Mahmoud Amin

Mahmoud Amin

Site Civil Engineer

Followers of Mahmoud Amin4000 followers
location of Mahmoud AminCairo, Egypt

Connect with Mahmoud Amin to Send Message

Connect

Connect with Mahmoud Amin to Send Message

Connect
  • Timeline

  • About me

    Station Manager at VINCI Construction Grands Projets, Cairo Metro Line 3, Phase 3C

  • Education

    • Amir Al Shoaraa Secondary School

      2005 - 2008
      95.12%
    • Helwan University Cairo

      2008 - 2013
      Bachelor's degree Civil Engineering 4th Year Grade: Good (70.6%)

      Graduation project: Structural analysis (Full design of high-rise residential building with full planning stages) Grade: Excellent (188/200)

  • Experience

    • Engineering Division, Air Defence Forces

      Dec 2013 - Jun 2015
      Site Civil Engineer

      Contractor: Al-Etemad for contractingAs a Site Engineer I was responsible for managing and supervising: Concrete hangars (20m * 50m, 15m in height), Steel sunshades and 2000m concrete fences.

    • VINCI Construction Grands Projets

      Jun 2015 - now

      As a site engineer (shift leader of civil works crew) I was responsible for:* Early assigned to the project to be responsible for all site works and arrangements like Traffic diversion and transfer, Make a Compensatory asphalted roads, u-turns, and parking, Fencing the project, Make the Mobilization area and offices area* Responsible for coordination with all other parties companies for utility relocation while constructing the station* Supervising "Bauer ", the subcontractor company responsible for constructing the Diaphragm walls of the station by using Hydrofraise machine ;(including The mobilization of Hydrofraise, Construction of guide wall, Dewatering using Deep well system, Panel reinforcement, Slurry walls)* Supervising Earthworks using excavators and clamshell, and constructing supporting struts (both inclined and horizontal) and monorail system under slabs.* Supervising formwork for all slabs using sand cement on-grade, scaffolding systems (Mills, Acro, Doka, Peri .. etc) and Steel work to all slabs (including high usage of steel couplers at the connection between slabs and D.W.) and concreting using ‘’ CEM3’’ concrete.* Supervising watertightness for raft and roof slabs of the station * Stick to the schedule, and supervising temporary works around the site* Technical support for the team, liaising with the design department to solve clashes, and send RFIs for missing data or any conflict* Make daily and weekly reports for production rates to help the company and to be recorded as historical data can be used for similar projects and sending daily reports to the consultant for the work in progress * Ensure all operations are undertaken in a safe manner in accordance with company H&S policies and HSE plan (including daily Prestart meetings, and toolbox talks) * All construction detailed methods are performed by the method team of the technical office and to be followed on site عرض أقل As a Civil Works Engineer I was responsible for: * Constructing the main logistics area for Line Metro 3 Phase 4A including Steelyard, mechanical, electricity, welding and carpentry workshops, mortar plant for boring tunnels materials, weighbridge, main storage area, a concrete laboratory, offices area for company top management including its landscape, amenities area for more than 300 workers and 2 mosques.* Managing a large area for producing various precast elements for all stations and annexes related to Phase 4A including hundreds of L-walls, platform slabs, and walls, curbs, slabs for berlin walls system and foundations for high electricity towers. عرض أقل

      • Station Manager

        Jun 2023 - now
      • Senior Civil Works Engineer

        Dec 2019 - May 2023
      • Civil Works Engineer

        Feb 2016 - Dec 2019
      • Civil Works Engineer

        Aug 2015 - Feb 2016
      • Civil Works Engineer

        Jun 2015 - Aug 2015
  • Licenses & Certifications

    • Safety Boost Programme

      Frank Viscuso Training
      Feb 2016
    • The Proper Use of Selected Crosby Lifting & Rigging Products

      The Crosby Group
      Jan 2016
    • On-Site Accident Investigation Training

      SGS
      Nov 2018
    • Lifting Operation

      VINCI Construction Grands Projets
      Oct 2020
    • Health and Safety Fondamentals

      VINCI Construction Grands Projets
      Oct 2017
    • Advanced Rigging Training (Skill Up Building Competencies)

      VINCI Construction Grands Projets
      Dec 2016
    • Temporary Works

      VINCI Construction Grands Projets
      Sept 2020
  • Honors & Awards

    • Awarded to Mahmoud Amin
      Chosen for a business trip to France (Paris and Rennes) Dec 2015 for a week, concentrated on safety procedures at construction sites and new techniques of excavation - Dec 2015
  • Volunteer Experience

    • Volunteer

      Issued by Resala Charity Organization | جمعية رسالة للأعمال الخيرية
      Resala Charity Organization | جمعية رسالة للأعمال الخيريةAssociated with Mahmoud Amin