Andrei Mester, PMP

Andrei Mester, PMP

Assistant to CFO

Followers of Andrei Mester, PMP762 followers
location of Andrei Mester, PMPTimiş, Romania

Connect with Andrei Mester, PMP to Send Message

Connect

Connect with Andrei Mester, PMP to Send Message

Connect
  • Timeline

  • About me

    Project Manager at Magna Electronics Romania

  • Education

    • West University of Timisoara

      2021 - 2026
      Master's degree Human Resources Management
    • Minnesota State University, Moorhead

      2004 - 2008
      Bachelor of Science Finance 2.45 GPA

      The School of Business maintains the prestigious AACSB International accreditation for excellence in business education, a distinction held by less than five percent of the world’s business schools. As one of the leading business programs in the region, its curriculum consists of a unique blend of theoretical and practical, real-world insights taught in state-of-the-art multimedia classrooms and computer labs. (MSUM website)

  • Experience

    • Intesa Sanpaolo Bank Romania

      Jun 2009 - Sept 2010
      Assistant to CFO

      • Presentation of various reports for top management meetings.• Risk analysis in various fields of major credit exposure.• Economic and financial analysis in the bank management department.• Negotiation of contracts in various fields of acquisitions. Cost savings worth 350k euro over a 6 month period.

    • Leoni

      Jan 2011 - Jun 2012
      Process Engineer

      • Controlling production process in three different production areas.• Improving production process in areas where KPI are critical.• Supervising a weekly PFMEA reviewing the issues and new process additions in the production area.

    • LEONI

      Mar 2013 - Oct 2014

      • Delivering production amount based on forecast, in the amount of 400k euro per week.• Solving problems in bottle neck situations and proposing. continuous improvement actions based on observed activity.• Reading production patterns and anticipating problems based on past problems.• Ensuring effective top management escalation.• Proposing and sustaining a budget for the new fiscal year.• Evaluating team and personal performance.• Coordinating effectively 360 people on continental shift with 8 team leaders. Show less

      • Segment Leader

        Nov 2013 - Oct 2014
      • Operations Team Learder

        Mar 2013 - Nov 2013
    • Adient

      Oct 2014 - Sept 2018
      Launch Engineer

      • coordinate launch activities for new projects and industrialisation process responsible.• project reporting to management in OPS meetings, in terms of cost, time and quality.• process FMEA champion and tolerance review responsible and change management process responsible for all serial products.• manufacturing process responsible for new projects.

    • Atos

      Sept 2018 - Jan 2024
      Project Manager

      SIEMENS | Jun. 2023 – Jan. 2024• Network Policy Audit and Control Project is a 10 sites deployment pilot project implementing Tufin, a security policy management solution specialized in the automation of security policy, and documentation preparation that will be the first phase of the entire deployment of the 100+ Siemens sites. ETC for this project is Octomber-2023.COVESTRO | Mar. 2021 – May 2023• Covestro Network Improvement Project, composed of multiple projects regarding MDS migration and upgrade, onsite device instalation, cluster creation, interface aplication creation, AWS cloud FW instalation, annual software instalation (Checkpoint technology)NOVOZYMES | Sep. 2018 – Feb. 2021• Future Global Network Project, converting old Legacy network based on MPLS design to Future Global Network based on iWAN design, in 103 locations worldwide with a team made up of 2 architects and 7 engineers (Cisco technology)ATOS DENMARK | Sep. 2018 – Feb. 2021• Multiple infrastructure improvement projects regarding Data Center core swap from Extreme Network to Nexus 7K and smooth replacement of 1000+ public IPs with minimum impact on customer services Show less

    • Magna Electronics Limited

      Jan 2024 - Aug 2025
      Project Manager

      DevOps | Jun. 2025 – Oct. 2025• Smart Data Cache - a solution aiming to optimize data retrieval from cloud to on-prem compute nodes, this approach not only reduces the number of egress requests but also enhances overall system performance.Infrastructure | Aug. 2024 – Jul. 2025• Frankfurt DC move – implied moving a DC center from Digital Reality vendor to Equinix vendor both in Frankfurt, serving as one of the main DC for Magna Electronics globally, there was a challenge to organize phase by phase in such a way that there was a minimal 36 hour weekend downtimeProduct Lifecycle Management | Jan. 2024 – Jul. 2024• PLM improving and migration - after Magna’s acquisition of Veoneer’s Active Safety, there was a need for migrating from Enovia (Veoneer’s PLM) to Windchill (Magna’s PLM) at the same time with improving engineering gaps that were deemed essential or bringing added value to the business Show less

  • Licenses & Certifications