Sunil Sharma

Sunil Sharma

Asst Engineer

Followers of Sunil Sharma304 followers
location of Sunil SharmaMumbai, Maharashtra, India

Connect with Sunil Sharma to Send Message

Connect

Connect with Sunil Sharma to Send Message

Connect
  • Timeline

  • About me

    Project Manager / Team Leader

  • Education

    • J. S. University, Shikohabad

      -
      Masters in Structural Engineering Civil Engineering First class
    • J. S. University, Shikohabad

      2020 - 2022
      Master of Engineering - MEng Structural Engineering First Class

      Structural Dynamics, Advanced concrete design, Finite Element Methods, Pre-Stressed Concrete, Advanced steel design, Stability of structure, Earthquake resistant design of structure, Composite Material.

    • Baba Sahab Dr. Bhimrao Ambedkar university , Aurangabad, Maharasthra

      1995 - 1998
      Bachelor of Engineering - BE Civil Engineering Frist class with distension
  • Experience

    • Gammon India Ltd

      Sept 1998 - Feb 2003
      Asst Engineer

      Involve in construction of minor bridges and road work, all activity for minor bridge like execution of piles –1000 mm dia upto depth of 26 m. Construction of structures like builtup piles, pile cap, abutment shaft and pier cap. Execution of road works 6 lanes from embankment to DBM layer (subgrade I &II, GSB,WMM, DBM etc).

    • Larsen & Toubro

      Mar 2003 - Feb 2007
      Asst. Conctruction MAnager

      2 lane, twin type segmental casting bridge with well foundation over river ganga of length 1010m. 26 well foundations and 676 Nos. of Box segments with 12T15 & 19T15 pre- stressing type. Overall project cost 1080 million (tender). Responsible for casting of box segments with all activities like shutter movement, rebar, concreting, lifting of segment from bed and dispatching for erection.

    • Shanfari Trading & Contracting LLC

      Mar 2007 - Nov 2010
      Project Manager

      Worked with M/s Shanfari Trading and contracting LLC as project manager based at Muscat, Oman for Salalaha Tumrate road project – Construction of 6 bridges with 8 to 10 spans, I beam and Box girder type.Design and construction of formation including WMM, GSB, DBM, BC, Bridges, vehicular underpass, Gazain Miskin road project at Khabura, Oman. Internal road for sohar aluminium smelter project for Bechtel at sohar, Oman

    • KAS

      Dec 2010 - Feb 2015
      Project Manager

      I have 18 years experience in Project planning, site Engg., Construction management & co-ordination. Construction of Roads national highway & state highway and bridges – Pre-stress balance cantilever type (upto 95 m span), I Girder, solid slabs, piling work, well foundation, construction of under-ground metro corridor.

    • Ministry of Development - PWD

      Mar 2015 - Jan 2020
      Resident Engineer - Structures

      A Civil engineering professional with 22 years of national and international project execution experience in Infrastructure (Bridges – Stay cable, Balance cantilever Box Girder, I beam, solid slab and void slabs) and construction of highways, Commercial Construction Sector.

    • LEA Associates South Asia Private Limited

      Jan 2020 - Feb 2021
      Team Leader cum Sr. Bridge Engineer

      Construction of 6 lane Aunta Simaria Road project with extra dosed bridge of 1.85 kmConstruction of extra dosed stay cable bridge with 12 meter diameter well foundation with segmental bridge (32 meter wide 6 lane with walkway). Overall 8.5 km road with RE wall, vehicular underpass and 3 ROB with high embankment.

    • Egis in India

      Feb 2021 - Dec 2021
      Project Manager / Team Leader

      Consultancy Services for Project Management, Design of all components (Bridge, underpass, culvert, sea wall reclamation etc., Construction Supervision, Quality and Safety Assurance, Quality Control, for Mumbai costal road project, Package II: Baroda palace to Worli end of Bandra Worli Sea Link (BWSL).• Design and Construction of interchange with 6 arms at different elevation including main bridge with 8 lanes (4+4) of length 1 km• Construction of monopile for main bridge and interchange arms of different diameter i.e. 2.5m, 3.0m & 3.5m with variable depths.• Design co-ordination between contractor designer and PMC’s designer for all permanent and temporary work design of main bridge, Interchange Bridge, monopile, group piles, vehicle underpass (VUP), public underpass (PUP), culverts, sea wall, reclamation etc. • Project consist of Reclamation (31 Ha), Sea wall & Armour rock protection (2.8 KM), underground multi-storey car parks, vehicle underpass, public under passes.• Construction of retaining walls for interchange arms.• Super structure: Segmental casting with 3 meter average segment length and 18 meter width. Casting of segments by long line and short line method. Segment erection at 75m radius. Mumbai costal road project, Package II: Baroda palace to Worli end of Bandra Worli Sea Link (BWSL). Show less

  • Licenses & Certifications

    • B. E. Civil

      Dr. B.A. Marathwada university