Abdul Saquib,  PMP®

Abdul Saquib, PMP®

Mechanical Engineer

Followers of Abdul Saquib,  PMP®253 followers
location of Abdul Saquib,  PMP®Jubail, Doğu Bölgesi, Suudi Arabistan

Connect with Abdul Saquib, PMP® to Send Message

Connect

Connect with Abdul Saquib, PMP® to Send Message

Connect
  • Timeline

  • About me

    Construction Manager at AYTB

  • Education

    • K B N College of Engineering, GULBARGA

      2003 - 2008
      Bachelor's degree Mechanical Engineering
    • Visvesvaraya Technological University

      2005 - 2009
      Bachelor of Engineering - BE Mechanical Engineering 60
  • Experience

    • Larsen & Toubro

      Mar 2008 - Apr 2009
      Mechanical Engineer

      ❖ Reviewing the SOW to clearly understand the job and explain it to the entire team related to that scope.❖ Assign duties and responsibilities & ensuring that teams are uniformly balanced with available resources❖ Responsible for the installation of Steam and Naphtha reflux piping for condenser and distillation column in VBU unit❖ Reinstatement of utility water and fire water lines of DHT compressor area.❖ Conduct field inspection like fit up, valve installation, correct rating flange, and parallelism of flange, alignment and direction of non-return valve, check valve.❖ Erection of various static equipment’s below 50 Tons.❖ Awareness to supervisor about priority test packages, materials arrangement and equipment/machines required to finish it in schedule.❖ Preparing priority line list & spool list for fabrication and painting as per site conditions on weekly basis.❖ Assistance in field piping system test packages including system limit on P&ID and piping Isometrics.❖ Line checking as per approved isometrics drawing, piping and instrument diagram.❖ Verifying contractor manpower and resources as per weekly plan and target❖ Reviewing and approving contractor DPR and reporting to higher level management❖ Reviewing with client for daily production and work priority. Show less

    • Cairn Oil and Gas

      May 2011 - Sept 2012
      Project Engineer

      ❖ Managing all AG piping & equipment installation of Water Injection Unit (WIU) and Power Fluid Unit (PFU) at EORP project including Flare installation❖ Assistance to Rigging team for scope clarification and readiness of lifting gears for equipment installation❖ Monitoring Off site fabrication (Shop Fabrication) to ensure the smooth flow of piping spools at site based on the process priorities❖ Resolved engineering disputes at site due to difference in drawing versus actual site conditions❖ Ensuring contractor for the timely readiness of the hydrotest packages to start field testing.❖ Guiding the team for post punch list closing prior to sign off the test packages re-instatement to start system pre-commissioning❖ Managing overall pre-commissioning activities required to bring the project from Construction Completion to Mechanical Completion❖ Procedures associated with Pre-Commissioning activities are rolled out and adopted by the Pre-Commissioning Team❖ Monitoring contractor materials and resources to perform de-watering, swabbing, air drying and nitrogen purging after completion of Hydro-test and ensuring timely submission of reports❖ Review & comment contractors’ Pre-Commissioning submittals such as Method statement, Procedures and Test plan.❖ Providing necessary support for contractor related to engineering issues, Work permit issuance, QC & HSE submittals approvals❖ Ensuring all the constructional activities shall be carried out with the latest Revision of drawings.❖ Defining priorities to Civil & Structural team for continuous feed for equipment and piping installation team❖ Review, comment, and approval of contractor claims for additional works❖ Making sure the completion of assigned job as per the schedule in adhere with the company’s quality, health, safety, and environmental policy Show less

    • AYTB

      Jan 2013 - now

      ❖ Reported directly to Project Manager and Project Director, Managed projects from commencement to completion including Fabrication, Construction, Testing, Pre-Commissioning, and commissioning.❖ Handled Shutdown/Turnarounds from start to completion up to closing phase including site visit, proposals, preparations, mobilization, execution of shutdown, de-mobilization, and close–up❖ Developing, updating, and controlling of Construction execution plan (CEP)❖ Provided support for engineering, scheduling, progress monitoring and coordination with client for EOT and additional scope of works claims❖ Fix week plan implementation to maximize Cost performance index (CPI), with goal to catch project SPI.❖ Project progress review meetings with client/Sub-contractor focusing on the Progress, defined stage wise KPI’s, delivery of Milestones, risks identification and their mitigation.❖ Subcontractors monitoring at each stage to ensure proper resource mobilization and compliance of technical aspects of the contract.❖ Identifying roadblocks related to documents approval, material availability, resources, third party certification to avoid any idling and any delays.❖ Chasing of technical queries and site instructions, provided technical guidance recommends alternative methods for work to expedite schedule❖ Liaising with operation for steam supply to start the system steam blowing and ensuring sub-contractor readiness in terms manpower and resources (Temporary spools, silencers).❖ Lube oil flushing, Motor solo run and nozzle alignment to ensure the final box up of compressor & pump complies with operation and vendor requirements.❖ Coordinating the readiness of other disciplines and offering the unit for PMCC walkthrough in consultation with the client and operation. Show less

      • Construction Manager at Sasref AXL Project

        Apr 2023 - now
      • Execution Manager at Saudi Kayan TA 2023

        Mar 2023 - Apr 2023
      • Execution Manager at SADARA Plastic TA 2023

        Jan 2023 - Feb 2023
      • Execution Manager at Petro Rabigh TA 2023

        Nov 2022 - Dec 2022
      • Mechanical Superintendent at Al Bayroni TA 2022

        Jul 2022 - Nov 2022
      • Execution Manager at Saudi Aramco (Safaniya - Fire Water Upgradation Project)

        Jan 2022 - Jun 2022
      • Execution Manager at SADARA ISOTA 2021

        Oct 2021 - Dec 2021
      • Mechanical Superintendent at Tecnicas Reunidas (Ras Tanura)

        Jul 2018 - Sept 2021
      • Mechanical Superintendent at SADARA MOC Projects

        May 2017 - Jun 2018
      • Mechanical Superintendent at Petrokemya TA17

        Jan 2017 - Apr 2017
      • Mechanical Superintendent at Saudi Chevron TA 2016

        Sept 2016 - Dec 2016
      • Project Engineer at SADARA Off Plot Project

        May 2013 - Aug 2016
      • Project Engineer at SAMREF TA 2013

        Jan 2013 - Apr 2013
  • Licenses & Certifications

    • ASNT NDT Level II (ASNT)

      Inspection Advance Technology
      May 2009
    • Piping Design Engineering Course

      Design Techniques Ltd
      Jan 2008
    • Project Management Professional (PMP)®

      Project Management Institute
      Mar 2022
      View certificate certificate
    • Project Management Professional (PMP)

      Project Management Institute