Thet Phu Wai

Thet Phu Wai

Electrical Engineer

Followers of Thet Phu Wai836 followers
location of Thet Phu WaiYangon, Myanmar

Connect with Thet Phu Wai to Send Message

Connect

Connect with Thet Phu Wai to Send Message

Connect
  • Timeline

  • About me

    QC Engineer at Fujita Corporation Co.,Ltd

  • Education

    • TU(Mawlamyine)

      2015 - 2016
      Bachelor of Engineering - BE Electrical Power Engineering BE EP-12
    • TU (Mawlamyine)

      2011 - 2015
      Bachelor of Technology - BTech Electrical Power Engineering
  • Experience

    • Khin Maung Nyunt Trading Co., Ltd.

      Mar 2017 - Feb 2018
      Electrical Engineer

      Responsibilities:- Panel Control wiring installation – assemble the wiring control of the electrical panel as per control schematics drawings.- Inspect and test the completed panels.- Strongly knowledge of electrical control wiring, HT, and LT systems- Able to in electrical control system troubleshooting work. - Performed the electrical panel control wiring installation conditioning system.

    • Capital Development Limited

      Mar 2018 - Jul 2022
      Facilities Engineer

      COMPANY : Capital Development Limited DURATION : March 2018 to July 2022 ROLE : Facilities Engineer PROJECT : The Capital Mall-YGN,Yangon,MyanmarResponsibilities- Performed work instructions, checklist, and PM work of the equipment per schedule - Carry out the routine checks of building facilities, and attend service complaints and repair with CM forms the complaint work order.- Troubleshooting electrical, ACMV, generator, and sewage systems & contact outsources for repair of major works- Prepare root cause investigating report and preparing the required documents (Defect note, scope of works, and MOS).- Prepared Commercial Bid comparison for all rectification and renovation work.- Supervision of contractors for timely, work progress and quality control.- Conduct the guideline, review, and supervise the renovation drawing of tenants.( M&E,3D designs, Detail Drawing of tenants).- Proper record of service report, asset database, spare parts, O&M manual, and submission of the payment process.- Record tenant meter and do monthly utility calculation and diesel consumption of generator- Maintained stock of spare parts and prepare VO and indent for the procurement process.Achievement Projects @ The Capital Mall YGN- Mall façade and canopy renovation work (To improve mall look)- 33kV HT room relocation work and 4-storeyed building High tension system reinstallation work. Show less

    • Fujita Corporation

      Aug 2022 - Aug 2023
      QC Engineer

      COMPANY : Fujita Corporation Co.,Ltd (Yangon Branch) DURATION : August 2022 to Present ROLE : QC engineer PROJECT: Yangon- Mandalay Railway Improvement Project Phase IResponsibilities- Implement all works are as per QA/QC Procedure & Checked with Inspection Test Plan (ITP)- Do quality records, and prepare non-conformities (NCR), daily, weekly & monthly progress reports.- Inspection of material receiving, cable Testing & all MEP works.- Attend site progress meetings, and coordination meetings .- Prepared AS-BUILT drawings and supervision on all building M&E system installation work (Lighting, power, ACMV, Lightning Protection system, and fire system). - Inspected casting work and other building civil work (rebar installation, formwork installation, brickwork, plastering, waterproofing, painting work)Achievement Projects- Project: Yangon- Mandalay Railway Improvement Project( The relay house and signal cabin building facilities works) Show less

    • Capital Development Limited ( Facilites Service )

      Aug 2023 - now
      Assistant Facilities Manager

      Responsibilities- Oversee, Supervise and lead a team of senior engineers, technicians, and operation supervisors in FM services for the Shopping Mall.- Establish good working relationships & develop trust with tenants and internal teams.- Overview of all works ( CM & contractor works) as per SOP and quality service standards.- Scheduled maintenance activities for ACMV systems & All MEP systems, tracking of maintenance works and follow-up actions for PM & CM works.- Handled tenants’ enquiries & complaints.- Control the project costing and cost management.- Provided technical training for staff’s skill improvement.- Prepared the annual budget submission, audit report,accident/incident reports, assessment report for contractors' performance and other related reports.- Manage and liaise with outsources on new initiatives and major repairs and maintenance works- Prepared tender documents and specifications, plan, coordinate and executed rectification works.- Supervised & Overviewed the major repair, maintenance works and rectification works.Achievement Projects @ The Capital Mall YGN- Air con system renovation work ( AHU system & Floor stand System )( Project Cost – 651,390 SGD )- Ceiling subframe, walkway, monkey ladder, ceiling frame & ceiling renovation work ( Total Sq-m - 4200) ( Project Cost – 161,000 SGD ) - Toilet & Gurad house renovation work - 200 mm Additional Rain water down take pipe installation work ( L3 to L1 )- 150 mm kitchen waste pipeline changing work ( Total - 127 m )- Additional 25 cubic meter of grease trap installation work at Sewage Treatment System( Maintained & Supervises Facilities Services at Capital Mall – YGN with no breakedown of any systems.) Show less

  • Licenses & Certifications

    • -EI 2 nd Grade Certificator

      Electrical Inspection Department ,Directroate of Industrial Supervision and Inspection
    • Auot cad 2D/3D

      Quickcad Computer Traning Center
    • Electrical Design

      SNL Engineering Traning Center
      Aug 2019
  • Volunteer Experience

    • Student Volunteer

      Issued by TU- Mawlamyine
      TU- MawlamyineAssociated with Thet Phu Wai