batteries, HVAC, Cathodic Protection, Fire and Gas, Heat Tracing, Telecom, lighting fixtures, small power socket outlets, cable pulling and termination of 660V, 380V LV cables, 10kV HV cables, instrument cables per the electrical/instrument drawings and specifications for hazardous areas. -Electrical works progress monitoring, quality assessment of electrical construction per approved drawings & specifications, evaluate contractor’s construction progress. Interfacing, technical coordination and technical support with Contractor & sub-contractors regarding construction activities per approved construction drawings, specifications and contract agreement.-Support contractor for needed updated or revised construction and vendor drawings from PROARC. Provide necessary construction documents from CompleteIt data base to hasten construction progress.-Attend Daily,Weekly coordination meetings with contractor to meet the construction milestone.-Review contractor’s work progress against required construction schedule and milestone. Coordinate with schedulers for the progress input and schedule.-Participate in electrical works MC walk downs,punch listing for input to CompleteIt Win PCS.-Regular construction work inspection, punch listing, construction coordination with contractor (SK) to complete electrical works ready for the pre commissioning.-Liaise with the Engineering and other groups to coordinate and reply Request for Information (RFI) for technical inquiries and documents updates and materials. Show less

    • BRUNEL ENERGY INC. - ESSO EXPLORATION PRODUCTION CHAD INC.(EEPCI)

      Jun 2007 - Mar 2015
      SENIOR ELECTRICAL ENGINEER

      A Senior Electrical Engineer (Performed Work Function as Turn Over and Acceptance Advisor/ Coordinator & Remote Oil Field Operator) with the following duties & responsibilities:-Perform shop testing of Progressive Cavitation Pumps & Electric Submersible Pumps (Wood Group/General Electric Vector 3, 4 & 7 and Schlumberger FACTPAC Artificial Lift Remote/ Automatic Control Drives prior to oil field installation.-Attend Turnover & Acceptance (TOA) walk through for different wells.Conduct Pre Start-up Safety Review (PSSR) prior to start-up.-Site function testing of loops, verification of all trips & alarms from Artificial Lift Field Drives Controller SCADA to Control Room DCS screen via radio or fiber optic link for more than 1,000 Wood Group/ General Electric Oil and Schlumberger Artificial Lift Remote/ Automatic Control System Oil Well Drives Controllers. Checkout of status & analog points prior to initial start-up of different wells: New infill, LK gas, Water injection, Monitoring and Power Dump Flood (PDF), swap out/conversion Oil Wells -Perform valve line up from Well Head Christmas Tree to Rotary Selector Valves (RSV) at manifold side, perform safe start up, motor rotation checks, put on line & commission.-Perform oil field inspection and trouble shooting, field calibration checks and minor repair of Honeywell & Rosemount Flow Line Smart and Well head Hart transmitters using Smart Communicator and 375 Hart Communicator.-Provide support to Operations Group for isolation/deisolation of power supply before & after rig work over.-Coordinate /support trouble shooting works on Honeywell's system for Oil Well's SCADA and Artificial Lift Remote Controllers & radio communication problems for different site Artificial Lift controllers.-Perform inspection, trouble shooting, PT calibration & perform safe start -up of oil well till it is back on line.-Work on Turn over Documentations works for sign off for final turn over and acceptance to Operation Group. Show less

  • Licenses & Certifications

    • Licensed Associate Electrical Engineer

      Professional Regulation Commission-Philippines
      Oct 1983
    • Licensed Assistant Electrical Engineer

      Professional Regulation Commission-Philippines
      Sept 1979
    • Licensed Professional Electrical Engineer

      Professional Regulation Commission-Philippines
      Sept 1984